M 25/355
M 25/355 is a live mining lease in the City of Kalgoorlie-Boulder, Western Australia, held by Kalgoorlie Ore Treatment Company Pty Ltd (part of Maritana Minerals Limited). Granted on 13 June 2014 for 21 years, it expires on 12 June 2035. The ground is covered by 131 historical WAMEX reports.
Register summary
- Holder
- Kalgoorlie Ore Treatment Company Pty Ltd
- Part of
- Maritana Minerals Limited (ASX:MRT) as at 2025-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 15 Oct 2013
- Commenced
- 13 June 2014
- Expiry
- 12 June 2035
- Term
- 21 Years
The full record on M 25/355
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 13 years of expenditure, 38 conditions and 13 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (6 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123347 | 2020 | Horizon Minerals Limited | Nimbus | 13% | Nimbus Project Combined Annual Mineral Exploration Report (Group C148/2010) for the Period 27 February 2019 to |
| A124128 | 2020 | Tasex Geological Services Pty Ltd | Perkolilli | <1% | Combined Annual Report C5/2020 Perkolilli Project for the period ending 27/05/2020 |
| A119800 | 2019 | Macphersons Resources Ltd | Nimbus | 15% | Nimbus Project Combined Annual Mineral Exploration Report (Group 148/2010) For The Period 27 February 2018 To |
| A115667 | 2018 | Macphersons Resources Ltd | Nimbus East - Golden Ridge | <1% | C148/2010 Nimbus East-Golden Ridge Prospecting Licences 25/2068, 25/2069, 26/3704, 26/3741 and 26/3742 Final S |
| A116572 | 2018 | Macphersons Resources Ltd | Nimbus | 16% | Nimbus Project Combined Annual Mineral Exploration Report (C148/2010) for the Period 27 February 2017 to 26 Fe |
126 more reports
| A116714 | 2018 | Northern Mining Limited | East Kalgoorlie | <1% | Annual Report for East Kalgoorlie Project C107/2015 for the period 01/01/2017 - 31/12/2017 |
| A111990 | 2017 | Macphersons Resources Ltd | Balagundi | <1% | Balagundi Prospecting Licence 25/2003 Final Surrender Report for the Period until 16 December 2016 |
| A112680 | 2017 | Macphersons Resources Limited | Nimbus | 18% | Nimbus Project Combined Annual Mineral Exploration Report (Group 148/2010) For The Period 27 February 2016 To |
| A113955 | 2017 | Macphersons Resources Limited | Balagundi - Nimbus | <1% | Balagundi-Nimbus Prospecting Licences 26/3640, 25/2004-2007, 25/2014-2017, 25/2061, 26/3634-3636 and 26/3699-3 |
| A113982 | 2017 | Northern Mining Limited | East Kalgoorlie | <1% | Annual Report for EAST KALGOORLIE PROJECT C107/2015 for the period 1 January 2016 to 31 December 2016, E25/004 |
| A108375 | 2016 | Newexco Services Pty Ltd | East Kalgoorlie | <1% | ANNUAL REPORT FOR EAST KALGOORLIE PROJECT Combined Reporting Group C107/2015 for the Period 1st January 2015 t |
| A108579 | 2016 | Macphersons Resources Ltd | Nimbus Project Group | 9.7% | Nimbus Project Combined Annual Mineral Exploration Report (Group 148/2010) For The Period 27 February 2015 To |
| A109736 | 2016 | Macphersons Resources Limited | Nimbus | <1% | BALAGUNDI-KANOWNA SOUTH PROSPECTING LICENCES 25/2008-2013, 25/2264-2266, 25/1957-1958, 25/2229-2231, 27/2118-2 |
| A105157 | 2015 | Newexco Services Pty Ltd | East Kalgoorlie | <1% | East Kalgoorlie Project, Annual Report for the period 01/01/2014 to 31/12/2014, C44/2007. E25/268, 424, 447,.. |
| A105457 | 2015 | Macphersons Resources Ltd | Nimbus | 10% | Nimbus Project Combined Annual Mineral Exploration Report C148/2010 for the period 27 February 2014 to 26 Febr |
| A101558 | 2014 | Northern Mining Ltd | East Kalgoorlie | <1% | ANNUAL REPORT FOR EAST KALGOORLIE PROJECT E25/268, 424, 447, E26/112, 117, 144, 151, 152 P25/2051, 2071, 2100, |
| A101848 | 2014 | Macphersons Resources Ltd | Nimbus | 13% | NIMBUS PROJECT COMBINED ANNUAL MINERAL EXPLORATION REPORT (GROUP 148/2010) FOR THE PERIOD 27 FEBRUARY 2013 TO |
| A102835 | 2014 | Macphersons Resources Ltd | Nimbus | 33% | Nimbus Project Final Report, EIS Nimbus Ag Grant (DAG2013/00171295) Reporting period 14/10/2013 to 30/06/2014 |
| A100969 | 2013 | Macphersons Resources Ltd | Nimbus | 8.7% | Regolith Mapping Files |
| A97610 | 2013 | Macphersons Resources | Nimbus | 33% | Nimbus Project Reporting Group C148/2010, Combined Annual Report for year ending 26 February 2013, M26/490, M2 |
| A97799 | 2013 | Macphersons Resources Ltd | Nimbus | 100% | Nimbus Project, Annual Report for the period 15th March 2012 to 14th March 2013, P25/2144. |
| A97252 | 2013 | Northern Mining Ltd | East Kalgoorlie | 5.9% | East Kalgoorlie Project, Annual Report for the period 1st January 2012 to 31st December 2012, e25/268, 424, 44 |
| A97611 | 2013 | Macphersons Resources | Boorara | 22% | Boorara Project, Annual Report for the period 27th February 2012 to 26th February 2013, M26/29,161, 277 & 318; |
| A99080 | 2013 | Macphersons Resources Ltd | Balagundi | 12% | Balagundi Project Reporting Group C142/2010, Combined Annual Report for Year Ending 30 June 2013, P25/2004.... |
| A94056 | 2012 | Macphersons Resources | Nimbus | 100% | NIMBUS PROJECT PL25/2144 REPORT NUMBER ANNUAL REPORT FOR THE PERIOD 15 MARCH 2011 TO 14 MARCH 2012 PROSPECTING |
| A94228 | 2012 | Macphersons Resources | Nimbus | 33% | Nimbus Project Reporting Group C148/2010, Combined Annual Report for year ending 26 February 2012, M26/490, M2 |
| A95204 | 2012 | Macphersons Resources | Balagundi | 12% | Combined Annual Report C142/2010 Balagundi Project For the Period 1 July 2011 to 30 June 2012, P25/2004, 2005, |
| A93464 | 2012 | Northern Mining Ltd | East Kalgoorlie | 6.1% | East Kalgoorlie Project C44/2007 Annual Report for the Period 1st January 2011 to 31st December 2011, E25/268, |
| A94227 | 2012 | Macphersons Resources | Boorara | 25% | Boorara Project Reporting Group C89/2004, Combined Annual Report for year ending 26 February 2012, M26/029, 16 |
| A89763 | 2011 | Northern Mining Ltd | East Kalgoorlie | 8.9% | Annual Report for East Kalgoorlie Project for the period 1st January 2010 to 31st December 2010, C44/2007, E25 |
| A89764 | 2011 | Northern Mining Ltd; Silver Swan Group Ltd | East Kalgoorlie | <1% | EAST KALGOORLIE PROJECT Annual Report for Golden Ridge Prospect P25/2071, P26/3705 to 3710. Annual Report for |
| A90284 | 2011 | Polymetals (Wa) Pty Ltd | Boorara | 22% | Boorara Project, Annual Report for the period 27/02/2010 to 26/02/2011, M26/29, 161, 318, 277; P25/2003, 2030, |
| A90520 | 2011 | Reed Resources Ltd | Nimbus | 33% | Nimbus Project, Annual Report for the year ending 26th February2011, M26/490 & M26/598. (C148/2010) |
| A91557 | 2011 | Cazaly Resources Ltd | Balagundi | 12% | Combined Annual Report C142/2010 Balagundi Project For the Period 1 July 2010 to 30 June 2011 |
| A86068 | 2010 | Northern Mining Ltd | East Kalgoorlie | 1.5% | Annual Report for East Kalgoorlie Projet C44/2007 E25/268; E26/112, 117, P25/1800, 1801 P26/3205, 3206, 3207, |
| A86137 | 2010 | Polymetals (Wa) Pty Ltd | Nimbus / Boorara | 15% | Reporting Group C89/2004, Combined Annual Report for M26/161, M26/29, M26/277, M26/318, M26/490, M26/598, P26/ |
| A86365 | 2010 | Northern Mining Ltd | East Kalgoorlie | 54% | EAST KALGOORLIE PROJECT - Hake Prospect, Annual Exploration Report for year ending 31st December 2009, Combine |
| A88691 | 2010 | Cazaly Resources Ltd | Balagundi | 12% | Combined Annual Report C142/2010 Balagundi Project For the Period 1 July 2009 to 30 June 2010 |
| A85029 | 2009 | Heron Resources Ltd | Balagundi | <1% | Surrender report for the period 17 July 2008 to 19 October 2009, Balagundi Project, C67/2009, P25/1994, P25/19 |
| A84389 | 2009 | Heron Resources Ltd | Balagundi | <1% | Annual report for the period 17 July 2008 to 16 July 2009, Balagundi Project, C67/2009, P25/1994, P25/1995, P2 |
| A81610 | 2009 | Northern Mining Ltd | EAST KALGOORLIE | 1.5% | ANNUAL REPORT FOR EAST KALGOORLIE PROJECT E25/268; E26/112, 117, P25/1800, 1801, P26/3205, 3206, 3207, 3208, 3 |
| A81687 | 2009 | Northern Mining Ltd | EAST KALGOORLIE (Hake) | 54% | EAST KALGOORLIE PROJECT Hake Prospect Annual Exploration Report for year ending 31st December 2008, Combined R |
| A81920 | 2009 | Polymetals (Wa) Pty Ltd | NIMBUS - BOORARA | 16% | NIMBUS-BOORARA PROJECT, REPORTING GROUP C89/2004, COMBINED ANNUAL REPORT, Year Ending February 26, 2009 M26/49 |
| A79002 | 2008 | Cortona Resources Ltd | Juglah Rocks | 24% | JUGLAH ROCKS PROJECT Tenements P25/1795, P25/1796, P25/1797 P25/1798 and P25/1799 ANNUAL TECHNICAL REPORT For |
| A79313 | 2008 | Newexco Services Pty Ltd | Snake Hill | <1% | EAST KALGOORLIE PROJECT Snake Hill Prospec Annual Exploration Report for year ending 3rd July 2008 Prospecting |
| A78002 | 2008 | Northern Mining Ltd | East Kalgoorlie | 65% | EAST KALGOORLIE PROJECT Perkolilli Prospect Annual Exploration Report for year ending 31st December 2007 C80/1 |
| A78454 | 2008 | Polymetals (Wa) Pty Ltd | Nimbus - Boorara | 16% | NIMBUS-BOORARA PROJECT REPORTING GROUP C89/2004 COMBINED ANNUAL REPORT Year Ending February 26, 2008 M26/490, |
| A75777 | 2007 | Mawson West Ltd | Eastern Nimbus Group 2 | 26% | C126/2005 - Eastern Nimbus Group 2 Tenements Combined Annual Report (including P25/1626,P25/1629,P25/1759 P25/ |
| A74756 | 2007 | Polymetals (Wa) Pty Ltd | Nimbus - Boorara | 16% | Nimbus-Boorara Project Reporting Group C89/2004 Combined Annual Report Year Ending February 26, 2007 M26/490, |
| A76684 | 2007 | Westex Resources Pty Ltd | Balagundi | <1% | Balagundi Prospect M25/173 Annual Report for the period 2/9/2006 to 1/9/2007 |
| A72653 | 2006 | Mawson West Ltd | Eastern Nimbus | 26% | C126/2005 - Eastern Nimbus Group 2 Tenements, Combined Annual Report, P25/1626,1629,1759-1765, For the Period |
| A73836 | 2006 | Westex Resources Pty Ltd | Balagundi | <1% | Balagundi Project M25/173 Annual Report for the Period 02/09/2005 to 01/09/2006 (Kurnalpi) |
| A72741 | 2006 | Polymetals (Wa) Pty Ltd | Boorara - Nimbus | 16% | Nimbus - Boorara Project, Combined Reporting No. C89/2004, Combined Annual Report Year Ending 26 February 2006 |
| A70584 | 2005 | Cazaly Resources Ltd | Kanowna Shear - Hake | <1% | Annual report P25/1663, Kanowna Shear - Hake Project, for the period 3 October 2003 - 2 October 2004, Kanowna |
| A70465 | 2005 | Polymetals (Wa) Pty Ltd | Nimbus Silver Mine | 16% | Combined annual report for the period 27/02/04 - 26/02/05 Nimbus Silver Mine Project, C89/2004, M26/29, M26/1 |
| A70538 | 2005 | Cazaly Resources Ltd | Boorara | 65% | Combined annual report for the period 01/01/04 - 31/12/04 Boorara Project, C80/1996, P25/1270-1274, Kurnalpi |
| A71229 | 2005 | Mawson West Ltd | Golden Mile South | 29% | Eastern Nimbus Group 2 Tenements, Combined annual report (including P25/1626, P25/1629, P25/1760-1765) For the |
| A68345 | 2004 | South Kal Mines Pty Ltd | Golden Ridge-Boorara | <1% | Annual Report for the period 01/09/2002-31/08/2003 Golden Ridge-Boorara Project (C70/1999), M26/29, M26/41, M2 |
| A68444 | 2004 | Polymetals (Wa) Pty Ltd | Boorara/Golden Ridge | 13% | Annual report, year ending February 26, 2004, Nimbus Silver Mine, Mining lease M26/490 |
| A68540 | 2004 | Cazaly Resources Ltd | Perkolilli | 65% | Annual report for the period 01/01/2003-31/12/2003 Perkolilli Project (C80/1996), P25/1270, P25/1271, P25/1272 |
| A69238 | 2004 | Polymetals (Wa) Pty Ltd | Nimbus | 80% | Annual report for the period ending 04/12/2003 Nimbus Project P26/2340 |
| A70156 | 2004 | South Kal Mines Pty Ltd | Golden Ridge - Boorara gold exploration | <1% | Combined annual report for the period 01/09/03 - 31/08/04 Golden Ridge - Boorara Project, C70/1999, M26/29, M2 |
| A65982 | 2003 | Hamill Resources Ltd | Perkolilli | 65% | Perkolilli Project, Annual Report for the period 23/02/2001 to 23/02/2002, P25/1270, P25/1271, P25/1272, P25 |
| A66407 | 2003 | South Kal Mines Pty Ltd | Boorara | <1% | Combined Annual Report for the period September 1 2001 to Ausgust 31 2002 Golden Ridge - Boorara Project C70/1 |
| A66803 | 2003 | Polymetals Mining Services Pty Ltd | Nimbus | 13% | Nimbus Silver Deposit Resource Modelling and Evaluation |
| A64282 | 2002 | Lachlan Resources Nl | Nimbus | 13% | Annual Report period 27 February 2001 to 26 February 2002 Nimbus M26/490. Map sheet: Kurnalpi (SH51-10) 3236. |
| A62495 | 2001 | Richfield Resources Nl | Perkolilli | 65% | Perkolilli Project, Exploration On P25/1270 to P25/1274 Combined Annual Report For The Year Ending July 31st 2 |
| A62881 | 2001 | New Hampton Goldfields Nl | Boorara | <1% | Mineral Resource Estimate Report, Boorara M26/29 M26/318 and M26/161 June 2001. |
| A64195 | 2001 | New Hampton Goldfields Nl | Boorara | <1% | Combined Annual Report for the period 1st September 2000 to 31st August 2001 reporting group C70/1999 mining l |
| A59895 | 2000 | New Hampton Goldfields Nl | Golden Ridge - Boorara | <1% | Golden Ridge - Boorara Project M26/41 ,M26/29, M26/161, M26/318, 26/433, M26/494, M26/534, P26/2821, P26/2148, |
| A61166 | 2000 | Lachlan Resources Nl | Kanowna South | 12% | Kanowna South (JV) Project, , P25/1249-1252,1276-1277, P26/2437-2440, 2459, P27/1268-1273,1300, Annual Report |
| A61167 | 2000 | Lachlan Resources Nl | Nimbus | 13% | Project 6470, Nimbus, P26/1982-1983, Annual Report, Period 1/08/1999 to 31/12/2000, Technical Report No 951. |
| A61423 | 2000 | New Hampton Goldfields Nl | Golden Ridge - Boorara | <1% | Joint Annual Report for the Golden Ridge-Boorara project, C70/1999, for the Period 31/08/1999 to 30/08/2000., |
| A57144 | 1999 | Lachlan Resources Nl | Snake Hill | 16% | Snake Hill JV - Project 6488 Annual Report P25/1225-1227, P26/2332-2340, 2343-2345, P26/2736 04/12/97 - 03/12/ |
| A57937 | 1999 | Fimiston Mining Nl | Boorara | <1% | Boorara Project 1998 Combined Annual Report M26/29,161,318 For the Period 01/01/1998 to 31/12/1998 |
| A58780 | 1999 | Acacia Resources Ltd | Boorara - Perkolilli | 65% | Boorara- Perkolilli Project , P25/1270-1274, Annual Report for the period 1/1/1999 to 31/5/1999 |
| A58906 | 1999 | Acacia Resources Ltd | Balagundi Hake | 7.8% | Balagundi Hake Project, Annual Report P25/1393 for the period 23rd September 1998 to 31st August 1999. |
| A59073 | 1999 | Lachlan Resources Nl | Nimbus | 13% | Project 6470 Nimbus P26/1982-1983 Annual report for period 01/08/98-31/07/99 Technical Report No.858 Map Sheet |
| A59074 | 1999 | Lachlan Resources Nl | Kanowna South | 12% | Kanowna South (JV) Project, P25/1249-1252 P25/1276-1277 P26/2437-2440 P26/2459 P27/1268-1273 P27/1300 Annual |
| A59539 | 1999 | Lachlan Resources Nl | Snake Hill | 16% | Snake Hill JV Project, Annual Report, P25/1225-1227, P26/2332-2340,2343-2345,2736, period 04/12/1998 to 03/12/ |
| A53447 | 1998 | Lachlan Resources Nl | Snake Hill | 16% | Snake Hills JV.Project, Annual Report P25/1225-1227, P26/2332-2340, 2343-2345, 2736 04/12/96 - 03/12/97 |
| A53699 | 1998 | Fimiston Mining Nl | Boorara | <1% | Boorara Prospect 1997 Annual report Tenements M26/29 M26/161 M26/318 for period 01/01/97-31/12/97 |
| A53876 | 1998 | Acacia Resources Ltd | Boorara-Perkolilli-Kurramia | 19% | Boorara-Perkolilli-Kurramia (JV) Project, Annual Report for the period 01/01/97-31/12/97. P25/1270-1274. P26/1 |
| A56005 | 1998 | Lachlan Resources Nl | Nimbus | 13% | Project 470 - Nimbus, P26/1982-1983 Annual Report, 01/08/97 - 31/07/98 Technical Report Number: 755 |
| A56156 | 1998 | Acacia Resources Ltd | Balagundi Sout | 13% | Balagundi South Project P25/1423 and P26/2710 Surrender Report for the Period 20th October 1995 to 30th Septem |
| A56594 | 1998 | Acacia Resources Ltd | Balagundi | 7.8% | Balagundi Hake Project Annual Report P25/1393 for the Period 22nd September 1997 to 21st September 1998 |
| A50541 | 1997 | Acacia Resources Ltd | Boorara- Perkolilli - Kurramia | 19% | Boorara- Perkolilli - Kurramia Joint Venture P26/2185 to P26/2188 P26/2369 P26/2370 P26/2387 P26/2417 to P26/2 |
| A50706 | 1997 | Fimiston Mining Ltd | Boorara | <1% | Boorara Project Annual report 1st January 1996 to 31st December 1996 Tenements: M26/29, M26/161, M26/318 |
| A52336 | 1997 | Plutonic Operations Ltd | Nimbus | 13% | Project 470 Nimbus. P26/1982-1983. Annual Report period 01/08/96-31/07/97. Report No 637. Map Sheet Kurnalpi ( |
| A52711 | 1997 | Acacia Resources Ltd | Kanowna South | 12% | Kanowna South Project, P25/1252 P25/1276,1277; P26/2437-2440; P26/2459; P27/1268-1273; P27/1300 Annual report |
| A53146 | 1997 | Acacia Resources Ltd | Balagundi South | 30% | Balagundi South Project, Annual Report for the period 1st October 1996 to 30th September 1997, P25/1110-1118, |
| A49523 | 1996 | Acacia Resources Ltd | Balagundi South | 30% | Balagundi South P25/110-118, P25/1423, P26/2710 Annual Report for the Period 1st Ocotber 1995 to 30th Septembe |
| A48972 | 1996 | Archaean Gold Nl | Boorara | 13% | Boorara Project Annual report 01/08/95 to 31/07/96 Prospecting Licences P26/1982 to P26/1983 (combined reporti |
| A49061 | 1996 | Acacia Resources Ltd | Kanowna South | 12% | Kanowna South P25/1249 to P25/1252 P25/1276 P25/1277 P26/2437 to P25/2440 P26/2459 P27/1268 to P27/1273 P27/ |
| A43375 | 1995 | Acacia Resources Ltd | Balagundi South | 30% | Balagundi South Project, Annual Report P25/1110-1118 for the period !st October 1993 to 30th September 1994. |
| A43890 | 1995 | Atlantic Gold Nl | Boorara | <1% | Boorara Joint Venture Annual report period 1st January 1994 to 31st December 1994 Tenements M26/29 M26/318 M26 |
| A45662 | 1995 | Acacia Resources Ltd | Kanowna South | 12% | Kanowna South P25/1249-1252,P25/1276,1277,P26/2437-2440 P26/2459,P27/1268-1273,P27/1300.Annual report for the |
| A46485 | 1995 | Acacia Resources Ltd | Boorara | 20% | Boorara-Perkolilli-Kurramia Joint Venture P26/2185 to P26/2188 P26/2369 P26/2370 P26/1938 P26/1940 P26/2387 P2 |
| A46619 | 1995 | Acacia Resources Ltd | Balagundi South | 30% | Balagundi South Project, Annual Report for the period 1st October 1994 to 30th September 1995, P25/1110-1118 ( |
| A39875 | 1994 | Copperfield Gold Nl | Snake Hill | 16% | Annual Report for the period 01/01/93-31/12/93 Snake Hill Project P25/1225-1227 P26/2332-2340 P26/2343-2345 |
| A42156 | 1994 | Archaean Gold Nl | Boorara | 13% | Annual Report for the period 31/07/93-30/07/94 Boorara Project P26/1982-1983 |
| A42127 | 1994 | Delta Gold Ltd | Balagundi | <1% | Annual Report for the period 01/06/93-30/05/94 Balagundi Project P25/1073-1075,1184-1188,1190,1217-1218 |
| A42838 | 1994 | Acacia Resources Ltd | Boorara | 20% | Boorara-Perkolilli-Kurramia Joint Venture P26/2185 to P26/2188 P26/2369 P26/2370 P26/1938 to P26/1940 P26/2387 |
| A43097 | 1994 | Acacia Resources Ltd | Kanowna South | 14% | Kanowna South Project, P25/1249-52, P26/1276,1277,2437-2440,2459,P27/1268-1273,P27/1300 Annual Report for per |
| A44164 | 1994 | Delta Gold Ltd | North Balagundi | <1% | Annual Report on the Balagundi Project for the period 1st June 1994 to 30th May 1995 Tenements:M25/170,M25/99, |
| A38628 | 1993 | Ramsgate Resources Ltd | Mount Monger | <1% | Mount Monger Project, Annual Report (17 vols) for the period 01/05/1992 to 30/04/1993, E15/317-318;GML26/6912; |
| A38917 | 1993 | Delta Gold Ltd | Balagundi | <1% | Annual report on the West Balagundi Project, Stroud Option. 07/02/92-06/02/93. P25/1184-1185. |
| A37108 | 1992 | Cove Mining Nl | Balagundi South | 30% | Balagundi South Project, Annual Report for the period 01/06/ 1991 to 01/06/1992, P25/1110 - 25/1118. |
| A33912 | 1991 | Rgc Exploration Pty Ltd | Balagundi | 3.2% | Status report Balagundi project. M25/84. Bulong district, East Coolgardie Mineral Field, WA. 04/91. |
| A32849 | 1991 | Newmont Australia Ltd | Boorara | <1% | Annual Report for the Period 01/01/90 - 31/12/90 Boorara Joint Venture M26/29,318,161; GML26/6785 |
| A30826 | 1990 | Windsor Resources Nl | Boorara | <1% | Boorara Project. M26/29, M26/161, M26/6785, P26/850-858, P26/1180 and P26/1181 April 1990. Windsor Resources N |
| A27802 | 1988 | Paget Gold Mining Co Ltd | Balagundi | <1% | Balagundi Gold Project. Data review and re-interpretation. Annual report to 09/88. M25/15,54,68. P25/468. |
| A26128 | 1987 | Mr Tomlinson Id | Corsair | <1% | Pisolite/Laterite Sample project on corsair tenements: P27/900-902, P26/1461-1463 and P27/896-899. |
| A20942 | 1986 | Ms Roworth R | Boorara Hill | 25% | Report [annual] on Boorara Hill, 17 June 1986, P26/75, 26/254 |
| A13808 | 1984 | Mr Stroud R | Balagundi | 1.4% | Preliminary reconnaissance of mineral claims. MC25/1593-1595. Balagunda, WA. 11/83. |
| A11330 | 1982 | Texasgulf Australia Ltd | Balagundi | 90% | Balagundi Project, Non-statutory Report:Final Report , May 1982, GML25/1454. |
| A8946 | 1979 | Mr Black M | Boorara | <1% | Boorara Project, Non-statutory Report: Drill Core Samples, (Undated), MC26/1750 & 1751. |
| A5069 | 1974 | Australian Selection Pty Ltd | Corsair | <1% | Report [non-statutory] on the geology and exploration of the Corsair Claim Block, MC26//385 ... 26/919 |
| A5071 | 1974 | Western Nickel Pty Ltd | Corsair | <1% | Corsair, Annual report year ending 31st March 1974, MC26/685 ... MC26/919 |
| A5070 | 1974 | Western Nickel Pty Ltd | Corsair | 2.9% | Corsair, Report [non-statutory] for the period 1st January 1971 to March 1972, 1st April 1972 to 31st March 19 |
| A888 | 1971 | Australian Selection Pty Ltd | Corsair | 2.9% | Corsair Project, Annual Report for the period ending 31/12/1970, TR70/3734H; MC26/385-393, 670-694, 697-698, 7 |
| A884 | 1968 | Australian Selection Pty Ltd | Corsair | 3.9% | Corsair Project, Non-statutory Report: Report for Quarter ending 31st December 1968, TR70/3734h; MC26/385-393, |
| A883 | 1967 | Australian Selection Pty Ltd | Corsair | 3.9% | Corsair Project, Non-statutory Report: Report on Investigations during 1967, TR70/3734H; MC26/385-393,670-694, |
| A887 | 1967 | Australian Selection Pty Ltd | Corsair | 3.9% | Corsair Project, Non-statutory Report: Plans:- Grids; Magnetic Profiles; Ground Magnetics, August & September |
| A48172 | 1753 | Fimiston Mining Ltd | Boorara | <1% | Boorara Project WA Combined Annual Report Tenements: M26/161 M26/29, M26/318 period 15.3.95 to 15.3.96 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A42802 | 1753 | Copperfield Gold Nl | Snake Hill | 16% | Snake Hill Project Annual report for Prospecting Licences P25/1225 to P25/1227 P26/2332 to P26/2340 P26/2343 t |
| A45739 | 1753 | Archaean Gold Nl | Boorara | 13% | Boorara Project Annual Report 31.07.94 - 30.07.95 Prospecting Licence P26/1982-1983 |
| A46620 | 1753 | Copperfield Gold Nl | Snake Hill - Hampton | 16% | Snake Hill & Hampton Projects Golden Ridge district, Kalgoorlie W.A. Annual report on exploration activities P |
| A49679 | 1753 | New Hampton Goldfields Nl | Snake Hill - Hampton | 16% | Snake Hill & Hampton projects Golden Ridge district, Kalgoorlie W.A. Annual report on exploration activities P |
| A143969 | Csiro | 43% | Core Library Sampling Of Drillhole NBDH010 Under Samplng Approvals K562, P603 and K701 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 25/355 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 25/355? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-09. Compiled by NextMaps. Verify against primary sources before reliance.