M 16/545
Register summary
- Holder
- Evolution Mining (Mungari) Pty Ltd
- Local government
- Shire of Coolgardie
- Application received
- 4 Mar 2016
- Commenced
- 25 Oct 2016
- Expiry
- 24 Oct 2037
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150075 | 2025 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender Report - P16/3018 Kunanalling for the period ending 20/07/2025. |
| A142835 | 2024 | Zuleika Gold Limited | Castle East - Zuleika | <1% | Zuleika Project Annual Report Castle East P16/2944 for the period ending 17/03/2024 |
| A145703 | 2024 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Final Surrender Report Castle East P16_3275 for the period 16 September 2022 to 4 November 202 |
| A138086 | 2024 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Annual Report 2023, Castle East, C218/2021 for the period ending 02/11/2023. |
| A145127 | 2024 | Zuleika Gold Limited | Castle East | <1% | Castle East Final Surrender Report 2024, P16/2943, for the period ending 21/11/2024 |
177 more reports
| A145479 | 2024 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Final Surrender Report 2023, Castle East, P16/2944 |
| A145531 | 2024 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Final Surrender Report Castle East P16/2960 for the period ending 31/10/2024 |
| A133582 | 2023 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Annual Report 2022, Castle East, C218/2021 for the period ending 02/11/2022. |
| A135137 | 2023 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Annual Report 2022, Castle East, P16/2944 for the period ending 17/03/2023. |
| A129678 | 2022 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Annual Report 2021, Castle East, C218/2021 for the period ending 02/11/2021 |
| A130465 | 2022 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Annual Report 2021, Castle East, P16/2944 for the period ending 17/03/2022. |
| A125867 | 2021 | Dampier Gold Limited | Zuleika | <1% | Zuleika Project Annual Report 2020, Castle East, P16/2943 for the period ending 21/11/2020 |
| A126294 | 2021 | Zuleika Gold Limited | Zuleika | <1% | Zuleika Project Annual Report 2020, Castle East, P16/2960, for the period ending 17/01/2021 |
| A126847 | 2021 | Zuleika Gold Limited | Castle East | <1% | Zuleika Project Annual Report 2020, Castle East, P16/2944 for the period 18 March 2020 to 17 March 2021 |
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | 5.2% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A123605 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2944 Annual Report for the period ending 16/3/2019 |
| A123721 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2960 Annual Report for the period ending 17/1/2020 |
| A122766 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P16/2943 Annual Report for the period ending 21/11/2019 |
| A123016 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2960 Annual Report for the period ending 17/01/2019 |
| A123513 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender Report P16/2669 and P16/2670, Kunanalling, 6 October 2011 to 5 October 2019 |
| A121632 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P16/2960 Annual Report For the Period 18 January 2017 to 17 January 2018 |
| A121662 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2622 Final Report for the period 15/03/2017-16/02/2018. |
| A119174 | 2019 | Evolution Mining (Mungari) Pty Ltd | Ardenne | <1% | Final Surrender Report Ardenne Project C03/2017, P16/2610, P16/2611, P16/2612 and P16/2613 for the period 10 J |
| A119550 | 2019 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report - Group C1/2017 - Mungari Project For the Period 1 January 2018 to 31 December 2018 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | 5% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
| A119926 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Surrender Report P16/2862 Kunanalling Project for the period 4 February 2015 to 3 February 2019 |
| A121619 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2943 Annual Report for the period 22 November 2017 to 21 November 2018 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | 3.8% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A115817 | 2018 | Evolution Mining (Mungari) Pty Ltd; Evolution Mining (Phoeni | Kintore - Kunanalling | <1% | Final Surrender Report for P16/2586 and P16/2797 [C3/2017] for the period 4 January 2010 to 3 January 2018 |
| A116230 | 2018 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report Mungari Project C1/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117294 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kratos | <1% | Final Surrender Report Kratos Project C3/2017 for the period 17 June 2010 to 16 June 2018, P16/02554, P16/0255 |
| A117941 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender Report P16/2583 Kunanalling Project for the period 8 July 2010 to 7 July 2018 |
| A118276 | 2018 | Torian Resources Limited | Zuleika | <1% | Zuleika P16/2943 Annual Report for the period 22 November 2016 to 21 November 2017 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | 3.6% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A112440 | 2017 | Cerep Pty Ltd; Evolution Mining (Mungari) Pty Ltd; Hayes Min | Mungari | <1% | Annual Report for Mungari Project, C1/2017, for the period 1 October 2015 to 31 December 2016, P16/02244 ....E |
| A113875 | 2017 | Torian Resources Limited | Balgarrie | <1% | Balgarrie Project C52/2011 Annual Report For the Period 15 March 2016 to 14 March 2017, P16/02621, P16/02622, |
| A107992 | 2016 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project Annual Mineral Exploration Report C153/2006 For the period 1st January 2015 to 31st Decemb |
| A108698 | 2016 | Cascade Resources Ltd | Balgarrie | <1% | Balgarrie Project C52/2011, P16/02621, P16/02622, P16/02623 Annual Report for the period 15/03/2015 to 14/03/2 |
| A109675 | 2016 | Torian Resources Limited | Stackhole Dam Project | <1% | Stackhole Dam Project Annual Report, 1 July 2015 to 30 June 2016 |
| A110055 | 2016 | Evolution Mining (Mungari) Pty Ltd | Kintore | 14% | Annual Report for the period 1st July 2015 to 30th June 2016, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A104845 | 2015 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 01/01/2014 to 31/12/2014, C153/2006. |
| A106632 | 2015 | La Mancha Resources Australia Pty Ltd | Kintore | 12% | Annual Report for the period 1st July 2014 to 30th June 2015,C144/2014 Kintore, Kintore East, Carbine, Broads |
| A107223 | 2015 | Torian Resources Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2014 – 30 June 2015 M16/229, M16/491,P16/2479-81 |
| A107613 | 2015 | Phoenix Gold Limited | Broads Dam | <1% | Broad Dam Project C194/2010 Combined Mineral Exploration Report for the period 1st October 2014 to 30th Septem |
| A103169 | 2014 | La Mancha Resources Australia Pty Ltd | Kintore | 12% | Annual Report for the period 1st July 2013 to 30th June 2014, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A103681 | 2014 | Phoenix Gold Limited | Broads Dam | <1% | Broad Dam Project C194/2010 Annual Mineral Exploration Report for Period 1/10/13 to 30/09/14 |
| A101201 | 2014 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report, Reporting Group: C153/2006, For the period 1st Januray 2013 to 31st Decem |
| A103786 | 2014 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2013 – 30 June 2014 M16/229,M16/491,P16/2479-81 |
| A96993 | 2013 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15..... |
| A97179 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2011 – 30 June 2012 M16/164, M16/229, M16/257, M16 |
| A97967 | 2013 | La Mancha Resources Australia Pty Ltd | Kintore | 21% | Kintore Project, Annual Report for the period 06/03/2012 to 05/03/2013, P16/2358-2374, 2586, 2589-2591, 2642-2 |
| A98139 | 2013 | Phoenix Gold Limited | Red Dam | 8.9% | Red Dam Project, Annual Report for the period 19th April 2012 to 18th April 2013, M16/344. |
| A98371 | 2013 | Western Resources Pty Ltd | Balgarrie | <1% | Annual Report for the period 15 March 2012 to 14 March 2013, Balgarrie Project, Combined Reporting Group C52/2 |
| A99397 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2012 – 30 June 2013 M16/164, M16/229, M16/257, M16 |
| A100441 | 2013 | Phoenix Gold Limited | Broads Dam | <1% | Mineral Exploration Report for Period 1/10/12 to 30/09/13 Broads Dam Project |
| A92835 | 2012 | Phoenix Gold Limited | Kunanulling | <1% | Kunanulling Project, Annual Report for the period 1st January 2011 to 31st December 2011, M15/696; M16/15..... |
| A93643 | 2012 | Siburan Resources Limited | Balgarrie | <1% | Annual report Balgarrie Project Exploration Licence P16/2621, P16/2622 & P16/2623 C52/2011 Period 15 March 201 |
| A94030 | 2012 | Carbine Resources Ltd | Red Dam | 8.9% | Red Dam Project M16/344 Annual Technical Report 2011 - 2012 |
| A94167 | 2012 | La Mancha Resources Australia Pty Ltd | Kintore | 21% | Annual Report for the period 6 March 2011 to 5 March 2012, Kintore, Kintore East and Carbine Projects, P16/235 |
| A90210 | 2011 | Siburan Resources Limited | Balgarrie | <1% | Balgarrie Project, Annual Report for the period 15th March 2010 to 14th March 2011, P16/2621, P16/ 2622 & P16/ |
| A90701 | 2011 | La Mancha Resources Australia Pty Ltd | Broads Dam | 32% | Broads Dam Project Annual Report to the Department of Mines and Petroleum for the period 14/04/2010 to 13/04/2 |
| A90752 | 2011 | La Mancha Resources Australia Pty Ltd | Kintore East - Carbine | 19% | Annual Report for the period 6 March 2010 to 5 March 2011, Kintore, Kintore East and Carbine Projects C187/200 |
| A91144 | 2011 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008, Reporting Period: 1 July 2010 to 30 June 2011 |
| A89370 | 2011 | Phoenix Gold Limited | Castle Hill | <1% | Annual Technical Report for Period 1/1/10 to 31/12/10, Castle Hill, Combined Reporting Number C99/1994 Mining |
| A90864 | 2011 | Carbine Resources Ltd | Red Dam | 8.9% | Red Dam Project M16/344, Annual Technical Report 2010 - 2011 |
| A87109 | 2010 | La Mancha Resources Australia Pty Ltd | Kintore | 52% | Kintore Annual Report for the period 06/03/2009 to 05/03/2010, P16/2358 and 2369-2374, C187/2009 |
| A86987 | 2010 | La Mancha Resources Australia Pty Ltd | Red Dam - Broads Dam | 32% | Red Dam and Broads Dam Projects Annual Report for the Period 14th June 2009 to 13th June 2010 |
| A86988 | 2010 | La Mancha Resources Australia Pty Ltd | Kintore East | 75% | Kintore East Project Annual Report for the period 14th June 2009 to 13th June 2010 |
| A87601 | 2010 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1July 2009 to 30 June 2010 |
| A87961 | 2010 | Carbine Resources Ltd | Red Dam | 8.9% | Red Dam Project M16/344, Annual Technical Report. |
| A81462 | 2009 | Cazaly Resources Ltd | KUNANALLING | <1% | Combined Annual Report KUNANALLING PROJECT, For the Period 1 January 2008 to 31 December 2008. Exploration |
| A81511 | 2009 | Cazaly Resources Ltd | CASTLE HILL | <1% | Combined Annual Report CASTLE HILL PROJECT For the Period 1 January 2008 to 31 December 2008 |
| A82595 | 2009 | La Mancha Resources Australia Pty Ltd | KINTORE, RED DAM AND BROADS DAM | 27% | KINTORE, RED DAM AND BROADS DAM PROJECTS ANNUAL REPORT FOR THE PERIOD 14th JUNE 2008 TO 13th JUNE 2009, C Numb |
| A82596 | 2009 | La Mancha Resources Australia Pty Ltd | KINTORE EAST | 75% | KINTORE EAST PROJECT ANNUAL REPORT FOR THE PERIOD 14th JUNE 2008 TO 13th JUNE 2009, C Number 38/2009 |
| A82774 | 2009 | Carbine Resources Ltd | Red Dam | 8.9% | Red Dam Project M16/344 Annual Technical Report |
| A84715 | 2009 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Mineral Exploration Report, Period 1 July 2008 to 30 June 2009, Tenements: M16/23, M16/48, M16/58, M16 |
| A77532 | 2008 | Cazaly Resources Ltd | Kunanalling | <1% | Combined Annual Report KUNANALLING PROJECT C153/2006 For the Period 1 January 2007 to 31 December 2007 |
| A77599 | 2008 | Cazaly Resources Ltd | CASTLE HILL | <1% | Combined Annual Report CASTLE HILL PROJECT C99/1994 For the Period 1 January 2007 to 31 December 2007 |
| A78111 | 2008 | Carbine Resources Ltd | Red Dam | 8.9% | Red Dam Project M16/344 Annual Technical Report RD_2007A |
| A77188 | 2008 | Monarch Gold Mining Company Ltd | Davyhurst | <1% | DAVYHURST PROJECT Reporting Group C189/2007 Report Type: Annual Technical Report Report Period: 2 November 200 |
| A74388 | 2007 | Monarch Gold Mining Company Ltd | Carbine | <1% | Carbine Project M16/86, 143, 150, 164, 212, 244, P16/1439, 1512, 1570-73, 1816, 1915-16, 2178-82, 2006 Annual |
| A74443 | 2007 | Cazaly Resources Ltd | Kunanalling | <1% | Combined Annual Report, Kunanalling Project, For the Period 1 January 2006 to 31 December 2006. (C87/2004) |
| A75021 | 2007 | Cazaly Resources Ltd | Castle Hill | <1% | Combined Annual Report, Castle Hill Project, For the Period 1 January 2006 to 31 December 2006. (C99/1994 - M1 |
| A75605 | 2007 | Cazaly Resources Ltd | Castle Hill | <1% | Annual Environmental Report, Castle Hill Project For the period 1 January 2006 to 31 December 2006 Tenements: |
| A71993 | 2006 | Siberia Mining Corporation Ltd | Carbine | <1% | Carbine Project, Annual Technical Report 01/01/2005 to 31/12/2005, Combined Reporting No. C109/2005, Kalgoorli |
| A74655 | 2006 | Siberia Mining Corporation Ltd | Carbine | 7% | Carbine Project , Annual Report for the period 01/01/2006 to 31/12/2006, P16/1577-1578 (C78/2006) |
| A73237 | 2006 | Cazaly Resources Ltd | Kunanalling | <1% | Combined Annual Report for the Period 7 July 2005 to 6 July 2006, Kunanalling Project P16/2197-2198,2224-2231, |
| A73350 | 2006 | Cazaly Resources Ltd | Castle Hill | <1% | Combined Annual Report, Castle Hill Project P16/2253-2259, P16/2265-2266, For the Period 7 July 2005 to 6 July |
| A70065 | 2005 | Siberia Mining Corporation Ltd | Red Dam | <1% | Annual technical report for the period 11/01/04 - 10/01/05 Red Dam Project, M16/143, Kalgoorlie |
| A70171 | 2005 | Siberia Mining Corporation Ltd | Carbine | 5.3% | Annual technical report for the period 27/01/04 - 26/01/05 Carbine Project, P16/1916, Kalgoorlie |
| A70385 | 2005 | Siberia Mining Corporation Ltd | Carbine | <1% | Carbine Project, P16/1573, Annual technical report for the period 09/03/04 - 08/03/05 Kalgoorlie |
| A70386 | 2005 | Siberia Mining Corporation Ltd | Carbine | 4.2% | Carbine Project, P16/1572, Annual technical report 09/03/04 - 08/03/05 Kalgoorlie |
| A70402 | 2005 | Cazaly Resources Ltd | Kunanalling | <1% | Combined annual report for the period 01/01/04 - 31/12/04 Kunanalling Project, C87/2004, E16/302, M15/692..... |
| A70709 | 2005 | Siberia Mining Corporation Ltd | Red Dam | 7% | Carbine Project - Red Dam P16/1577-1578, Annual technical report 6/04/04 - 5/04/05 (C226/1996, Kalgoorlie). |
| A68396 | 2004 | Cazaly Resources Ltd | Kunanalling | <1% | Annual report for the period 01/01/2003-31/12/2003 Kunanalling Project (C36/1999), M16/0015, M16/0017, M16/003 |
| A68508 | 2004 | Placer Dome Asia Pacific Ltd | Carbine/Zuleika | <1% | Carbine/Zuleika Project Annual Report 09/03/2003 to 08/03/20 04 C303/1997 M16/27...M16/411, P16/1439...P24/335 |
| A68748 | 2004 | Allied Gold Ltd | Red Dam | 7% | Red Dam Project, P16/1577, P16/1578, Annual Report 06/04/2003-05/04. Allied Rept No 2004/1 |
| A69018 | 2004 | Placer Dome Asia Pacific Ltd | Carbine Zuleika | <1% | Carbine Zuleika Project, Surrender report 06/06/2000-05/06/2004, P16/2008-09 |
| A66658 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | <1% | Carbine/ Zuleika Project, Annual Report 09/03/2002 - 08/03/2003 C303/1997: M16/27, 44-5, 48, 58, 86, 106, 143, |
| A66164 | 2003 | Placer Dome Asia Pacific Ltd | Kunanalling | <1% | Annual Report 01/01/2002 - 31/12/2002 Kunanalling Project C36/1999: M16/15, 17, 33, 36, 47, 52, 99, 139-40, 17 |
| A66665 | 2003 | Allied Mining And Processing Ltd | Red Dam | 7% | Red Dam Project, P16/1577 & P16/1578,Annual Report 6 April 2002 - 5 April 2003. C226/1996: Allied Mining Techn |
| A64425 | 2002 | Goldfields Exploration Pty Ltd | Kunanalling | <1% | Annual Report. Kunanalling Project. Tenements M16/139-40, M16/15, M16/17, M16/178, M16/217, M16/236, M16/306, |
| A65102 | 2002 | Auriongold Exploration Pty Ltd | Carbine Zuleika | <1% | Annual Report Reporting Period 09/03/2000 - 08/03/2002 Combined Reporting NO C303/1997. Tenement/s M16/23, 27, |
| A59890 | 2000 | Amx Resources Nl | Kunanalling | <1% | Annual Report on Kunanalling Gold Project Progress Report on Exploration carried out on Tenements GML16/1253,M |
| A60310 | 2000 | Mines & Resources Australia Pty Ltd | Kintore East | 73% | Kintore East Joint Venture Project Annual Report for the Period 10/03/1999 to 09/03/2000 PE00/12 Tenements P16 |
| A61372 | 2000 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | Mining Leases M16/23,27,44,45,58,86,106,143,150,156,164,188, 212, Prospecting Licences P16/1353-1356,1373,1439 |
| A60037 | 2000 | Mines & Resources Australia Pty Ltd | Croesus Joint Venture | <1% | Combined Annual Technical Report for the Period 08/12/1998 to 07/12/1999 PE00/10 Tenements P16/1385,1484-1487, |
| A60282 | 2000 | Mines & Resources Australia Pty Ltd | Kintore | <1% | Kintore Project, Annual Report for the Period 07/03/1999 to 06/03/2000, PE00/14, P16/1297,1298.Combined Report |
| A60612 | 2000 | Homestake Gold Of Australia Ltd | Red Dam | 7% | Project 6564, Red Dam Project, P16/1577,1578, Annual Report, 6 April 1999 to 5 April 2000, Technical Report No |
| A62574 | 2000 | Homestake Gold Of Australia Ltd | Red Dam | 7% | Project 6564 Red Dam Project P16/1577 & P16/1578 Annual Report 6 April 2000 - 5 April 2001. Technical Report N |
| A58177 | 1999 | Mines & Resources Australia Pty Ltd | Kintore East | 73% | Kintore East joint venture project. Annual technical report on P16/1416-1420. 10/03/98-09/03/99. |
| A59105 | 1999 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine - Zuleika, Joint Annual Report For the Period 9/03/1998 to 8/03/1999 (M16/23, M16/27, M16/ |
| A57321 | 1999 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture - PE99/1 08/12/97 - 07/12/98 P16/1385, 1484-1487, 1569, 1607-1614, M16/199, 200 |
| A58280 | 1999 | Homestake Gold Of Australia Ltd | Red Dam | 7% | Red Dam Project - P16/1577, 1578 Annual Report 06/04/98 - 05/04/99 |
| A58486 | 1999 | Delta Gold Ltd | Kintore | <1% | Delta Gold NL - Kintore JV Annual Report 01/1998 - 01/1999 PL16/1297-1298 |
| A53901 | 1998 | Croesus Mining Nl | Croesus JV | <1% | Combined Annual Technical Report for the period 08/12/96- 07/12/97 Tenements P16/1385,1484-1487, 1569, 1607-16 |
| A54598 | 1998 | Mines & Resources Australia Pty Ltd | Kintore East Joint Venture | 73% | Kintore East Joint Venture Project Prospecting Licence: 16/1416-1420 10/03/97 - 09/03/98 |
| A54686 | 1998 | Mines & Resources Australia Pty Ltd | Red Dam | 46% | Red Dam Project, P16/1454 to P16/1459 and P16/1914 10/03/97 to 09/03/98 Mines and Resources Australia Pty Ltd |
| A54789 | 1998 | Plutonic Operations Ltd | Plutonic | 7% | Plutonic Project 564 - Red Dam Project, P16/1577-1578 Annual Report, 06/04/1997 to 05/04/1998 |
| A54951 | 1998 | Delta Gold Ltd | Kintore | <1% | Annual Technical Report Kintore Project Between 07/03/97 to 06/03/98 Tenements P16/1297 & P16/1298 MLA16/232 |
| A55230 | 1998 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine/Zuleika Joint Annual Report 09/03/97 - 08/03/98 Mining Licence: M16/23, 27, 44-45, 48, 58, |
| A50811 | 1997 | Mines & Resources Australia Pty Ltd | Red Dam | 46% | Red Dam Project Combined Annual report for Prospecting Licences P15/1454 to P16/1459 for the period 10 March 1 |
| A51281 | 1997 | Plutonic Operations Ltd | Red Dam | 5.3% | Project 564 Red Dam Project P16/1578 and P16/1579 Final Surrender Report 06/04/93 to 05/04/97 WA Technical Rep |
| A51296 | 1997 | Delta Gold Ltd | Grants Patch West - Balgarri - Kintore E | <1% | ANNUAL TECHNICAL REPORT KINTORE PROJECT BETWEEN 7 March, 1996 to 6 March, 1997 |
| A50240 | 1997 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture Project Combined Annual Technical report for Prospecting Licences P16/1385 P16/1484 to P |
| A50807 | 1997 | Mines & Resources Australia Pty Ltd | Kintore East | 73% | Kintore East Project Annual Technical Report on Prospecting Licences P16/1416 to P16/1420 for the period 10th |
| A51241 | 1997 | Plutonic Operations Ltd | Red Dam | 6.5% | Project 564 Red Dam Project P16/1577 P16/1578 and P16/1579 Annual report 06/04/96 to 05/04/97 WA Technical Rep |
| A47860 | 1996 | Mines & Resources Australia Pty Ltd | Kintore East | 73% | Kintore East Project Annual Technical Report on Prospecting Licences P16/1416 to P16/1420 for the period 10th |
| A47898 | 1996 | Plutonic Operations Ltd | Red Dam | 6.5% | Project 564 Red Dam Project P16/1577 to P16/1579 Annual report 06/04/95 to 05/04/96 Plutonic Operations Limite |
| A48220 | 1996 | Delta Gold Ltd | Kintore | <1% | Annual Technical Report for the Kintore Project between 7th March, 1995 to 6th March, 1996 (P16/1297, P16/1298 |
| A49964 | 1996 | Amx Resources Nl | Kunanalling | 21% | Annual report for Kunanalling Project Period 1 November 1995 to 31 October 1996 Mining Leases M16/139 M16/140 |
| A46904 | 1996 | Mines & Resources Australia Pty Ltd | Croesus Joint Venture | <1% | Croesus Joint Venture Project Combined Annual report for Prospecting Licences P16/1385 P16/1484 to P16/1487 P1 |
| A47900 | 1996 | Mines & Resources Australia Pty Ltd | Red Dam | 46% | Red Dam Project Combined Annual Technical Report for Prospecting Licences P16/1454 to P16/1459 for the period |
| A48542 | 1996 | Newcrest Mining Ltd | Breakaway Dam | <1% | Newcrest Report No. WORA 104 OB No. 352 Ora Banda Gold Mine Breakaway Dam Project M16/58 M16/106 M16/143 M16/1 |
| A44289 | 1995 | Mines & Resources Australia Pty Ltd | Red Dam | 46% | Red Dam Project Combined Annual Techincal Report for Prospecting Licences 16/1454 -16/1459 For the period 10 M |
| A43430 | 1995 | Mines & Resources Australia Pty Ltd | Croesus | <1% | Croesus Joint Venture Project Combined Annual Technical Report for Prospecting Licences P16/1608 to P16/1614 P |
| A44290 | 1995 | Mines & Resources Australia Pty Ltd | Kintore East | 73% | Annual Technical Report on Prospecting Licences P16/1416 to P16/1420 for the period 10 March 1994 to 9 March 1 |
| A44307 | 1995 | Mines & Resources Australia Pty Ltd | Kintore | <1% | Annual Report on Prospecting Licences P16/1297 & P16/1298 for the period 7 March 1994 to 6 March 1995, Kintore |
| A44946 | 1995 | Newcrest Mining Ltd | Breakaway Dam | <1% | Newcrest Mining Report No. WORA 85 OB No. 334 Ora Banda Gold Mine Breakaway Dam Project Exploration Report on |
| A45223 | 1995 | Coolgardie Gold Nl | Kintore | <1% | Surrender Report for the period 17/07/94-16/07/95 Kintore Project P16/1371 P16/1372 |
| A40685 | 1994 | Afmeco Pty Ltd | Red Dam | 46% | Annual report for the period 10/03/93-09/03/94 Red Dam Project P16/1454-1459 |
| A41043 | 1994 | Resource Service Group Pty Ltd | Kintore | <1% | Annual report on Prospecting Licences P16/1297 P16/1298 Kintore Project for the period 07/03/93 to 06/03/94 |
| A41999 | 1994 | Newcrest Mining Ltd | Breakaway Dam | <1% | Breakaway Dam Project Exploration Report on Leases M6/58, M16/106,M16/143,M16/150,M16/164, P16/1439, P6/1570-1 |
| A40277 | 1994 | Afmeco Pty Ltd | Croesus - Macaroni - Crest Shear | <1% | Annual Report for the period 08/12/92-07/12/93 Croesus JV(Macaroni & Crest Shear Area) Project P16/1152-1154,1 |
| A41044 | 1994 | Resource Service Group Pty Ltd | Kintore East | 73% | Combined Annual Technical Report for the 12 months to 9/03/1994 Kintore East Project P16/1416 to 1420 |
| A41976 | 1994 | Coolgardie Gold Nl | Kintore | <1% | Annual report for the period 17/07/93-16/07/94, Kintore Project, P16/1371 P16/1372 |
| A42236 | 1994 | Plutonic Operations Ltd | Red Dam | 5% | Annual report for the period 06/04/93 to 05/04/94 Project 564 Red Dam Project P16/1577 to P16/1580 Plutonic Op |
| A38140 | 1993 | Afmeco Pty Ltd | Kintore East | 73% | Annual report for the period 10/03/92-09/03/93 Kintore East JV Project P16/1416-1420 |
| A39125 | 1993 | Coolgardie Gold Nl | Kintore | <1% | Annual report for the period 17/07/92-16/07/93 Kintore Project P16/1371 P16/1372 |
| A39747 | 1993 | Afmeco Pty Ltd | Croesus | <1% | Surrender report for the period 20/01/93-16/08/93 Croesus JV Project M16/190 M16/192 |
| A38160 | 1993 | Afmeco Pty Ltd | Red Dam | 46% | Annual report for the period 10/03/92-09/03/93 Red Dam Project P16/1454-1459 |
| A39998 | 1993 | Newcrest Mining Ltd | Breakaway Dam | <1% | Breakaway Dam Project Exploration Report on Leases M16/58, M16/106, M16/143, M16/150, M16/164, P16/1439, P16/1 |
| A35818 | 1992 | Afmeco Pty Ltd | Kintore | <1% | Annual Report on Prospecting Licences P16/1297 and 1298 Kintore Project for the Period 07/03/91 - 06/03/92 |
| A36414 | 1992 | Afmeco Pty Ltd | Red Dam | 46% | Surrender Report for the period to 03/92 Red Dam Project M16/121,162 |
| A35699 | 1992 | Afmeco Pty Ltd | Kintore East | 74% | Final Report on tenements for the period 01/08/91 - 10/03/92 Kintore East Joint Venture Project M16/172 and M1 |
| A36848 | 1992 | Coolgardie Gold Nl | Kintore | <1% | Annual Report for the period 17/07/91-16/07/92 Kintore Project P16/1371 P16/1372 |
| A37470 | 1992 | Newcrest Mining Ltd | Breakaway Dam | <1% | Annual report for the period 05/91 to 05/92 Breakaway Dam Project M16/58, M16/106, M16/143, M16/150, M16/164, |
| A32470 | 1991 | Mt Martin Gold Mines Nl | Red Dam/Seven Dwarfs | 5% | Annual report for the period 17/03/90 to 17/03/91 For Mining Lease M16/132 Seven Dwarfs East Coolgardie Minera |
| A32917 | 1991 | Poseidon Ltd | Little Crest Dam | <1% | Little Crest Dam Project Annual Report 1990 P16/657, P16/658, P16/1042, P16/1043 and M16/143 Poseidon Explorat |
| A31267 | 1990 | Poseidon Ltd | Little Crest Dam | <1% | Annual report 1989 Little Crest Dam project P16/538 to P16/539, P16/488 to P16/490, P16/492, P16/493, P16/1402 |
| A29841 | 1989 | Pioneer Minerals Aust Ltd | Red Dam | 2.9% | Project 564: Red Dam. Report on Rotary Airblast Drilling July 1989 Prospecting licence P16/463 Pioneer Mineral |
| A27605 | 1989 | Pioneer Minerals Aust Ltd | Red Dam | 1.4% | Project 564: Red Dam Report on RAB drilling Sept 1988 P16/454 to P16/463 and P16/535 to P16/537 Pioneer Minera |
| A28611 | 1989 | Pioneer Minerals Aust Ltd | Red Dam | 2.9% | Project 564: Red Dam; Report on Rotary Airblast Drilling March 1989 P16/463 WA Technical Report No 231 (R Rep |
| A30974 | 1989 | Pioneer Minerals Aust Ltd | Red Dam | 2.9% | Project 564: Red Dam, Report on Rotary Airblast Drilling, March 1989. Prospecting licence 16/463 (Kalgoorlie, |
| A31366 | 1989 | Barrack Exploration Pty Ltd | Kintore | 46% | R Report for the period 11/89 Kintore Project P16/399-402,618-619 M16/121 |
| A23949 | 1988 | Coolgardie Mining Associates Nl | Dunnsville - Jaurdi Hill | 1.4% | Jaurdi - Dunnsville Group, Final report for year ended 31 April 1988, P/16/308, P16/438-439, P16/477-480, P16/ |
| A18302 | 1986 | Noranda Australia Ltd | West Black Flag | 1.4% | Project 564 : Red Dam Preliminary Reconnaissance Mapping field work December 13 to 15, 19858 W.A. Technical Re |
| A18303 | 1986 | Noranda Australia Ltd | West Black Flag | 1.4% | Project 564: Red Dam Report on Soil Geochemistry April to June 1986 P16/454 to P16/463 P16/535 to P16/537 Nora |
| A6607 | 1976 | Western Mining Corporation Ltd | Ora Banda- Kunanalling- Broad Arrow | 3.6% | Ora Banda- Kunanalling- Broad Arrow Project, Annual Report for the period 01/05/1973 to 29/06/1976, TR70/5012 |
| A1814 | 1971 | Western Mining Corporation Ltd | Kunanalling | 4.8% | Kunanalling Project, Annual Report for theyear ending 30th June 1971, MC16/118-119, 124-185, & 190-205. |
| A107 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | 1.4% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report ,Data File |
| A106 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | 1.4% | Ora Banda - Kunanalling Project, Non-statutory Report: Kalgoorlie Regional & Geological Plans (8), circa July |
| A105 | 1970 | Western Mining Corporation Ltd | Ora Banda- Kunanalling | 1.4% | Ora Banda- Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Reports Data File, |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | 1.4% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A108 | 1970 | Western Mining Corporation Ltd | Ora Banda/Kunanalling | 1.4% | Annual Tenements and Temporary Reserve Report Data File, Ora Banda - Kunanalling Area. |
| A109 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | 1.4% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report,Folder 8,In |
| A110 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | 1.4% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenement & Temporary Reserve Report, Folder 9, Vac |
| A111 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | 1.4% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenements & Temporary Reserve Report Folder 10,Sam |
| A57775 | 1753 | Amx Resources Nl | Kunanalling | <1% | Report On Kunanalling Gold Project, Progress Report on GML 16/1253,M16/140,160,178,236,306, Period 1/11/97 to |
| A22686 | 1753 | Noranda Australia Ltd | West Black Flag | 1.4% | Project 564 Red Dam Report on RAB Drilling June - July 1987 and Nov 1987. P16/454 to P16/463 and P16/535 to P1 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A50373 | 1753 | Centaur Mining & Exploration Ltd | Ora Banda South | <1% | Prospecting Licences P16/1353 to P16/1356 P16/1374 P16/1439 P16/1512 P16/1570 to P16/1573 and Mining Leases M1 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 11 years · 24 Oct 2037
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 16/545 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 16/545? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.