M 24/133
M 24/133 is a live mining lease in the City of Kalgoorlie-Boulder, Western Australia, held by Gpm Resources Pty Ltd (part of Genesis Minerals Limited). Granted on 30 Dec 1987 for 21 years (renewed), it expires on 29 Dec 2029. The ground is covered by 200 historical WAMEX reports.
Register summary
- Holder
- Gpm Resources Pty Ltd
- Part of
- Genesis Minerals Limited (ASX:GMD) as at 2026-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 22 Dec 1986
- Commenced
- 30 Dec 1987
- Expiry
- 29 Dec 2029
- Term
- 21 Years (Renewed)
The full record on M 24/133
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 10 changes of holder
- The full record: 42 years of expenditure, 83 conditions and 2 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (47 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A144366 | 2024 | Evolution Mining (Mungari) Pty Ltd | Ora Banda | <1% | Final Surrender Report - P24/4914 Ora Banda for the period ending 10/07/2024 |
| A138481 | 2024 | Evolution Mining (Mungari) Pty Ltd | Broad Arrow | <1% | Final Surrender Report - P24/4910, P24/4912 and P24/4913 Broad Arrow for the period ending 30/11/2023. C265/20 |
| A136352 | 2023 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Annual Report for the period ending 30/6/2023 |
| A137343 | 2023 | Evolution Mining (Mungari) Pty Ltd | Broad Arrow | <1% | Final Surrender Report - P24/4911 Broad Arrow for the period ending 24/08/2023. |
| A131932 | 2022 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period ending 30/06/2022 |
195 more reports
| A127829 | 2021 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period 1 July 2020 to 30 June 2021. |
| A123779 | 2020 | Paddington Gold Pty Limited | Hill End | <1% | Hill End Project C115/2009 Mineral Exploration Report for the period ending 1 July 2019 to 30 June 2020 |
| A122853 | 2020 | Torian Resources Ltd | Mount Pleasant | <1% | Mount Pleasant Project C 46/2010 Annual Report 2019 For the Period 19 October 2018 to 18 October 2019 |
| A123112 | 2020 | Evolution Mining (Mungari) Pty Ltd | Grants Patch | <1% | Annual Report - Grants Patch - C2/2017 - 01 January 2019 to 31 December 2019 |
| A124768 | 2020 | Bardoc Gold Ltd | BTZ Bardoc | 19% | C16/2020 BTZ Bardoc Combined Annual Report for the period ending 1 January 2020 to 30 April 2020 |
| A124772 | 2020 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Mineral Exploration Report C36/2009 for the period ending 30/06/2020 |
| A125499 | 2020 | Dampier Gold Limited; Torian Resources Limited | Credo Well | <1% | Credo Well Joint Venture Project Annual Report C46/2010 for the period ending 18/10/2020 |
| A119494 | 2019 | Evolution Mining (Mungari) Pty Ltd | Grants Patch | <1% | Group Annual Report Grants Patch C2/2017 for the period 01/01/2018 - 31/12/2018 |
| A120672 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 2 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A119689 | 2019 | Bardoc Gold Ltd | Bardoc Extended | <1% | Bardoc Extended C51/2003 Combined Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119693 | 2019 | Bardoc Gold Ltd | BTZ Bardoc | 21% | BTZ Bardoc C87/1994 Combined Annual Report for the period 1 January 2018 to 31 December 2018, M24/00133, M24/0 |
| A120671 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 1 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A120861 | 2019 | Paddington Gold Pty Limited | Hill End | <1% | Hill End Project C115/2009 Mineral Exploration Report For the Period 1 July 2018 to 30 June 2019, M24/00078, M |
| A117392 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 for the period 1 July 2017 to 30 June 201 |
| A117404 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 2 of 2 for the period 1 July 2017 to 30 June 201 |
| A116305 | 2018 | Evolution Mining (Mungari) Pty Ltd | Grants Patch | <1% | Annual Report- Grants Patch C2/2017 for the period 1 January 2017 to 31 December 2017 |
| A116445 | 2018 | Gpm Resources Pty Ltd | Bardoc Extended | <1% | C51/2003 Bardoc Extended Combined Annual Report For the Period 1 January 2017 to 31 December 2017 |
| A116450 | 2018 | Gpm Resources Pty Ltd | BTZ Bardoc | 19% | C87/1994 Bardoc Combined Annual Report 1 January 2017 to 31 December 2017, M24/00133, M24/00134, M24/00348, M2 |
| A117478 | 2018 | Paddington Gold Pty Limited | HILL END | <1% | Hill End Annual Report on C115/2009, 01 July 2017 - 30 June 2018 |
| A117917 | 2018 | Torian Resources Limited | Mount Pleasant | <1% | Mount Pleasant Project C46/2010 Annual Report for the period 19/10/2016 - 18/10/2017 |
| A118329 | 2018 | Torian Resources Limited | Mount Pleasant | <1% | Mount Pleasant Project C46/2010 Annual Report for the period 19/10/2017 - 18/10/2018 |
| A110750 | 2017 | Torian Resources Limited | Mount Pleasant | <1% | TORIAN RESOURCES LIMITED ANNUAL REPORT For the Period 19 October 2015 to 18 October 2016 Mount Pleasant Proj |
| A112114 | 2017 | Gpm Resources Pty Ltd | Bardoc Extended | <1% | C51/2003 Bardoc Extended Combined Annual Report For the Period 1 January 2016 to 31 December 2016, M24/96....P |
| A112115 | 2017 | Gpm Resources Pty Ltd | BTZ Bardoc | 19% | C87/1994 BTZ Bardoc Combined Annual Report For the Period 1 January 2016 to 31 December 2016, M24/00133, M24/0 |
| A112417 | 2017 | Hayes Mining Pty Ltd; Evolution Mining (Mungari) Pty Ltd | Grants Patch | <1% | Annual Report on the Grants Patch Project C2-2017 For the Period 1 January 2017 to 31 December 2016, M24/00274 |
| A114535 | 2017 | Paddington Gold Pty Limited | Paddington | <1% | Annual Mineral Exploration Report Paddington Project C36/2009 for the period 1 July 2016 to 30 June 2017 |
| A114589 | 2017 | Paddington Gold Pty Limited | Hill End | <1% | HILL END PROJECT C115/2009 Mineral Exploration Report for the period 1 July 2016 to 30 June 2017, M24/00078, M |
| A108492 | 2016 | Gpm Resources Pty Ltd | BTZ Bardoc | 19% | C87/1994 Bardoc Project Combined Annual Report for the period 1 January 2015 to 31 December 2015, M 24/133, M |
| A108493 | 2016 | Gpm Resources Pty Ltd | Bardoc Extended | <1% | C51/2003 Bardoc Extended Combined Annual Report M24/96, M24/405, M24/487, M24/512, P24/4060, P24/4152, P24/415 |
| A109414 | 2016 | Torian Resources Limited | Mount Pleaseant | <1% | C46/2010 Mt Pleasant Annual Report for the period 19/10/2014 to 18/10/2015, P24/4418, 4419, 4420, 4421, 4422, |
| A109539 | 2016 | Paddington Gold Pty Limited | Paddington | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 PADDINGTON PROJECT C36/2009 |
| A109723 | 2016 | Paddington Gold Pty Limited | Hill End | <1% | Mineral Exploration Report For the Period 1 July 2015 to 30 June 2016 HILL END PROJECT M24/00078, M24/00876, C |
| A104456 | 2015 | Siburan Resources Limited | Mount Pleasant | <1% | Annual Combined Report for the period 19 October 2013 to 18 October 2014, Mt Pleasant Project C46/2010, P24/44 |
| A104878 | 2015 | Minara Resources Pty Ltd | BTZ Bardoc | 19% | Combined Annual Report For The Period 1 January 2014 to 31 December 2014 BTZ Bardoc Project (C87/1994) M24/133 |
| A104879 | 2015 | Excelsior Gold Limited; Minara Resources Pty Ltd | Bardoc Extended | <1% | Combined Annual Report for the Bardoc Extended Project - C51/2003 for the period 1 January 2014 to 31 December |
| A106287 | 2015 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report for the period 01 July 2014 to 30 June 2015, M24/16.... |
| A106538 | 2015 | Paddington Gold Pty Ltd | Hill End | <1% | Hill End Project C115/2009 Mineral Exploration Report Reporting Period: 1 July 2014 – 30 June 2015, Tenements: |
| A100640 | 2014 | Gpm Resources Pty Ltd | Kalgoorlie North | <1% | Kalgoorlie North Project, Annual Report for the period 14/03/2012 to 13/03/2013, P24/4587. |
| A103131 | 2014 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 Reporting Period: 01 July 2013 to 30 June |
| A101525 | 2014 | Excelsior Gold Limited; Minara Resources Pty Ltd | Bardoc Extended | <1% | Combined Annual Report For The Period: 1 January 2013 to 31 December 2013 Bardoc Extended Project C51/2003, M2 |
| A101526 | 2014 | Minara Resources Pty Ltd | BTZ Bardoc | 21% | Combined Annual Report For The Period: 1 January 2013 to 31 December 2013, BTZ Bardoc Project C87/1994, Compri |
| A103180 | 2014 | Paddington Gold Pty Ltd | Hill End | <1% | Hill End Project Mineral Exploration Report Reporting Period: 1 July 2013 – 30 June 2014 Tenements: M24/78, M2 |
| A96298 | 2013 | Siburan Resources Limited | Mount Pleasant | <1% | Mt Pleasant Project, Annual Report for the period 19th October 2011 to 18th October 2012, P24/4418-4430, 4406 |
| A97824 | 2013 | Minara Resources Pty Ltd | BTZ Bardoc | 21% | Combined Annual Report for the BTZ Bardoc Project - C87/1994 for the period 1 January 2012 to 31 December 2012 |
| A98620 | 2013 | Paddington Gold Pty Ltd | Hill End | <1% | Hill End Project Mineral Exploration Report C115/2009 Reporting Period: 1 July 2012 to 30 June 2013 Tenements: |
| A97532 | 2013 | Excelsior Gold Limited; Minara Resources Pty Ltd | Bardoc Extended | <1% | Bardoc Extended Project, Annual Report for the period 1st January 2012 to 31st December 2012, M24/96, 146, 395 |
| A99302 | 2013 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2012 to 30 June 2013, M16/211.....P26/3613 |
| A100099 | 2013 | Siburan Resources Limited | Mount Pleasant | <1% | Annual Combined Report for the period 19 October 2012 to 18 October 2013, Mt Pleasant Project (C46/2010), PL 2 |
| A94950 | 2012 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Volumes 1 to 7, Reporting Period: 01 July 2011 to 30 J |
| A92277 | 2012 | Siburan Resources Limited | Mount Pleasant | <1% | Annual Combined Report for the period 19 October 2009 to 18 October 2010, Mt Pleasant Project, PL 24/4406, 441 |
| A93285 | 2012 | Minara Resources Ltd | Bardoc Extended | <1% | Bardoc Extended Project, Annual Report for the period 1st January 2011 to 31st December 2011, M24/96, 146, 395 |
| A93286 | 2012 | Excelsior Gold Limited; Minara Resources Ltd | BTZ Bardoc | 21% | COMBINED ANNUAL REPORT For The Period: 1 January 2011 to 31 December 2011 BTZ Bardoc Project C87/1994 Comprisi |
| A93631 | 2012 | Excelsior Gold Limited; Minara Resources Pty Ltd | BTZ Bardoc | 21% | COMBINED ANNUAL REPORT, For The Period: 1 January 2011 to 31 December 2011, BTZ Bardoc Project, C87/1994 Comp |
| A90899 | 2011 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Reporting Period: 01 July 2010 to 30 June 2011 |
| A89852 | 2011 | Minara Resources Ltd | BTZ Bardoc | 21% | Combined Annual Technical Reportfor C87/1994, 1 January 2010 to 31 December 2010 (BTZ Bardoc) |
| A89871 | 2011 | Minara Resources Ltd | Bardoc | <1% | Combined Annual Technical Report for C147/1996, 1 January 2010 to 31 December 2010 |
| A91613 | 2011 | Paddington Gold Pty Ltd | Hill End | <1% | Hill End Project Mineral Exploration Report Reporting Period: 1 July 2010 – 30 June 2011, M24/78, M24/876 |
| A86677 | 2010 | Minara Resources Ltd | Bardoc Extended | <1% | Combined Annual Technical Report, Bardoc Extended C51/2003, 01 January 2009 to 31 December 2009, M24/96 M24/14 |
| A86676 | 2010 | Minara Resources Ltd | BTZ Bardoc | 21% | BTZ Bardoc Project C87/1994, Combined Annual Technical Report, Period: 01 January 2009 - 31 December 2009 |
| A87700 | 2010 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2009 to 30 June 2010 |
| A87602 | 2010 | Paddington Gold Pty Ltd | Hill End | <1% | Hill End Project mineral Exploration Report C115/2009, Reporting Period: 1 July 2009 to 30 June 2010, Tenemen |
| A81419 | 2009 | Paddington Gold Pty Ltd | Mount Ellis | <1% | Mt Ellis Project C169/1997 Mineral Exploration Report, 01 January 2008 – 31 December 2008 |
| A80958 | 2009 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Operations Project C101/2004, Mineral Exploration Report, Period: 01/12/2007 to 30/11/2008, Tenemen |
| A81258 | 2009 | Minara Resources Ltd | BTZ Bardoc | 21% | BTZ Bardoc Combined Annual Technical Report C87/1994, 2008, TR1424, 01 January 2008 - 31 December 2008 |
| A81791 | 2009 | Yilgarn Mining (Wa) Pty Ltd | CREDO | <1% | CREDO PROJECT M24/449 –and 450 Surrender Report for the period ended 9th December 2008 |
| A81793 | 2009 | Yilgarn Mining (Wa) Pty Ltd | CREDO | <1% | CREDO PROJECT M24/449 – 451 Annual Technical Report for the period ended 31st December 2008 |
| A84181 | 2009 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 , Reporting Period: 01 March 2008 to 30 J |
| A84210 | 2009 | Paddington Gold Pty Ltd | Hill End | <1% | HILL END PROJECT Mineral Exploration Report, Period: 1 July 2008 – 30 June 2009, Tenements: M24/78, M24/876 |
| A77921 | 2008 | Yilgarn Mining (Wa) Pty Ltd | Credo | <1% | CREDO PROJECT M24/449 - 451 Annual Technical Report for the period ended 31 December 2007 (GSWA Reference C171 |
| A77783 | 2008 | Nickelore Ltd | BTZ Bardoc | 21% | BTZ BARDOC 2007 ANNUAL REPORT Reporting Period: 01 January 2007 to 31 December 2007 Joint Reporting Status: C8 |
| A77165 | 2008 | Paddington Gold Pty Ltd | Paddington Operations | <1% | Paddington Operations Project C101/2004 Reporting Period: 01/12/2006 to 30/11/2007 M24/20, M24/180, M24/181, M |
| A77591 | 2008 | Paddington Gold Pty Ltd | Mount Ellis | <1% | Mt Ellis Project Annual Report Reporting Period: 01 January 2007 31 December 2007 C169/1997 |
| A77602 | 2008 | Nickelore Ltd | Bardoc Extended | <1% | BARDOC EXTENDED PROJECT 2007 ANNUAL REPORT Reporting Period: 01 January 2007 to 31 December 2007 Joint Reporti |
| A78409 | 2008 | Paddington Gold Pty Ltd | ABATTOIR NORTH | <1% | ABATTOIR NORTH PROJECT Annual Report C107/2004 Reporting Period: 1 April 2007 - 31 March 2008 Tenements: E24/5 |
| A80538 | 2008 | Paddington Gold Pty Ltd | HILL END | <1% | M24/78 HILL END PROJECT Annual Report, Period: 16 December 2007 – 15 December 2008 |
| A81259 | 2008 | Minara Resources Ltd | Bardoc Extended | <1% | Bardoc Extended Combined Annual Technical Report C51/2003, 2008, TR1423, 01 January 2008 - 31 December 2008 |
| A74217 | 2007 | Barrick (Kanowna) Ltd | Parmelia / Paddington | <1% | Paddington Operations Project C101/2004 Annual Report for the Period 01/12/2005 - 30/11/2006 Report No.WA07.02 |
| A74833 | 2007 | Barrick Gold Of Australia Ltd | Mount Ellis | <1% | Mt Ellis Project, Annual Report for the period 1st January 2006 to 31st December 2006, M24/397-398, M24/861. |
| A74859 | 2007 | Halcyon Group Ltd | BTZ Bardoc | 21% | BTZ Bardoc Project (C87/1994), 2006 Annual Report Reporting Period: 01 January 2006 to 31 December 2006 |
| A74860 | 2007 | Halcyon Group Ltd | Bardoc Extended | <1% | Bardoc Extended Project (C51/2003), 2006 Annual Report Reporting Period: 01 January 2006 to 31 December 2006 |
| A74863 | 2007 | Yilgarn Mining (Wa) Pty Ltd | Credo | <1% | Annual Technical Report - Credo Project, Western Australia. Period ending 31 December 2006 (M24/449 – 451) |
| A75242 | 2007 | Barrick Gold Of Australia Ltd | Abattoir North | <1% | Abattoir North Project, (C107/2004) Annual Report for the period 1st April 2006 to 31st March 2007, E24/, 103, |
| A71783 | 2006 | Placer Dome Australia Ltd | Paddington Operations project | <1% | Paddington Operations Project, 01/12/2004 to 30/11/2005, C101/2004, (Annual Report, Placer Dome Report No. WA0 |
| A71793 | 2006 | Placer Dome Asia Pacific Ltd | Hill End | <1% | Hill End Project, 16 December 2004 to 15 December 2005, M24/78, (Annual Report, Placer Dome Report No. WA06.07 |
| A72301 | 2006 | Halcyon Group Ltd | Bardoc Extended | <1% | Bardoc Extended 2005 Annual Report, Period 01 January 2005 to 31 December 2005, C51/2003, (Kalgoorlie). |
| A72303 | 2006 | Halcyon Group Ltd | BTZ Bardoc | 22% | BTZ Bardoc 2005 Annual Report, Period 01 January 2005 to 31 December 2005, Combined Reporting No. C87/1994, M2 |
| A72446 | 2006 | Placer Dome Asia Pacific Ltd | Black Flag (Mount Pleasant) | <1% | Abattoir North Project, Annual Report, 1 April 2005 to 31 March 2006, C107/2004, E24/57.................M24/22 |
| A72520 | 2005 | Yilgarn Mining (Wa) Pty Ltd | Credo | <1% | Credo Project M24/449-451, Annual Technical Report for the Period Ended 31 December 2005, Combined Reporting N |
| A69897 | 2005 | Placer Dome Asia Pacific Ltd | Paddington | <1% | Annual report for the period 01/12/03 - 30/11/04 Paddington Operations Project, C101/2004, M24/20, M24/180, M2 |
| A70258 | 2005 | Yilgarn Mining Pty Ltd | Credo | <1% | Credo Project, M24/449-451, Annual technical report for the period 31 December 2004, (GSWA Reference C171/1 |
| A70397 | 2005 | Halcyon Group Ltd | BTZ Bardoc | 22% | Annual report for the period 01/01/04 - 31/12/04 Bardoc Project, C87/1994, M24/133, M24/134, M24/348, M24/471 |
| A70399 | 2005 | Halcyon Group Ltd | Bardoc Extended | <1% | Annual report for the period 01/01/04 - 31/12/04 Bardoc Extended Project, C51/2003, M24/96, 146, 395, 405, M24 |
| A70545 | 2005 | Placer Dome Asia Pacific Ltd | Abbattoir North | <1% | Abattoir North Project, Annual Report, 1 April 2004 to 31 March 2005, C107/2004,E24/57, ...........,M24/101, M |
| A68229 | 2004 | Placer Dome Asia Pacific Ltd | Hill End | <1% | Hill End Agreement Project, Annual Report M24/78 for period 01/01/2003-31/12/2003. |
| A68335 | 2004 | Yilgarn Mining Pty Ltd | Credo | <1% | Credo Project M24/449 to 451 (formerly P24/2395 to 2406) Ann ual Technical Report for the period ended 31 Dece |
| A68413 | 2004 | Placer Dome Asia Pacific Ltd | Mount Ellis | <1% | Annual report for the period 01/01/2003-31/12/2003 Mount Ellis Project (C169/1997), M24/238, M24/397-398 M24/8 |
| A68415 | 2004 | Placer Dome Asia Pacific Ltd | Broad Arrow | <1% | Annual report for the period 01/12/2002-30/11/2003 Broad Arrow Operations Project (C18/1998), M24/188, M24/251 |
| A68417 | 2004 | Placer Dome Asia Pacific Ltd | BTZ Bardoc | 22% | Annual Report for the period 01/01/2003-31/12/2003 BTZ Bardoc Project (C87/1994), P24/2495, M24/133-34, M24/34 |
| A68501 | 2004 | Halcyon Group Ltd | Bardoc Extended | <1% | Annual report for the period 01/01/2003-31/12/2003 Bardoc Extended Project (C51/2003), M24/96, M24/146, M24/39 |
| A69892 | 2004 | Placer Dome Asia Pacific Ltd | Hill End | <1% | Hill End Project 16 December 2003 to 15 December 2004 Annual report, M24/78, Kalgoorlie, PDAP Report number WA |
| A65957 | 2003 | Placer Dome Asia Pacific Ltd | Broad Arrow | <1% | Annual Report for the period 01/12/2001-31/11/2002, Broad Arrow Project, C18/1998, M24/188, M24/251, M24/425, |
| A66165 | 2003 | Placer Dome Asia Pacific Ltd | BTZ Bardoc | 18% | Annual Report 01/01/2002-31/12/2002 BTZ Bardoc Project C87/1994: P24/2495, 3295, 3527-28, 3644, M24/146, 133-3 |
| A66352 | 2003 | Placer Dome Asia Pacific Ltd | Mount Ellis | <1% | Mt Ellis Project Annual Report 01/01/2002-31/12/2002 C169/1997: P243247, 3483, 3619, M24/238, 397-98, 861 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | <1% | Kalgoorlie High Resolution Gravity Surveys. |
| A64223 | 2002 | Paddington Gold Pty Ltd | Broad Arrow | <1% | Annual Technical Report for the period 1st December 2000 to 30th November 2001 Broad Arrow Project tenements M |
| A64281 | 2002 | Homestake Gold Of Australia Ltd | Credo | <1% | Annual Report period 1 January 2001 - 31 December 2001 Credo JV P24/2395-2406 Verification Listing Report. Ma |
| A64426 | 2002 | Paddington Gold Pty Ltd | BTZ Bardoc | 11% | Annual Technical Report 2001 BTZ Bardoc Project Reporting Period 01/01/2001 to 30/12/2001. Tenements P24/2495, |
| A64681 | 2002 | Paddington Gold Pty Ltd | Mount Ellis | <1% | Mt Ellis Project, Reporting Period 01/01/01 to 31/12/01, M24/861, M24/238, M24/397, M24/398, M24/487; P24/2689 |
| A61696 | 2001 | Goldfields Ltd | Broad Arrow | <1% | Technical Report Project Broad Arrow tenement(s):M24/188, M24/251, M24/425 & M24/557 Annual Report for the per |
| A61826 | 2001 | Homestake Gold Of Australia Ltd | Credo | <1% | Project 6466, Credo JV, P24/2395-2406, Annual Report, Period 1 January 2000 - 31 December 2000. Technical Repo |
| A62349 | 2001 | Kundana Gold Pty Ltd | Bardoc | 11% | Annual Report Bardoc Project Reporting Period 01/01/00 to 31/12/00 Tenements M24/96,M24/133-134, M24/146, M24/ |
| A62464 | 2001 | Goldfields Exploration Pty Ltd | Mount Ellis | <1% | Annual Report Mt Ellis Project Reporting Period 01/01/00 to 31/12/00 Tenements: GML24/2523, M24/238, M24/397, |
| A59671 | 2000 | Paddington Gold Pty Ltd | Broad Arrow | <1% | Broad Arrow, Tenements M24/188,251,425,557, Annual Report. (1998 to 1999) |
| A59880 | 2000 | Homestake Gold Of Australia Ltd | Credo | <1% | Project 6466 Credo JV P24/2395-2406 Annual Report Period 01 Jan 1999 to 31 December 1999 Technical Report No. |
| A60249 | 2000 | Goldfields Exploration Pty Ltd | Mount Ellis | <1% | Annual Report, Mt Ellis Project, for the period 01/01/1999 to 31/12/1999, GML24/2523;M24/238,M24/397,M24/398 |
| A60255 | 2000 | Goldfields Exploration Pty Ltd | Bardoc | 11% | Annual Report Bardoc Project Reporting Period 01/01/1999 to 31/12/1999 Tenements M24/96,M24/133-134,M24/146,M2 |
| A57069 | 1999 | Goldfields Exploration Pty Ltd | Broad Arrow | <1% | Broad Arrow Project, M24/557, 188, 251, 425 , Annual Report for the year ending 31/12/1998. |
| A57420 | 1999 | Homestake Gold Of Australia Ltd | Credo | <1% | Annual Report P24/2395-2406 Period 01/01/1998 to 31/12/1998 |
| A57719 | 1999 | Goldfields Exploration Pty Ltd | Mount Ellis | <1% | Annual Report, Mt Ellis Project , 01/01/98 - 31/12/98 ,M24/238, 397-398, GML24/2523, 2582, 3247, 3438, 3483, 3 |
| A57778 | 1999 | Goldfields Exploration Pty Ltd | Bardoc | 11% | Bardoc Project 01/01/98 - 31/12/98 |
| A59290 | 1999 | Goldfields Exploration Pty Ltd | Hill End | <1% | Annual Report on the Hill End Project, Reporting Period 01 January 1998 to 31 December 1998, Tenements GML24/2 |
| A60328 | 1999 | Goldfields Exploration Pty Ltd | Hill End | <1% | Annual Report Hill End Project Reporting Period 01/01/1999 to 31/12/1999 Tenements GMl24/2524,M24/78 Ref No. C |
| A53367 | 1998 | Paddington Gold Pty Ltd | Broad Arrow | <1% | Broad Arrow Project, Annual Report, P24/3285-3289, M24/188, 231, 425,for the period 12/1996 - 11/1997. |
| A53611 | 1998 | Australasian Gold Mines Nl | Broad Arrow | 8.7% | Annual report for M24/104 (01/97-01/98) |
| A53851 | 1998 | Paddington Gold Pty Ltd | Mount Ellis | <1% | Mt Ellis Project, Annual Report, GML24/2523,M24/397 & 398,for the period 01/1997 - 12/1997. |
| A54004 | 1998 | Goldfields Exploration Pty Ltd | Bardoc | 12% | Bardoc Project - Annual Report 01/01/1997 - 31/12/1997 M24/133-134, 96, 146, 202, 348, 405, 420, 440-442, 460, |
| A54501 | 1998 | Plutonic Operations Ltd | Credo | <1% | Project 466 - Credo JV P24/2395-2406 Annual Report 01/01/97 - 31/12/97 Technical Report No: 678 |
| A54876 | 1998 | Fimiston Mining Nl | Hill End | <1% | Annual Report, Hill End Group of Tenements GML24/2524, M24/78 01/01/1997 - 31/12/1997 |
| A50787 | 1997 | Paddington Gold Pty Ltd | Parmelia - Paddington | <1% | Mining Lease M24/188 Annual report for the period March 29, 1996 to March 28, 1997 |
| A51158 | 1997 | Fimiston Mining Ltd | Hill End | <1% | Hill End Project Combined Annual report 1st January 1996 to 31st December 1996 Tenements M24/78 GML24/2524 |
| A50306 | 1997 | Goldfields Exploration Pty Ltd | Bardoc | 11% | Annual report Bardoc period covered 01/01/1996 to 31/12/1996 Tenements M24/133 M24/134 M24/96 M24/146 M24/202 |
| A52708 | 1997 | Centaur Mining & Exploration Ltd | SIberia | <1% | Prospecting Licences P24/3144-3146,3169,3171-3184,3186-3189, 3195-3196,3276,3434-3466,3532 'Siberia Project' |
| A47221 | 1996 | Fimiston Mining Ltd | Mount Ellis | <1% | Mount Ellis Project Western Australia combined annual rept M24/397 M24/398 PL24/2582 period 28/01/95 to 27/01/ |
| A47920 | 1996 | Aurora Gold Ltd | Credo | <1% | H357 Credo Project Western Australia Annual Technical Report Period 1 Januray 1995 to 31 December 1995 Prospec |
| A47211 | 1996 | Goldfields Exploration Pty Ltd | Bardoc | 12% | Annual report Bardoc Project period covered 01/01/95 to 31/12/95 Tenement M24/133 to M24/134 M24/348 M24/405 M |
| A47800 | 1996 | Goldfields Exploration Pty Ltd | Broad Arrow | <1% | Annual report Project Broad Arrow period covered 07/01/95 to 06/01/96 TenRments P24/3285 to P24/3289 M24/425 R |
| A43772 | 1995 | Aurora Gold Ltd | Credo | <1% | Annual Technical Report Credo Project Western Australia Prosepcting Licence P24/2395 to P24/2406 period 1 Janu |
| A44211 | 1995 | Pancontinental Mining Ltd | Bardoc North | 12% | Bardoc Annual Report 1 January 1994- 31 December 1994 (February 1995) |
| A44473 | 1995 | Pancontinental Mining Ltd | Broad Arrow | <1% | Broad Arrow annual report 7th January 1994 to 6th January 1995 P24/3285 to P24/3289 |
| A44828 | 1995 | Fimiston Mining Ltd | Hill End | <1% | Annual report period 16/12/93 to 15/12/94 Tenement M24/78 (Hill End Project) |
| A44830 | 1995 | Fimiston Mining Ltd | Mount Ellis | <1% | Annual Report Period: 28/1/94 to 27/1/95 Tenement: M24/397 Compiled: May 1995, (Mount Ellis Project) |
| A40893 | 1994 | Aurora Gold Ltd | Credo | <1% | Annual Report for the period 01/01/93-31/12/93 Credo Project P24/2395-2406 |
| A41091 | 1994 | Fimiston Mining Ltd | Mount Ellis | <1% | Mount Ellis Project, Annual Report for the period 27//02/1993 to 26/02/1994, P24/2582. |
| A41155 | 1994 | Pancontinental Mining Ltd | Bardoc Option | 12% | Annual Report 01/01/93 - 31/12/93 Bardoc Option (Project) (M8049) (M24/133, M24/134, M24/348, M24/405, P24/23 |
| A41977 | 1994 | Pancontinental Mining Ltd | Paddington | <1% | Annual report for the period 01/07/93-30/06/94 Paddington Project (Report K94/019R) (E24/59, E26/41, M24/101, |
| A42876 | 1994 | Pancontinental Mining Ltd | Stockdale | 35% | Stockdale Option Annual report (M24/96) 8 October 1993 - 7 October 1994 |
| A38405 | 1993 | Ashton Gold Wa Ltd | Mount Ellis | <1% | Annual Report for the period 01/01/92-31/12/92 Mt Ellis Project P24/2117-2128,2130,2582 |
| A38407 | 1993 | Ashton Gold Wa Ltd | Credo | <1% | Annual Report for the period 01/01/92-31/12/92 Credo Project P24/2395-2406 |
| A40098 | 1993 | Mmc Management Pty Ltd | Mount Ellis | <1% | Annual report for the period 01/93-12/93 Mt Ellis Project M24/397 M24/398 |
| A35625 | 1992 | Pancontinental Goldmining Areas Pty Ltd | Golden Arrow | <1% | Annual Report, M24/188 Golden Arrow 22/03/91 - 21/03/92 |
| A35105 | 1992 | Mmc Management Pty Ltd | Broad Arrow | 4.6% | Annual Report Period Ending 27/01/92 - 29/11/91 M24/104 & M24/329 (Broad Arrow Project) |
| A35631 | 1992 | Ashton Gold Wa Ltd | Broad Arrow | 34% | Annual Technical Report 01/01/91-31/12/91 Broad Arrow Project Mining Lease 24/133,134; Prospecting Lic enses 2 |
| A33247 | 1991 | Pancontinental Goldmining Areas Pty Ltd | Golden Arrow | <1% | Annual Report For the Period 22/03/90 - 21/03/91 M24/188 (Golden Arrow Project) |
| A33856 | 1991 | Dominion Mining Ltd | Credo | <1% | Annual Report covering the Period 01/01/90 - 31/12/90 Credo Well; Prospecting Licenses P24/2395-2406 |
| A35067 | 1991 | Pancontinental Goldmining Areas Pty Ltd | Paddington | <1% | Annual rehabilitation report for the Pancontinental Kalgoorlie Operations Inclues Paddington Project, Kundana |
| A27579 | 1989 | Pancontinental Goldmining Areas Pty Ltd | Golden Arrow | <1% | Annual report M24/188 (Golden Arrow) 29/03/88 to 28/03/89 Pancontinental Goldmining areas Pty Ltd : Coopers Re |
| A25761 | 1988 | Fimiston Mining Ltd | Hill End East | <1% | Annual Report for M24/78, Hill End East gold Project (11/1988, Kalgoorlie). |
| A23299 | 1987 | Technomin Australia Nl | Credo | <1% | Broad Aroow Mineral Field W.A. Annual Report to the 04/10/1987 Credo E24/4, M24/105-106, M24/178, GML's 24/252 |
| A20107 | 1987 | Technomin Australia Nl | Credo | <1% | Credo Project 1986 Annual report E24/4 P24/422 P24/844 PL24/845 GML24/2357 GML24/2523 March 1987 |
| A21596 | 1987 | Associated Resources Management | Broad Arrow | <1% | Annual report P24/168 Broad Arrow for the period 21 August 1986 to 20 August 1987 |
| A22339 | 1987 | Associated Resources Management | Broad Arrow | <1% | Report on the results of infill Drilling at Eldorado Prospect, Broad Arrow, including and updated Ore Reserve |
| A22525 | 1987 | Fimiston Mining Ltd | Hill End | <1% | Annual report on Mining Lease M24/78 Hill End East Gold Project. Fimiston Mining Project W13 |
| A18700 | 1986 | Associated Resources Management | Broad Arrow | <1% | Report on Prospecting Licence P24/168 (Plant Lease), Broad Arrow Joint Venture Western Australia (1986) |
| A17287 | 1986 | Hunter Resources Ltd | Credo | <1% | Annual report 1985 Credo Exploration Licence E24/4 Broad Arrow Mineral Field Western Australia Edited to cover |
| A15113 | 1985 | Samantha Exploration Nl | Broad Arrow JV | 3.8% | Broad Arrow Joint Venture Open Hole Drilling Between Victory & Talbot Deposits Technical Report No. 229 |
| A15114 | 1985 | Samantha Exploration Nl | El Dorado | <1% | El Dorado Gold Deposit Broad Arrow Western Australia Geology and Mineral Reserve November 1984 Technical Repor |
| A14807 | 1985 | Western Mining Corporation Ltd | Sand King | 2.2% | Annual report Sand King Tenement Holdings 22 June 1983 to 19 June 1984 |
| A16494 | 1985 | Hunter Resources Ltd | Credo | <1% | Summary of Exploration Licence E24/4 Broad Arrow Mineral Field Western Australia 1985 |
| A17494 | 1985 | Samantha Exploration Nl | Broad Arrow | 13% | Broad Arrow Joint Venture Western Australia Talbot Gold Prospect Geology and Mineralisation February 1985 (MC2 |
| A14132 | 1984 | Samantha Exploration Nl | Crossley's | 1% | Crossley's Project, Non-statutory Report: Open-Hole Percussion Drilling Programme, February 1984,(Bardoc Join |
| A14321 | 1984 | Anaconda Aust Inc | Credo | <1% | Credo Project, Credo Well Mapping, E.L. 24/4, Kalgoorlie 1:250ooo sheet SH51-9 3137-11 [Annual Report, Septem |
| A4100 | 1973 | Kennecott Explorations ( Australia) Ltd | Mount Ellis - Kalgoorlie Twelve | 1.6% | Mount Ellis - Kalgoorlie Twelve Project, Non-statutory Report:Final Report for the year ending 31/12/1972, M |
| A3336 | 1972 | Consolidated Gold Fields Aust Ltd | Leeks | <1% | Leeks Project, Final Surrender Report, December 1972, MC26/920, 943-946, 1057; MC24/459, 462, 478, 479, 497-49 |
| A10568 | 1972 | Consolidated Gold Fields Aust Ltd | Leek's | <1% | Leek's Project, Non-statutory Report: Rotary Airblast Drill Logs 445-569, August 1972, MC26/920......MC26/1057 |
| A2905 | 1972 | Western Mining Corporation Ltd | Cockarrow - Railway Well | <1% | Cockarrow - Railway Well Project, Annual Report for the year ending 30th June 1972, MC53/939-967, 1635-1636, 1 |
| A10567 | 1972 | Consolidated Gold Fields Aust Ltd | Leek's | <1% | Leek's Project, Non-statutory Report: Report containing Rotary Airblast Drill Logs 321- 444, May 1972, MC26/92 |
| A10564 | 1972 | Consolidated Gold Fields Aust Ltd | Leek's | <1% | Leek's Project, Non-statutory Report: Report on 1) Diamond Drill Log Hole 1;2) Auger & Schram Drill hole Logs; |
| A10565 | 1972 | Consolidated Gold Fields Aust Ltd | Leek's | <1% | Leek's Project, Non-statutory Report: Report containing Rotary Airblast Drill Logs, Holes 1-163, May 1972, MC2 |
| A10566 | 1972 | Consolidated Gold Fields Aust Ltd | Leek's | <1% | Leek's Project, Non-statutory Report: Report containing Rotary Air Blast Drill Logs, Holes 164-320, May 1972, |
| A105 | 1970 | Western Mining Corporation Ltd | Ora Banda- Kunanalling | <1% | Ora Banda- Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Reports Data File, |
| A106 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Kalgoorlie Regional & Geological Plans (8), circa July |
| A107 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report ,Data File |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A108 | 1970 | Western Mining Corporation Ltd | Ora Banda/Kunanalling | <1% | Annual Tenements and Temporary Reserve Report Data File, Ora Banda - Kunanalling Area. |
| A109 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report,Folder 8,In |
| A110 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenement & Temporary Reserve Report, Folder 9, Vac |
| A111 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenements & Temporary Reserve Report Folder 10,Sam |
| A50577 | 1753 | Paddington Gold Pty Ltd | Mount Ellis | <1% | Mining Lease M24/397 Annual report for the period January 28th 1996 to January 27th 1997 Mount Ellis Prospect |
| A23099 | 1753 | Pancontinental Mining Ltd | Golden Arrow | <1% | Golden Arrow Project Annual Report 1987/1988 GML24/2497 PL24/862 PL24/1199 PL24/1226 M24/188 |
| A26038 | 1753 | Electrum Nl | Broad Arrow | 30% | Broad Arrow Joint Venture Area 01/11/87 - 01/03/88 ML24/132-134 |
| A26040 | 1753 | Electrum Nl | Broad Arrow | <1% | Broad Arrow 'South Talbot Extension' 01/10/88 - 30/12/88 M24/132 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A40740 | 1753 | Fimiston Mining Ltd | Hill End | <1% | (Annual) Report for the period 16/12/92-15/12/93 Hill End East Project M24/78 Broad Arrow |
| A46606 | 1753 | Fimiston Mining Ltd | Hill End | <1% | Hill End Project Broad Arrow Western Australia Combined Annual Report Tenement: M24/78 GML24/2524 period:01/01 |
| A46607 | 1753 | Fimiston Mining Ltd | Parmelia - Paddington | <1% | Broad Arrow Hill End East Prospect M24/78 report for the period 16/12/92 to 15/12/93 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 24/133 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 24/133? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.