M 24/165
M 24/165 is a live mining lease in the City of Kalgoorlie-Boulder, Western Australia, held by Paddington Gold Pty Limited. Granted on 24 Dec 1987 for 21 years (renewed), it expires on 23 Dec 2029. The ground is covered by 68 historical WAMEX reports.
Register summary
- Holder
- Paddington Gold Pty Limited
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 16 June 1987
- Commenced
- 24 Dec 1987
- Expiry
- 23 Dec 2029
- Term
- 21 Years (Renewed)
The full record on M 24/165
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 8 changes of holder
- The full record: 39 years of expenditure, 62 conditions and 1 endorsement
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (38 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A136352 | 2023 | Paddington Gold Pty Ltd | Paddington | 2.5% | Paddington Project C36/2009 Annual Report for the period ending 30/6/2023 |
| A131932 | 2022 | Paddington Gold Pty Limited | Paddington | 2.5% | Paddington Project Annual Report C36/2009 for the period ending 30/06/2022 |
| A127829 | 2021 | Paddington Gold Pty Limited | Paddington | 2.5% | Paddington Project Annual Report C36/2009 for the period 1 July 2020 to 30 June 2021. |
| A124061 | 2020 | Horizon Minerals | Black Flag | <1% | 2020 Annual Technical Report for Black Flag Project C66/2018 for the period ending 1/4/2020 |
| A124772 | 2020 | Paddington Gold Pty Limited | Paddington | 2.5% | Paddington Project Annual Mineral Exploration Report C36/2009 for the period ending 30/06/2020 |
63 more reports
| A121946 | 2019 | Rose Dam Resources Nl | Credo South | <1% | Credo South Project Annual Report for M24/451 Rose Dam for the period 30 September 2018 to 29 September 2019 |
| A120672 | 2019 | Paddington Gold Pty Limited | Paddington | 2.5% | Mineral Exploration Report Volume 2 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A120238 | 2019 | Black Mountain Gold Limited | Black Flag | <1% | C66/2018 Black Flag Combined Annual Report for the period 02/04/2018 to 01/04/2019 |
| A120671 | 2019 | Paddington Gold Pty Limited | Paddington | 2.5% | Mineral Exploration Report Volume 1 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A117392 | 2018 | Paddington Gold Pty Limited | Paddington | 2.5% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 for the period 1 July 2017 to 30 June 201 |
| A117404 | 2018 | Paddington Gold Pty Limited | Paddington | 2.5% | Paddington Project C36/2009 Mineral Exploration Report Volume 2 of 2 for the period 1 July 2017 to 30 June 201 |
| A115757 | 2018 | Rose Dam Resources Nl | Rose Dam | <1% | Annual Report for M24/451 Rose Dam Project for the period 30 September 2016 to 29 September 2017 |
| A116961 | 2018 | Black Mountain Gold Ltd | Black Flag | <1% | Annual Technical Report for C66/2018 for the period 2 April 2017 to 1 April 2018, P24/05143, P24/05144, P24/05 |
| A118418 | 2018 | Rose Dam Resources Nl | Rose Dam | <1% | Annual Report for M24/451 Rose Dam for the period 30/09/2017 to 29/09/2018 |
| A114535 | 2017 | Paddington Gold Pty Limited | Paddington | 2.6% | Annual Mineral Exploration Report Paddington Project C36/2009 for the period 1 July 2016 to 30 June 2017 |
| A109539 | 2016 | Paddington Gold Pty Limited | Paddington | 2.5% | Annual Report For the Period 1 July 2015 to 30 June 2016 PADDINGTON PROJECT C36/2009 |
| A110405 | 2016 | Rose Dam Resources Nl | Credo South | <1% | Annual Report M24/00451 Credo South Project for the period 30 September 2015 to 28 September 2016 |
| A106287 | 2015 | Paddington Gold Pty Ltd | Paddington | 2.5% | Paddington Project C36/2009 Mineral Exploration Report for the period 01 July 2014 to 30 June 2015, M24/16.... |
| A107410 | 2015 | Rose Dam Resources Nl | Credo South | <1% | ANNUAL REPORT M24/451 Covering the period 30 September 2014 to 28 September 2015 [Credo South] |
| A103131 | 2014 | Paddington Gold Pty Ltd | Paddington | 1.9% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 Reporting Period: 01 July 2013 to 30 June |
| A99302 | 2013 | Paddington Gold Pty Ltd | Paddington | 1.9% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2012 to 30 June 2013, M16/211.....P26/3613 |
| A94950 | 2012 | Paddington Gold Pty Ltd | Paddington | 1.9% | Paddington Project C36/2009 Mineral Exploration Report, Volumes 1 to 7, Reporting Period: 01 July 2011 to 30 J |
| A90899 | 2011 | Paddington Gold Pty Ltd | Paddington | 1.8% | Paddington Project C36/2009 Mineral Exploration Report, Reporting Period: 01 July 2010 to 30 June 2011 |
| A87700 | 2010 | Paddington Gold Pty Ltd | Paddington | 1.8% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2009 to 30 June 2010 |
| A81793 | 2009 | Yilgarn Mining (Wa) Pty Ltd | CREDO | <1% | CREDO PROJECT M24/449 – 451 Annual Technical Report for the period ended 31st December 2008 |
| A84181 | 2009 | Paddington Gold Pty Ltd | Paddington | 1.8% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 , Reporting Period: 01 March 2008 to 30 J |
| A77921 | 2008 | Yilgarn Mining (Wa) Pty Ltd | Credo | <1% | CREDO PROJECT M24/449 - 451 Annual Technical Report for the period ended 31 December 2007 (GSWA Reference C171 |
| A78409 | 2008 | Paddington Gold Pty Ltd | ABATTOIR NORTH | <1% | ABATTOIR NORTH PROJECT Annual Report C107/2004 Reporting Period: 1 April 2007 - 31 March 2008 Tenements: E24/5 |
| A78766 | 2008 | Paddington Gold Pty Ltd | Mount Pleasant | 5.5% | MT PLEASANT PROJECT Mineral Exploration Report C106/2004 Reporting Period: 1 April 2007 - 31 March 2008 Paddin |
| A75401 | 2007 | Barrick Gold Of Australia Ltd | Mount Pleasant | 5% | Mount Pleasant Project, Annual Report for the period 1st April 2006 to 31st March 2007, M16/211, M24/16, M24/ |
| A74863 | 2007 | Yilgarn Mining (Wa) Pty Ltd | Credo | <1% | Annual Technical Report - Credo Project, Western Australia. Period ending 31 December 2006 (M24/449 – 451) |
| A75242 | 2007 | Barrick Gold Of Australia Ltd | Abattoir North | <1% | Abattoir North Project, (C107/2004) Annual Report for the period 1st April 2006 to 31st March 2007, E24/, 103, |
| A72446 | 2006 | Placer Dome Asia Pacific Ltd | Black Flag (Mount Pleasant) | <1% | Abattoir North Project, Annual Report, 1 April 2005 to 31 March 2006, C107/2004, E24/57.................M24/22 |
| A72494 | 2006 | Placer Dome Asia Pacific Ltd | Black Flag (Mount Pleasant) | 5% | Mt Pleasant Project, Annual Report, 01/04/2005 to 31/03/2006 , C106/2004, (PDAP Report No. WA06.015, Kalgoorli |
| A72520 | 2005 | Yilgarn Mining (Wa) Pty Ltd | Credo | <1% | Credo Project M24/449-451, Annual Technical Report for the Period Ended 31 December 2005, Combined Reporting N |
| A70258 | 2005 | Yilgarn Mining Pty Ltd | Credo | <1% | Credo Project, M24/449-451, Annual technical report for the period 31 December 2004, (GSWA Reference C171/1 |
| A70545 | 2005 | Placer Dome Asia Pacific Ltd | Abbattoir North | <1% | Abattoir North Project, Annual Report, 1 April 2004 to 31 March 2005, C107/2004,E24/57, ...........,M24/101, M |
| A70687 | 2005 | Placer Dome Asia Pacific Ltd | Mount Pleasant | 4.7% | (Mount Pleasant Project) Annual report, 01/04/04 - 31/03/05 C106/2004 (M16/211, M24/16, 60, 79-82, 102, 137, 1 |
| A68335 | 2004 | Yilgarn Mining Pty Ltd | Credo | <1% | Credo Project M24/449 to 451 (formerly P24/2395 to 2406) Ann ual Technical Report for the period ended 31 Dece |
| A68756 | 2004 | Placer Dome Asia Pacific Ltd | Mount Pleasant | 3.4% | Mt Pleasant Project ,Annual Report 01/04/2003 to 31/03/2004 C330/1997 E24/68, E24/103, M16/211...P24/3581 |
| A67339 | 2003 | Placer Dome Asia Pacific Ltd | Mount Pleasant | 3.4% | Mount Pleasant project, Annual Report for the period 01/04/2002 to 31/03/2003 C330/1997: E24/68,103 M16/211 M2 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | <1% | Kalgoorlie High Resolution Gravity Surveys. |
| A65210 | 2002 | Auriongold Exploration Pty Ltd | Mount Pleasant | 3.1% | Mt Pleasant Project Annual Report 01/04/2000 - 30/04/2002 C330/1997 Tenement/s E24/57, 68, M24/16, 60, 79-82, |
| A61373 | 2000 | Centaur Mining & Exploration Ltd | Mount Pleasant | 2.6% | Mount Pleasant Project, Annual Report for the period 1st April 1999 to 31st March, Combined Reporting Group: C |
| A59091 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | 2.6% | Mt Pleasant Project, (Joint) Annual Report for the period 01/04/1998 to 31/03/1999, C330/1997-Mt Pleasant. |
| A61943 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | 3.7% | Mount Pleasant Project, Non-statutory Report: Resources Report June 1999. |
| A55746 | 1998 | Centaur Mining & Exploration Ltd | Mount Pleasant | 2.6% | C330/1997 - Mt. Pleasant Joint Annual Report 01/04/97 - 31/03/98 Exploration Licence: E24/57, 68, Gold Lease: |
| A47465 | 1996 | Centaur Mining & Exploration Ltd | Black Flag (Mount Pleasant) | <1% | GML24/2486 GML24/2532 GML24/2764 GML24/3202 MLA16/211 MLA24/79 to MLA24/82 MLA16/102 MLA16/142 MLA16/155 MLA16 |
| A44820 | 1995 | Mining Corporation Of Australia Ltd | Black Flag (Mount Pleasant) | <1% | Black Flag Regional gold report. Annual report For the period 1 January 1994 to 31 December 1994. |
| A44821 | 1995 | Mining Corporation Of Australia Ltd | Black Flag | 14% | Black Flag regional gold project. Annual report for the period 1 January 1994 to 31 December 1994 |
| A41053 | 1994 | Aurora Gold Ltd | Rose Dam | <1% | Rose Dam Project, Annual Report for the period 8th January 1993 to 7th January 1994, P24/3051. |
| A41046 | 1994 | Mining Corporation Of Australia Ltd | Eastern Area | 13% | Annual Report for the Period 1 July 1992 to 31 December 1993 Eastern Area The Report Comprises: M24/165,M24/18 |
| A41047 | 1994 | Mining Corporation Of Australia Ltd | Central Area | <1% | Black Flag Gold Project Annual Report for the Period 01 July 1992 to 31 December 1993 Central Area |
| A35710 | 1992 | Black Flag Consolidated Nl | Black Flag | <1% | Annual Report for the Period 01/01/91 - 31/12/91 Black Flag i Joint Venture M24/302,303,366,390,392 |
| A36612 | 1992 | Gold Dust Holdings Pty Ltd | Buckingham | <1% | Annual report for the period 06/91 to 06/92 Buckingham Project GML24/2567 M24/182 M24/223 M24/227 M24/229 M24 |
| A36654 | 1992 | Gold Dust Holdings Pty Ltd | Oxford | <1% | Gold Dust Holdings Pty Ltd Oxford Project Annual Report for year ending 30 June 1992 M24/281 & 287, P24/2170, |
| A36748 | 1992 | Gold Dust Holdings Pty Ltd | Tattersalls | 43% | Annual Report for the Period 01/07/91 - 30/06/92 Tattersalls Project M24/67,113,148,165 |
| A31887 | 1990 | Resolute Resources Ltd | Black Flag | 97% | Diamond Drilling - Golden Flag Area; 12/89 - 03/90 Black Flag East JV (ML24/165) Kalgoorlie District, WA Repor |
| A29040 | 1989 | Astro Mining Nl | Wattle Gully | <1% | Annual Report on Mining lease 24/223 for period ending 13/03/1990 |
| A25846 | 1988 | Resolute Resources Ltd | Black Flag | 97% | Black Flag East JV & Prospect - ML24/165 Report on Exploration for the period 01/07/87-31/03/88 |
| A26001 | 1988 | Resolute Resources Ltd | Black Flag | 97% | Report on Detailed Drilling - Golden Flag area Black Flag East JV ML24/165 Kalgoorlie District WA Report No: 8 |
| A29276 | 1988 | Resolute Resources Ltd | Black Flag gold exploration | 97% | Black Flag East Prospect M24/165 (R Report for 1988) |
| A50610 | 1753 | Centaur Mining & Exploration Ltd | Black Flag | <1% | 'Black Flag Central' 'C186/1995' Joint Annual report for the period 01 January 1996 to 31 December 1996 |
| A51245 | 1753 | Centaur Mining & Exploration Ltd | Black Flag | 7.4% | 'Black Flag Eastern' C207/1996 Joint Annual report for the period 01 April 1996 to 31 March 1997 E24/68, GML24 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A47986 | 1753 | Centaur Mining & Exploration Ltd | Black Flag East JV | 8.8% | C188/1995 'Black Flag East' Joint Venture Annual report for the period 01 April 1995 to 31 March 1996 E24/0006 |
| A82879 | 1753 | Placer Dome Asia Pacific Ltd | Blister Dam | 4.9% | Ground Geophysics Survey |
| A82880 | 1753 | Placer Dome Asia Pacific Ltd | Mount Pleasant | 4.9% | Ground Geophysics Survey |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 24/165 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 24/165? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.