M 16/260
M 16/260 is a live mining lease in the Shire of Coolgardie, Western Australia, held by Kundana Gold Pty Limited (part of Evolution Mining Limited). Granted on 21 May 1999 for 21 years (renewed), it expires on 20 May 2041. The ground is covered by 96 historical WAMEX reports.
Register summary
- Holder
- Kundana Gold Pty Limited
- Part of
- Evolution Mining Limited (ASX:EVN) as at 2025-06-30
- Local government
- Shire of Coolgardie, City of Kalgoorlie-Boulder
- Application received
- 29 Mar 1995
- Commenced
- 21 May 1999
- Expiry
- 20 May 2041
- Term
- 21 Years (Renewed)
The full record on M 16/260
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 2 changes of holder
- The full record: 29 years of expenditure, 11 conditions and 2 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (13 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A136727 | 2023 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | 1.9% | Final Surrender Report - E15/1351 Kunanalling for the period ending 23/06/2023. |
| A127430 | 2021 | Haddison Pty Ltd | Park Dam | 10% | Park Dam E26/191 Annual Technical Report for the period ending 3/1/2021 |
| A122799 | 2020 | Northern Star (Kanowna) Pty Limited | Kundana | 4.7% | Kundana Annual Report C102/2004 for the period 1 January 2019 to 31 December 2019 |
| A123026 | 2020 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report C1/2017 Mungari Project for the period 1 January 2019 to 31 December 2019 |
| A122845 | 2020 | Haddison Pty Ltd | Park Dam | 10% | Annual Report for the Park Dam Project (E26/191) from 4/1/2019 to 3/1/2020 |
91 more reports
| A119241 | 2019 | Northern Star (Kanowna) Pty Limited | Kundana | 4.8% | Kundana C102/2004 Annual Technical Report for the period 1 January 2018 to 31 December 2018 |
| A119550 | 2019 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report - Group C1/2017 - Mungari Project For the Period 1 January 2018 to 31 December 2018 |
| A119640 | 2019 | Haddison Pty Ltd | Park Dam | 10% | Annual Report for the Park Dam Project (E26/191) from 4/1/2018 to 3/1/2019 |
| A116687 | 2018 | Gianni, Pr | Park Dam | 10% | Annual Report for Peak Dam Project (E26/191) from 4/1/2017 to 3/1/2018 |
| A116058 | 2018 | Northern Star (Kanowna) Pty Limited | Kundana | 4.8% | Kundana C102/2004 Annual Technical Report for the period 1 January 2017 to 31 December 2017 |
| A116230 | 2018 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report Mungari Project C1/2017 For the Period 1 January 2017 to 31 December 2017 |
| A118314 | 2018 | Northern Star Resources Ltd | Black Flag Group | <1% | Black Flag Group EIS Drilling – Final Report (R#15) |
| A112440 | 2017 | Cerep Pty Ltd; Evolution Mining (Mungari) Pty Ltd; Hayes Min | Mungari | <1% | Annual Report for Mungari Project, C1/2017, for the period 1 October 2015 to 31 December 2016, P16/02244 ....E |
| A112160 | 2017 | Northern Star (Kanowna) Pty Limited | Kundana | 5% | Kundana Project C102/2004 Annual Technical Report for the period 1 January 2016 to 31 December 2016, E24/00152 |
| A108144 | 2016 | Northern Star (Kanowna) Pty Limited | Kundana | 4.9% | Kundana Annual Technical Report for the Period 1 January 2015 to 31 December 2015 C102/2004 |
| A108735 | 2016 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Mungari Project C145/2013 Annual Report to the Department of Mines and Petroleum for the period 01/01/2015 to |
| A107060 | 2015 | Ekjv Management Pty Ltd | Eastern Zuleika Shear Definition Program | <1% | Eastern Zuleika Shear Definition Programme - EIS Final Report (R#10) |
| A104917 | 2015 | Northern Star Resources Ltd | Kundana | 4.9% | Kundana Project C102/2004 Annual Report for the period 1 January 2014 – 31 December 2014, E24/152....P26/3574 |
| A105026 | 2015 | La Mancha Resources Australia Pty Ltd | Mungari | <1% | MUNGARI PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the period 01/01/2014 to 31/12/2014 |
| A101174 | 2014 | La Mancha Resources Australia Pty Ltd | Mungari | <1% | Mungari Project C145/2013 Annual Report for the period 01/01/2013 to 31/12/2013, E15/960......P15/5265-5267 |
| A101284 | 2014 | Barrick (Australia Pacific) Ltd | Kundana | 4.3% | Project 8100 Kundana Project 8101 Kundana Project 8103 East Kundana Project 8104 West Kundana Annual Report P |
| A96888 | 2013 | Barrick (Australia Pacific) Ltd | Kundana | 4.3% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA Annual Report P |
| A93042 | 2012 | Barrick Gold Of Australia Ltd | Kundana | 4.3% | ANNUAL REPORT Period 1 January 2011 – 31 December 2011 C102/2004 |
| A85972 | 2010 | Barrick Gold Of Australia Ltd | Kundana | 3.8% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA E15/256, E15/634 |
| A81372 | 2009 | Barrick Gold Of Australia Ltd | KUNDANA | 3.5% | ANNUAL REPORT Period 1 January 2008 – 31 December 2008 C102/2004, PROJECT 8100 KUNDANA, PROJECT 8101 KUNDANA, |
| A77536 | 2008 | Barrick Gold Of Australia Ltd | Kundana | 3.6% | ANNUAL REPORT Period 1 January 2007 - 31 December 2007 KUNDANA PROJECT C102/2004 TECHNICAL REPORT No. 1253 |
| A74407 | 2007 | Barrick Gold Of Australia Ltd | Kundana | 5% | Kundana Project C102/2004 Annual Report 1 January 2006 to 31 December 2006 Technical Report No.1214 (Kalgoorli |
| A74408 | 2007 | Barrick Gold Of Australia Ltd | Abbottoir South | <1% | Abattoir South Project C100/2004 Annual Report for the Period 01/01/2006 to 31/12/2006 Report No.1215 (Kalgoor |
| A72089 | 2006 | Placer Dome Asia Pacific Ltd | Kundana | 5% | Kundana Project, Annual Report 1 January 2005 to 31 December 2005 C102/2004, (PDAP Report No. WA06.012, Kalgoo |
| A72344 | 2006 | Rand Mining Nl | Seven Mile Hill | <1% | Seven Mile Hill Project, Annual Report E15/384,M15/851, Combined Reporting No. C156/1995, 01/01/05 to 31/12/05 |
| A72021 | 2006 | Placer Dome Asia Pacific Ltd | Abattoir South | <1% | Abattoir South Project, Annual Report, 01/01/2005-31/12/2005 (C100/2004), E26/45, E26/53, E26/85, M26/115..... |
| A70352 | 2005 | Placer Dome Asia Pacific Ltd | Kundana | 5% | Kundana Project, Annual report 1 January 2004 to 31 December 2004, C102/2004, E15/256, 634, E16/113, E26/43, M |
| A70355 | 2005 | Rand Mining Nl | Seven Mile Hill | <1% | Annual report for the period 01/01/04 - 31/12/04 Seven Mile Hill Project, C156/1995, E15/234, 378, 384, 385, E |
| A71009 | 2005 | Placer Dome Asia Pacific Ltd | Kundana | <1% | Sub-Audio magnetic survey, Kundana, Placer Dome Asia Pacific Western Australia, Post-activity report (M15/993, |
| A70006 | 2005 | Placer Dome Asia Pacific Ltd | Abbatoir South | <1% | Annual report for the period 01/01/04 - 31/12/04 Abbatoir South Project 8504, C100/2004, E26/45, E26/53, E26/8 |
| A70007 | 2005 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual report for the period 01/01/04 - 31/12/04 Binduli North Joint Venture Project 8504, C202/1995, E26/53, |
| A82885 | 2005 | Placer (Granny Smith) Pty Ltd | Binduli | <1% | Preliminary notes on results of Binduli North IP Surveys, Jan - Feb 2005 |
| A68143 | 2004 | Rand Mining Nl | Seven Mile Hill | <1% | Seven Mile Hill (JV) Project, Annual Report Exploration Licences E15/234, 378, 384-385, & 560; Mining Leases M |
| A68216 | 2004 | Placer Dome Asia Pacific Ltd | Kundana GEM | <1% | Kundana Gem Project ,Annual Report P16/1531-1532,P16/1754-1755, E16/113, M15/993, M16/181-182, M16/213-214, M1 |
| A68571 | 2004 | Mines & Resources Australia Pty Ltd | Park Dam North | 2% | Park Dam North Project, Annual report for the period 22 March 2003 to 21 March 2004 (E15/525) |
| A68234 | 2004 | Placer Dome Asia Pacific Ltd | Kurrawang | 15% | Annual Report for the period 01/01/2003-31/12/2003 Kurrawang Project (C120/1995), E26/43, M15/669, M16/260. |
| A68414 | 2004 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Binduli North JV Pproject, Annual Report 01/01/2003- 31/12/2003 (C202/1995), P24/3296, P26/1949-52, P24/2136, |
| A65998 | 2003 | Placer Dome Asia Pacific Ltd | Kurrawang | 15% | Annual Technical Report Reporting Period 01/01/2002 - 31/12/2002 Kurrawang C120/1995 Tenements E26/43, M15/669 |
| A66499 | 2003 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual Report 01/01/2002-31/12/2002 Binduli North Project C202/1995: P26/1949-52, 2136, 2212-13, 2241-43, 2248 |
| A67228 | 2003 | Placer Dome Asia Pacific Ltd | Kurrawang | <1% | Kurrawong Project, Surrender Report for the period 21/05/1999-02/07/2003, M26/483. |
| A66114 | 2003 | Tribune Resources Nl | Seven Mile Hill | <1% | Annual Report for period ending 31 December 2002 Seven Mile Hill Project C156/1995: E15/234, 378, 384-385, M15 |
| A66329 | 2003 | Placer Dome Asia Pacific Ltd | Kundana (GEM) | <1% | Kundana (GEM) Project, Annual Report, 01/01/2002-31/12/2002,C22/1999: P16/1531-32, 1754-55, E16/113, M15/993, |
| A66594 | 2003 | Mines & Resources Australia Pty Ltd | Park Dam North | 2% | Park Dam North Project Annual Report for the Period 19 September 2001 to 22 March 2003, Report No PE 03/13, |
| A82883 | 2003 | Placer Dome Asia Pacific Ltd | Binduli | <1% | Placer gravity Survey, December 2003, Survey Report |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | 1% | Kalgoorlie High Resolution Gravity Surveys. |
| A64286 | 2002 | Goldfields Exploration Pty Ltd | Kurrawang | 15% | Annual Report Kurrawang Project reporting period 01/01/2001 to 31/12/2001 tenements E26/43, M15/669, M16/260, |
| A64371 | 2002 | Delta Gold Ltd | Binduli North | <1% | Annual Report 01/01/2001 to 31/12/2001. Binduli North Joint Venture C202/1995. Tenement/s P26/1949-1952, 2136, |
| A64283 | 2002 | Continental Resource Management Pty Ltd | Seven Mile Hill | <1% | Annual Report for the period ending 31 December 2001 exploration licences 15/234, 378 & 384-385, mining leases |
| A64443 | 2002 | Goldfields Exploration Pty Ltd | Kundana | <1% | Kundana Project Annual Report 2001. Reporting Period: 01/01/2001 - 31/12/2001. Tenements E16/113, M16/181-82, |
| A82890 | 2001 | Placer (Granny Smith) Pty Ltd | Kalgoorlie/ Teal | <1% | Sub-audio magnetics surveys, logistics and data processing report |
| A61965 | 2001 | Kundana Gold Pty Ltd | Kurrawang | 15% | Annual Report Kurrawang Project tenements E26/43, M15/669, M16/260, M26/483 and P26/2878 reporting period: 01/ |
| A62264 | 2001 | Goldfields Exploration Pty Ltd | Kundana | <1% | Kundana Project Annual Report 2000 reporting period 01/01/2000 - 31/12/2000 tenements E15/247, E16/113, M16/18 |
| A63636 | 2001 | Delta Gold Ltd | Binduli North | <1% | Binduli North Joint Venture Combined Annual Report 1st January 2000 to 31st December 2000. Tenements E26/53, |
| A62399 | 2001 | Tribune Resources Nl | Seven Mile Hill | <1% | Seven Mile Hill Project Exploration Licences 15/234, 378 And 384-385 Mining Leases 15/850, 851 Annual Report - |
| A63727 | 2001 | Mines & Resources Australia Pty Ltd | Park Dam | 1.3% | Park Dam Project Annual Report for the period 19 September 2000 to 18 September 2001 tenements E15/256, E15/52 |
| A60024 | 2000 | Delta Gold Ltd | Binduli North | <1% | Binduli North Joint Venture Combined Annual Report C202/1995 01/01/1999 to 31/12/1999 Tenements E26/53,M26/346 |
| A60501 | 2000 | Goldfields Exploration Pty Ltd | Kurrawang | 15% | Annual Report Kurrawang Project Tenements E26/43,M15/669, M16/260,M26/483 and P26/2878 Reporting Period 01/01/ |
| A60028 | 2000 | Tribune Resources Nl | Seven Mile Hill | <1% | Seven Mile Hill Project, Exploration Licences E15/234,378, 384,385, Annual Report - M8083/1, 01/01/1999 to 31/ |
| A60227 | 2000 | Gilt-Edged Mining Nl | Kundana | <1% | Kundana Project Western Australia Technical Report E15/247, E16/113,M16/181,M16/182,M16/213-214,M16/218,P16/15 |
| A61355 | 2000 | Mines & Resources Australia Pty Ltd | Park Dam | 1.3% | Park Dam project, Annual report for the Period 19 September 1999 to 18 September 2000. |
| A56998 | 1999 | Gilt-Edged Mining Nl | East Kundana | <1% | East Kundana Project W.A. 02/12/97-03/12/98 Technical Report:E15/247, 113, M16/181-182, P16/1523-1530, P16/15 |
| A57389 | 1999 | Goldfields Exploration Pty Ltd | Kurrawang | 15% | Kurrawang Annual Report 01/01/98 - 31/12/98 E26/43, M15/669, M16/260, M26/680-681, 687-688, P26/2878 |
| A58046 | 1999 | Tribune Resources Nl | Seven Mile Hill | <1% | Seven Mile Hill Project E15/234,378,384-385 For the Period 01/01/1998 to 31/12/1998 |
| A59376 | 1999 | Mines & Resources Australia Pty Ltd | Park Dam | 1.3% | Park Dam Joint Venture Project, Combined Annual Report for the Period 19 September 1998 to 18 September 1999, |
| A53795 | 1998 | Goldfields Exploration Pty Ltd | Kurrawang | 15% | Annual report for Kurrawang Project EL Tenements:E26/43 M15/669 MLA16/260 MLA26/483 P26/2728 Reporting period |
| A53911 | 1998 | Intermin Resource Corp Ltd | Binduli North | <1% | Binduli North - Project Area C202/1995 Annual Report 01/01/1997 - 31/12/1997 E26/53, M23/346, 446, P26/1949-19 |
| A56988 | 1998 | Intermin Resources Nl | Binduli North | <1% | Binduli North Project - East Coolgardie Mineral Field, East Coolgardie District 01/01/98 - 31/12/98 Mining L |
| A53234 | 1998 | Tribune Resources Nl | Seven Mile Hill | <1% | Seven Mile Hill Project, Annual Report M8083/1 01/01/97 - 31/12/97 Exploration Licence: 15/234, 378, 384-385, |
| A53481 | 1998 | Gilt-Edged Mining Nl | East Kundana | <1% | East Kundana Project, Annual Report for theperiod 02/12/1996 to 03/12/1997, E15/247; E16/113; M16/181-182; P1 |
| A50285 | 1997 | Pegasus Gold Australia Pty Ltd | Binduli North | <1% | Annual Technical Report Reporting period: 1 January to 31 December 1996 Binduli North Project Area Combined Re |
| A50333 | 1997 | Goldfields Exploration Pty Ltd | Kurrawang | 14% | Annual report Project Kurrawand Tenements EL26/43 EL15/399 ML15/669 MLA16/260 MLA26/483 Annual Report 1996 REF |
| A49461 | 1996 | Goldfields Exploration Pty Ltd | Kurrawang | 7.1% | Surrender Report on Kurrawang Project E15/399 |
| A47279 | 1996 | Goldfields Exploration Pty Ltd | Kurrawang | 14% | Annual report Kurrawang period covered 01/01/95 to 31/12/95 Tenements EL26/43 ML15/669 EL15/399 MLA16/260 MLA2 |
| A49822 | 1996 | Tribune Resources Nl | Kundana East | <1% | Exploration Licences E15/247 E15/16/113 Prospecting Licences P16/1339 P16/1375 P16/1523 to P16/1530 P16/1560 t |
| A47642 | 1995 | Intermin Resource Corp Ltd | Binduli North | <1% | Binduli North/North Peyes Farm Project Annual report for the period 1 January 1995 to 31 December 1995 for ten |
| A46229 | 1995 | Tribune Resources Nl | Kundana East | <1% | Exploration Licence E15/247 Prospecting Licences P16/1339 P16/1375 P16/1523 to P16/1530 P16/1560 to P16/1568 a |
| A43188 | 1994 | Tribune Resources Nl | East Kundana | <1% | East Kundana Project,Annual Report, Prospecting Licences 16/1339,16/1375,16/1523-30,16/1560-68 and 24/2981-2; |
| A43388 | 1994 | Pancontinental Mining Ltd | Kurrawang | 15% | Kurrawang Project Anuual Report (M7349) Period Ending 19 October 1994 |
| A39357 | 1993 | Tern Minerals Nl | Kundana East | <1% | Annual Report for the period 09/92-09/93 Kundana/Sth Kundana Project P16/1523-1530 P24/2981-2982 |
| A39645 | 1993 | Banyan Pty Ltd | Peyes Farm | <1% | Peyes Farm Project, Annual Report for the period 30/09/1992 to 29/09/1993, E26/53. |
| A40058 | 1993 | Tern Minerals Nl | Kundana | <1% | Report on Activities Kundana Project P16/1339 P16/1375 P16/1523-1530 P16/1560-1568 P24/2981-2982 Year Ended De |
| A38573 | 1993 | Pancontinental Mining Ltd | Kurrawang | 15% | Annual Report for the period 07/04/92-06/04/93 Kurrawang Project E26/43 |
| A38668 | 1993 | Altus Corporation Pty Ltd | Kundana | <1% | Annual report for the period 01/88-12/92 Kundana Project M16/65 M16/70-71 M16/116-117 P16/1339 |
| A30614 | 1990 | Ramsgate Resources Ltd | Kalgoorlie | 11% | Kalgoorlie Project. Annual report. December 1989. M16/85, M24/1270139, 210, 286, 305, 312-314, M26/134, 135, 2 |
| A32566 | 1990 | Ramsgate Resources Ltd | Kalgoorlie | 7.2% | Kalgoorlie Project Surrender Report October 1990 |
| A28591 | 1989 | Ramsgate Resources Ltd | Kalgoorlie | 9.4% | Kalgoorlie Project. Annual report. December 1988. E24/1, 2. P24/1538; 26/1121. M16/85; 24/127-130, 210; 26/13 |
| A82882 | 1753 | Placer Dome Asia Pacific Ltd | Kundana Detailed | 5% | Ground Geophysics Survey |
| A35626 | 1753 | Pancontinental Goldmining Areas Pty Ltd | Kurrawang | 15% | Annual Report E26/43 For the period 7/4/1991 to 6/4/1992 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A82877 | 1753 | Placer Dome Asia Pacific Ltd | Kundana | 5% | Ground Geophysics Survey |
| A89376 | 1753 | Barrick Gold Of Australia Ltd | Kundana | 3.8% | Kundana Project, ANNUAL REPORT, Period 1 January 2010 – 31 December 2010, C102/2004, E15/256, E15/634, E16/113 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 16/260 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 16/260? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.