M 16/244
Register summary
- Holder
- Paddington Gold Pty Limited
- Local government
- Shire of Coolgardie
- Application received
- 19 June 1995
- Commenced
- 7 Dec 1998
- Expiry
- 6 Dec 2040
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | <1% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A124749 | 2020 | Paddington Gold Pty Limited | Carbine | 2.6% | Carbine Project Mineral Exploration Report C188/2008 for the period 1 July 2019 to 30 June 2020 |
| A120901 | 2019 | Paddington Gold Pty Limited | Carbine | 2.3% | Carbine Project C188/2008 Mineral Eploration Report for the period 1 July 2018 to 30 June 2019 |
| A121661 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2621 Final Report For the Period 15 March 2017 to 16 February 2018 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | <1% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
87 more reports
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | <1% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117516 | 2018 | Paddington Gold Pty Ltd | Carbine | 2.3% | Carbine Project Mineral Eploration Report, C188/2008, 01 July 2017 - 30 June 2018 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | <1% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A113875 | 2017 | Torian Resources Limited | Balgarrie | <1% | Balgarrie Project C52/2011 Annual Report For the Period 15 March 2016 to 14 March 2017, P16/02621, P16/02622, |
| A114436 | 2017 | Paddington Gold Pty Ltd | Carbine | 2.3% | Carbine Project Annual Mineral Exploration Report C188/2008 for the period 1 July 2016 to 30 June 2017 |
| A108698 | 2016 | Cascade Resources Ltd | Balgarrie | <1% | Balgarrie Project C52/2011, P16/02621, P16/02622, P16/02623 Annual Report for the period 15/03/2015 to 14/03/2 |
| A109701 | 2016 | Paddington Gold Pty Ltd | Carbine | 2.2% | Carbine Project C188/2008 Mineral Exploration Report for the period 1 July 2015 to 30 June 2016 |
| A106587 | 2015 | Paddington Gold Pty Ltd | Carbine | 2.2% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2014 to 30 June 2015 |
| A107613 | 2015 | Phoenix Gold Limited | Broads Dam | <1% | Broad Dam Project C194/2010 Combined Mineral Exploration Report for the period 1st October 2014 to 30th Septem |
| A103166 | 2014 | Paddington Gold Pty Ltd | Carbine | 2% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2013 to 30 June 2014, M16/23, M1 |
| A103681 | 2014 | Phoenix Gold Limited | Broads Dam | <1% | Broad Dam Project C194/2010 Annual Mineral Exploration Report for Period 1/10/13 to 30/09/14 |
| A98824 | 2013 | Paddington Gold Pty Ltd | Carbine | 2.7% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1 July 2012 to 30 June 2013, M16/23, M1 |
| A97753 | 2013 | Kalgoorlie Mining Company (Bullant) | Bullant | <1% | Combined annual report for the Bullant Project, C24/2011 (M16/44–45, P16/2689 & P16/2694-2701), Coolgardie Min |
| A98139 | 2013 | Phoenix Gold Limited | Red Dam | <1% | Red Dam Project, Annual Report for the period 19th April 2012 to 18th April 2013, M16/344. |
| A98371 | 2013 | Western Resources Pty Ltd | Balgarrie | <1% | Annual Report for the period 15 March 2012 to 14 March 2013, Balgarrie Project, Combined Reporting Group C52/2 |
| A100441 | 2013 | Phoenix Gold Limited | Broads Dam | <1% | Mineral Exploration Report for Period 1/10/12 to 30/09/13 Broads Dam Project |
| A93643 | 2012 | Siburan Resources Limited | Balgarrie | <1% | Annual report Balgarrie Project Exploration Licence P16/2621, P16/2622 & P16/2623 C52/2011 Period 15 March 201 |
| A94764 | 2012 | Paddington Gold Pty Ltd | Carbine | 2.7% | Carbine Project, Mineral Exploration Report, C188/2008, Reporting Period: 1 July 2011 to 30 June 2012 |
| A93602 | 2012 | Kalgoorlie Mining Company (Bullant) | Bullant | <1% | Combined annual report for the Bullant Project, C24/2011 (M16/44–45), Coolgardie Mineral Field, for the period |
| A94030 | 2012 | Carbine Resources Ltd | Red Dam | <1% | Red Dam Project M16/344 Annual Technical Report 2011 - 2012 |
| A90210 | 2011 | Siburan Resources Limited | Balgarrie | <1% | Balgarrie Project, Annual Report for the period 15th March 2010 to 14th March 2011, P16/2621, P16/ 2622 & P16/ |
| A91106 | 2011 | Argent (Bullant) Pty Ltd | Bullant | <1% | Annual report for the Bullant Project, C24/2011 (M16/44–45), Coolgardie Mineral Field, for the period 9 March |
| A91144 | 2011 | Paddington Gold Pty Ltd | Carbine | 1.7% | Carbine Project Mineral Exploration Report C188/2008, Reporting Period: 1 July 2010 to 30 June 2011 |
| A90864 | 2011 | Carbine Resources Ltd | Red Dam | <1% | Red Dam Project M16/344, Annual Technical Report 2010 - 2011 |
| A86740 | 2010 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | Project 8529, North Zuleika, M16/188, M16/239, M16/27, M16/411, M16/44, M16/45, P16/2508, Annual Report, Perio |
| A87601 | 2010 | Paddington Gold Pty Ltd | Carbine | 2.3% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1July 2009 to 30 June 2010 |
| A87961 | 2010 | Carbine Resources Ltd | Red Dam | <1% | Red Dam Project M16/344, Annual Technical Report. |
| A82319 | 2009 | Barrick Gold Of Australia Ltd | NORTH ZULEIKA | <1% | PROJECT 8529 NORTH ZULEIKA C303/1997 M16/188, M16/239, M16/27, M16/411, M16/44, M16/45, P16/2508, ANNUAL REPOR |
| A82774 | 2009 | Carbine Resources Ltd | Red Dam | <1% | Red Dam Project M16/344 Annual Technical Report |
| A84715 | 2009 | Paddington Gold Pty Ltd | Carbine | 2.3% | Carbine Mineral Exploration Report, Period 1 July 2008 to 30 June 2009, Tenements: M16/23, M16/48, M16/58, M16 |
| A78111 | 2008 | Carbine Resources Ltd | Red Dam | <1% | Red Dam Project M16/344 Annual Technical Report RD_2007A |
| A78277 | 2008 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | ANNUAL REPORT Period 9 March 2007 - 8 March 2008 TECHNICAL REPORT No. 1267 C303/1997 PROJECT 8518, 8529, 8536, |
| A77188 | 2008 | Monarch Gold Mining Company Ltd | Davyhurst | <1% | DAVYHURST PROJECT Reporting Group C189/2007 Report Type: Annual Technical Report Report Period: 2 November 200 |
| A74388 | 2007 | Monarch Gold Mining Company Ltd | Carbine | 2.9% | Carbine Project M16/86, 143, 150, 164, 212, 244, P16/1439, 1512, 1570-73, 1816, 1915-16, 2178-82, 2006 Annual |
| A74832 | 2007 | Barrick Gold Of Australia Ltd | North Zuleika | <1% | North Zuleika Project C303/1997 Annual Report, Period 9 March 2006 - 8 March 2007 Report No.1223 (Kalgoorlie) |
| A71671 | 2006 | Siberia Mining Corporation Ltd | Red Dam | 78% | Red Dam Project M16/244, Annual Technical Report 7/12/04 - 6/12/05, (Kalgoorlie). |
| A71993 | 2006 | Siberia Mining Corporation Ltd | Carbine | 3.3% | Carbine Project, Annual Technical Report 01/01/2005 to 31/12/2005, Combined Reporting No. C109/2005, Kalgoorli |
| A72335 | 2006 | Placer Dome Asia Pacific Ltd | North Zuleika | <1% | North Zuleika Project, Annual Report, 9 March 2005 to 8 March 2006, Combined Reporting No. C303/1997, (PDAP Re |
| A74655 | 2006 | Siberia Mining Corporation Ltd | Carbine | 2.7% | Carbine Project , Annual Report for the period 01/01/2006 to 31/12/2006, P16/1577-1578 (C78/2006) |
| A69817 | 2005 | Siberia Mining Corporation Ltd | Red Dam | 78% | Red Dam Project, M16/244, Annual technical Report 07/12/03 - 06/12/04 Kalgoorlie |
| A70172 | 2005 | Siberia Mining Corporation Ltd | Carbine | 9.6% | Annual technical report for the period 27/01/04 - 26/01/05 Carbine Project, P16/1915, Kalgoorlie |
| A70420 | 2005 | Placer Dome Asia Pacific Ltd | North Zuleika | <1% | North Zuleika Project, Annual Report 9 March 2004 to 8 Marc h 2005 C303/1997 M16/23...M16/411, P16/1373...P24/ |
| A70709 | 2005 | Siberia Mining Corporation Ltd | Red Dam | 2.7% | Carbine Project - Red Dam P16/1577-1578, Annual technical report 6/04/04 - 5/04/05 (C226/1996, Kalgoorlie). |
| A71206 | 2005 | Siberia Mining Corporation Ltd | Matt Dam (Little Crest Dam) | <1% | Matt Dam Project M16/150, Annual Technical Report 03/08/04-02/08/05, (Kalgoorlie). |
| A68508 | 2004 | Placer Dome Asia Pacific Ltd | Carbine/Zuleika | 1.6% | Carbine/Zuleika Project Annual Report 09/03/2003 to 08/03/20 04 C303/1997 M16/27...M16/411, P16/1439...P24/335 |
| A68748 | 2004 | Allied Gold Ltd | Red Dam | 2.7% | Red Dam Project, P16/1577, P16/1578, Annual Report 06/04/2003-05/04. Allied Rept No 2004/1 |
| A69688 | 2004 | Siberia Mining Corporation Ltd | Red Dam | 13% | Annual technical report for the period 06/10/03 - 05/10/04 Red Dam Project, P16/2078, Kalgoorlie |
| A66658 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | 1.6% | Carbine/ Zuleika Project, Annual Report 09/03/2002 - 08/03/2003 C303/1997: M16/27, 44-5, 48, 58, 86, 106, 143, |
| A66665 | 2003 | Allied Mining And Processing Ltd | Red Dam | 2.7% | Red Dam Project, P16/1577 & P16/1578,Annual Report 6 April 2002 - 5 April 2003. C226/1996: Allied Mining Techn |
| A65102 | 2002 | Auriongold Exploration Pty Ltd | Carbine Zuleika | 1.6% | Annual Report Reporting Period 09/03/2000 - 08/03/2002 Combined Reporting NO C303/1997. Tenement/s M16/23, 27, |
| A61372 | 2000 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | Mining Leases M16/23,27,44,45,58,86,106,143,150,156,164,188, 212, Prospecting Licences P16/1353-1356,1373,1439 |
| A60612 | 2000 | Homestake Gold Of Australia Ltd | Red Dam | 2.7% | Project 6564, Red Dam Project, P16/1577,1578, Annual Report, 6 April 1999 to 5 April 2000, Technical Report No |
| A62574 | 2000 | Homestake Gold Of Australia Ltd | Red Dam | 2.7% | Project 6564 Red Dam Project P16/1577 & P16/1578 Annual Report 6 April 2000 - 5 April 2001. Technical Report N |
| A59105 | 1999 | Centaur Mining & Exploration Ltd | Carbine Zuleika | 1.9% | C303/1997 - Carbine - Zuleika, Joint Annual Report For the Period 9/03/1998 to 8/03/1999 (M16/23, M16/27, M16/ |
| A58280 | 1999 | Homestake Gold Of Australia Ltd | Red Dam | 2.7% | Red Dam Project - P16/1577, 1578 Annual Report 06/04/98 - 05/04/99 |
| A61943 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Non-statutory Report: Resources Report June 1999. |
| A54789 | 1998 | Plutonic Operations Ltd | Plutonic | 2.7% | Plutonic Project 564 - Red Dam Project, P16/1577-1578 Annual Report, 06/04/1997 to 05/04/1998 |
| A55230 | 1998 | Centaur Mining & Exploration Ltd | Carbine Zuleika | 1.9% | C303/1997 - Carbine/Zuleika Joint Annual Report 09/03/97 - 08/03/98 Mining Licence: M16/23, 27, 44-45, 48, 58, |
| A51281 | 1997 | Plutonic Operations Ltd | Red Dam | 3.2% | Project 564 Red Dam Project P16/1578 and P16/1579 Final Surrender Report 06/04/93 to 05/04/97 WA Technical Rep |
| A51241 | 1997 | Plutonic Operations Ltd | Red Dam | 2% | Project 564 Red Dam Project P16/1577 P16/1578 and P16/1579 Annual report 06/04/96 to 05/04/97 WA Technical Rep |
| A47174 | 1996 | Newcrest Mining Ltd | Zuleika | 6.3% | Ora Banda Gold Mine Zuleika Project Exploration report on leases M16/44 M16/45 M16/48 M16/86 M16/156 M16/212 P |
| A47898 | 1996 | Plutonic Operations Ltd | Red Dam | 2% | Project 564 Red Dam Project P16/1577 to P16/1579 Annual report 06/04/95 to 05/04/96 Plutonic Operations Limite |
| A48542 | 1996 | Newcrest Mining Ltd | Breakaway Dam | <1% | Newcrest Report No. WORA 104 OB No. 352 Ora Banda Gold Mine Breakaway Dam Project M16/58 M16/106 M16/143 M16/1 |
| A43861 | 1995 | Newcrest Mining Ltd | Zuleika | 6.3% | Ora Banda Gold Mine Zuleika Project Exploration Report on Leases ML16/44 ML16/45 ML15/48 ML16/86 ML16/156 ML16 |
| A44946 | 1995 | Newcrest Mining Ltd | Breakaway Dam | <1% | Newcrest Mining Report No. WORA 85 OB No. 334 Ora Banda Gold Mine Breakaway Dam Project Exploration Report on |
| A41999 | 1994 | Newcrest Mining Ltd | Breakaway Dam | <1% | Breakaway Dam Project Exploration Report on Leases M6/58, M16/106,M16/143,M16/150,M16/164, P16/1439, P6/1570-1 |
| A42077 | 1994 | Newcrest Mining Ltd | Zuleika | 7.2% | Zuleika Project Exploration Report on Leases M16/44-45, M16/48, M16/86, P16/1374 for the period January 1992 |
| A42236 | 1994 | Plutonic Operations Ltd | Red Dam | 1.5% | Annual report for the period 06/04/93 to 05/04/94 Project 564 Red Dam Project P16/1577 to P16/1580 Plutonic Op |
| A39998 | 1993 | Newcrest Mining Ltd | Breakaway Dam | <1% | Breakaway Dam Project Exploration Report on Leases M16/58, M16/106, M16/143, M16/150, M16/164, P16/1439, P16/1 |
| A37373 | 1992 | Newcrest Mining Ltd | Zuleika | 7.2% | Annual Report for the Period 01/01/90 - 01/12/91 Zuleika Project M16/44-45, M16/86, P16/1374 |
| A37470 | 1992 | Newcrest Mining Ltd | Breakaway Dam | <1% | Annual report for the period 05/91 to 05/92 Breakaway Dam Project M16/58, M16/106, M16/143, M16/150, M16/164, |
| A32470 | 1991 | Mt Martin Gold Mines Nl | Red Dam/Seven Dwarfs | 1.5% | Annual report for the period 17/03/90 to 17/03/91 For Mining Lease M16/132 Seven Dwarfs East Coolgardie Minera |
| A32916 | 1991 | Poseidon Ltd | Matt Dam | <1% | Matt Dam Project M16/150 Annual Report 1990 Kalgoorlie 1:250000 Sheet SH 51-9 |
| A31522 | 1990 | Bhp Minerals Pty Ltd | Zuleika | <1% | Zuleika Leases M16/44 and M16/45. Annual Report for the period 02/89-01/90. |
| A31823 | 1990 | Bhp Minerals Pty Ltd | Zuleika | <1% | Zuleika Leases M16/44-45 Annual Report for the Period 02/89 - 01/90 |
| A27605 | 1989 | Pioneer Minerals Aust Ltd | Red Dam | 44% | Project 564: Red Dam Report on RAB drilling Sept 1988 P16/454 to P16/463 and P16/535 to P16/537 Pioneer Minera |
| A23435 | 1988 | Bhp Minerals Pty Ltd | Zuleika | <1% | Zuleika Annual Report for the period 1 January 1987 to 31 December 1987. M16/44 and M16/45. February 1988. BHP |
| A23949 | 1988 | Coolgardie Mining Associates Nl | Dunnsville - Jaurdi Hill | 44% | Jaurdi - Dunnsville Group, Final report for year ended 31 April 1988, P/16/308, P16/438-439, P16/477-480, P16/ |
| A24113 | 1988 | Bhp Minerals Pty Ltd | Zuleika | <1% | Zuleika Report For the period 01/01/88 - 31/05/88 M16/44 and M16/45 |
| A18302 | 1986 | Noranda Australia Ltd | West Black Flag | 44% | Project 564 : Red Dam Preliminary Reconnaissance Mapping field work December 13 to 15, 19858 W.A. Technical Re |
| A20767 | 1986 | Noranda Australia Ltd | Red Dam | 89% | Project 564 Red Dam Report on Follow up RAB Drilling Zuleika Area, October 1986 Prospecting Licence P16/462 W. |
| A18303 | 1986 | Noranda Australia Ltd | West Black Flag | 44% | Project 564: Red Dam Report on Soil Geochemistry April to June 1986 P16/454 to P16/463 P16/535 to P16/537 Nora |
| A22686 | 1753 | Noranda Australia Ltd | West Black Flag | 44% | Project 564 Red Dam Report on RAB Drilling June - July 1987 and Nov 1987. P16/454 to P16/463 and P16/535 to P1 |
| A28039 | 1753 | Bhp Minerals Pty Ltd | Zuleika | <1% | Report on exploration at Zuleika Mining leases M16/44, M16/45, M16/48 06/1988 - 01/1989 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A50373 | 1753 | Centaur Mining & Exploration Ltd | Ora Banda South | 2% | Prospecting Licences P16/1353 to P16/1356 P16/1374 P16/1439 P16/1512 P16/1570 to P16/1573 and Mining Leases M1 |
| A106819 | Placer Dome Asia Pacific Ltd | Paddington - Mount Pleasant | <1% | Joe Lord Core Library Drill Hole Reports BUGD158, BUGD162, BUGD166, BUGD167 From Bullant Underground M16/45 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 14 years · 6 Dec 2040
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 16/244 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 16/244? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.