M 26/532
M 26/532 is a live mining lease in the City of Kalgoorlie-Boulder, Western Australia, held by Northern Star (Klv) Pty Ltd and Northern Star (Saracen Kalgoorlie) Pty Ltd (part of Northern Star Resources Ltd). Granted on 19 Oct 2009 for 21 years, it expires on 18 Oct 2030. The ground is covered by 95 historical WAMEX reports.
Register summary
- Holders
- Northern Star (Klv) Pty Ltd, Northern Star (Saracen Kalgoorlie) Pty Ltd
- Part of
- Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 17 Nov 1995
- Commenced
- 19 Oct 2009
- Expiry
- 18 Oct 2030
- Term
- 21 Years
The full record on M 26/532
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 7 changes of holder
- The full record: 17 years of expenditure, 11 conditions and 2 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (11 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A122937 | 2020 | Horizon Minerals Limited | Teal | <1% | Annual Technical Report for C66/2009 for the period ending 31/12/2019 |
| A123836 | 2020 | Kalgoorlie Consolidated Gold Mines Pty Ltd Joint Venture | Fimiston | 2.8% | Fimiston Project C12/2000 Annual Report for the period ending 31/03/2020 |
| A123588 | 2020 | Horizon Minerals Limited | White Flag | <1% | White Flag C4/2017 Annual Report 1 Janaury 2019 to 31 December 2019 |
| A119523 | 2019 | Intermin Resources Limited | Binduli | <1% | Binduli Project C66/2009 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119896 | 2019 | Black Mountain Gold Limited | Teal | <1% | Teal Project P26/4056 Annual Report for the period 14 January 2018 to 13 January 2019 |
90 more reports
| A119913 | 2019 | Black Mountain Gold Limited | White Flag | <1% | White Flag C4/2017 Combined Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120364 | 2019 | Kalgoorlie Consolidated Gold Mines Pty Ltd Joint Venture | Fimiston | 2.8% | Fimiston Project C12/2000 Annual Report for the period 1 April 2018 to 31 March 2019 |
| A117067 | 2018 | Kalgoorlie Consolidated Gold Mines Pty Ltd Joint Venture | Fimiston | 2.3% | Fimiston Project C12/2000 Annual Report for the period 1 April 2017 to 31 March 2018 |
| A115799 | 2018 | Intermin Resources Limited; Black Mountain Gold Limited | Binduli | <1% | Binduli C66/2009 Combined Annual Report For the Period 1 January 2017 to 31 December 2017, M26/00346, M26/0049 |
| A116231 | 2018 | Evolution Mining (Mungari) Pty Ltd | White Flag | <1% | Annual Report White Flag Project C4/2017 for the period 1 January 2017 to 31 December 2017 |
| A116237 | 2018 | Black Mountain Gold Limited | Teal North East | <1% | Teal North East P26/4056 Annual Technical Report for the period 14 January 2017 to 13 January 2018 |
| A111943 | 2017 | Black Mountain Gold Ltd | Teal North East | <1% | Teal North East P26/04056 Annual Mineral Exploration Report for the period 14 January 2016 to 13 January 2017 |
| A112406 | 2017 | Black Mountain Gold Limited; Intermin Resources Ltd | White Flag | <1% | Annual Report on the White Flag Project C04/2017 For the Period 1 January 2016 to 31 December 2016, E24/00183. |
| A114131 | 2017 | Kalgoorlie Consolidated Gold Mines Pty Ltd Joint Venture | Fimiston | 2.3% | Fimiston Project C12/2000 Annual Exploration Report for the period 1 April 2016 to 31 March 2017 |
| A108300 | 2016 | Evolution Mining Pty Ltd | Binduli | <1% | Addendum to Previously Submitted Annual Report for the Combined Reporting Group (C66/2009) for the period 1 Ja |
| A108137 | 2016 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report 1 January 2015 to 31 December 2015 Binduli Project M26/346, M26/499, M26/621, M26/549 P |
| A109228 | 2016 | Kalgoorlie Consolidated Gold Mines Pty Ltd Joint Venture | Fimiston | 2.4% | Annual Report for the period 1 April 2015 to 31 March 2016, Fimiston Project, C12/2000 |
| A110228 | 2016 | Evolution Mining Limited | Binduli | <1% | P26/03989 Binduli – Peyes Farm Project Annual Report for the period 13/08/2015 to 12/08/2016 |
| A105676 | 2015 | Intermin Resources Ltd | Binduli | <1% | Binduli Project C66/2009 Combined Annual Report for the period 1 January 2014 to 31 December 2014, M26/346, M2 |
| A107217 | 2015 | Evolution Mining Pty Ltd | Binduli | <1% | BINDULI PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the period 13/08/2014 to 12/08/2015 |
| A105910 | 2015 | Kalgoorlie Consolidated Gold Mines Pty Ltd Joint Venture | Fimiston | 2.2% | Annual Report for the period 1 April 2014 to 31 March 2015, Fimiston Project, C12/2000, E26/124......P27/2039 |
| A101161 | 2014 | Intermin Resources Ltd | Binduli (Teal) Project | <1% | Annual Report for the period 01/01/2013 to 31/12/2013, Binduli (Teal) Project M26/346, M26/499, M26/621, M26/5 |
| A96158 | 2013 | Intermin Resources Ltd | Binduli | <1% | Binduli Project, Annual Report for the period 1st January 2012 to 31st December 2012, M26/346, 499, 549 & 621; |
| A98327 | 2013 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | 2.2% | ANNUAL REPORT FOR THE PERIOD 1st April 2012 to 31st March 2013 FIMISTON PROJECT C12/2000 |
| A92563 | 2012 | Intermin Resources Ltd | Binduli | <1% | Binduli Project Combined Annual Report 1 January 2011 to 31 December 2011, C66/2009, M26/346, 499, 621, 549, P |
| A94125 | 2012 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | 2.4% | Annual Report for the period 1st April 2011 to 31st March 2012 Fimiston Project C12/2000 |
| A89516 | 2011 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report, 1 January 2010 to 31 December 2010, Binduli Project M26/346, M26/499, M26/621, M26/54 |
| A90644 | 2010 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | 3% | Annual report for the period 1 April 2010 to 31 March 2011, Fimiston Project, C12/2000 |
| A85893 | 2010 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report 1 January 2009 to 31 December 2009 Binduli Project M26/346, M26/499, M26/621, M26/549 P |
| A86960 | 2010 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | 3.1% | Annual report for the period 1 April 2009 to 31 March 2010, Fimiston Project, C12/2000, M 26/27, 39, 40, 46, 5 |
| A81553 | 2009 | Intermin Resources Ltd | Abattoir South | <1% | Annual Report 1 January 2008 to 31 December 2008 Abattoir South Project M26/346*, M26/499*, M26/621, M26/549, |
| A83036 | 2009 | Kalgoorlie Consolidated Gold Mines Pty Ltd | FIMISTON | <1% | Annual Report for the Period 1 April 2008 to 31 March 2009, Fimiston Project, C12/2000, TENEMENT NUMBERS: M26/ |
| A78105 | 2008 | Intermin Resources Ltd | Abattoir South | <1% | Annual Report 2 March 2007 to 1 March 2008 Abattoir South Project M26/346, P26/1952, P26/2360, P26/2550, P24/3 |
| A78882 | 2008 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | <1% | ANNUAL REPORT FOR THE PERIOD 1st April 2007 to 31st March 2008 FIMISTON PROJECT C12/2000 |
| A75340 | 2007 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | <1% | Annual Report for Combined Reporting Group C12/2000 Fimiston Leases M26/19,27,39,40,46,54,56,58,60,61,etc, for |
| A74408 | 2007 | Barrick Gold Of Australia Ltd | Abbottoir South | <1% | Abattoir South Project C100/2004 Annual Report for the Period 01/01/2006 to 31/12/2006 Report No.1215 (Kalgoor |
| A72997 | 2006 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | <1% | Annual Report for Combined Reporting Group C12/2000, Fimiston Leases, For the Period 1st April 2005 to 31st Ma |
| A72021 | 2006 | Placer Dome Asia Pacific Ltd | Abattoir South | <1% | Abattoir South Project, Annual Report, 01/01/2005-31/12/2005 (C100/2004), E26/45, E26/53, E26/85, M26/115..... |
| A70006 | 2005 | Placer Dome Asia Pacific Ltd | Abbatoir South | <1% | Annual report for the period 01/01/04 - 31/12/04 Abbatoir South Project 8504, C100/2004, E26/45, E26/53, E26/8 |
| A70007 | 2005 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual report for the period 01/01/04 - 31/12/04 Binduli North Joint Venture Project 8504, C202/1995, E26/53, |
| A70697 | 2005 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | <1% | Annual report for combined reporting group C12/2000, Tenements M26/19, 27, 39, 40, 46, 54, 56, 58, 60, etc, Fi |
| A71063 | 2005 | Yilgarn Gold Ltd | Goodenough Mine | <1% | Goodenough Mine, M29/141, North Coolgardie mineral field, Menzies district, Annual technical report 2005 for t |
| A82885 | 2005 | Placer (Granny Smith) Pty Ltd | Binduli | <1% | Preliminary notes on results of Binduli North IP Surveys, Jan - Feb 2005 |
| A68414 | 2004 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Binduli North JV Pproject, Annual Report 01/01/2003- 31/12/2003 (C202/1995), P24/3296, P26/1949-52, P24/2136, |
| A68761 | 2004 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | <1% | Annual Report for combined reporting group C12/2000, Fimiston Leases, for the period 1st April 2003 to 31st Ma |
| A66499 | 2003 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual Report 01/01/2002-31/12/2002 Binduli North Project C202/1995: P26/1949-52, 2136, 2212-13, 2241-43, 2248 |
| A66778 | 2003 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | <1% | Annual Report for combined reporting group C12/2000, M26-27,39,40,46,56,58,60-61,78,81,83,86-87,95-86,113,120, |
| A82883 | 2003 | Placer Dome Asia Pacific Ltd | Binduli | <1% | Placer gravity Survey, December 2003, Survey Report |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | <1% | Kalgoorlie High Resolution Gravity Surveys. |
| A64371 | 2002 | Delta Gold Ltd | Binduli North | <1% | Annual Report 01/01/2001 to 31/12/2001. Binduli North Joint Venture C202/1995. Tenement/s P26/1949-1952, 2136, |
| A82890 | 2001 | Placer (Granny Smith) Pty Ltd | Kalgoorlie/ Teal | <1% | Sub-audio magnetics surveys, logistics and data processing report |
| A61668 | 2001 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | 1.3% | Annual Report for reporting group C366/1995 Boomerang Joint Venture, tenements P26/2525 - P26/2533, P26/2194, |
| A63636 | 2001 | Delta Gold Ltd | Binduli North | <1% | Binduli North Joint Venture Combined Annual Report 1st January 2000 to 31st December 2000. Tenements E26/53, |
| A59887 | 2000 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | 1.3% | Annual Report for Reporting Group C366/1995 Boomerang [JV] Tenements P26/2525-P26/2533,P26/2194,P26/2214,P26/2 |
| A59912 | 2000 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Horans Big Dam | 48% | Annual Report for the Tenement Group C174/1996, Horans Big Dam Project, for the Period 21/11/1998 to 20/11/199 |
| A60024 | 2000 | Delta Gold Ltd | Binduli North | <1% | Binduli North Joint Venture Combined Annual Report C202/1995 01/01/1999 to 31/12/1999 Tenements E26/53,M26/346 |
| A57127 | 1999 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Horans Big Dam | 48% | Annual Report for the Tenement Group C174/1996, Horans Big Dam Project, for the Period 21/11/1997 to 20/11/19 |
| A53703 | 1998 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Horans Big Dam | 48% | Annual Report for the Tenement Group C174/1996, Horans Big Dam Project, for the period 21/11/1996 to 20/11/19 |
| A53776 | 1998 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | 1.3% | Annual Report for the period 01/12/97-30/11/97 Reporting Group C366/1995 Boomerang Joint Venture Tenements P26 |
| A53911 | 1998 | Intermin Resource Corp Ltd | Binduli North | <1% | Binduli North - Project Area C202/1995 Annual Report 01/01/1997 - 31/12/1997 E26/53, M23/346, 446, P26/1949-19 |
| A55170 | 1998 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Horans Big Dam | 70% | Annual Report for the Tenement Group C174/1996, Horans Big Dam Project, for the Period 21/11/1996 to 20/11/19 |
| A56988 | 1998 | Intermin Resources Nl | Binduli North | <1% | Binduli North Project - East Coolgardie Mineral Field, East Coolgardie District 01/01/98 - 31/12/98 Mining L |
| A57126 | 1998 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | 1.3% | Annual Report - Boomerang Joint Venture 01/12/97 - 30/11/98 P26/2194, 2238, 2327, 2525-2527 |
| A50191 | 1997 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Horans Big Dam | 48% | Annual Report for the Tenement Group C174/1996, Horans Big Dam Project, for the period 21/11/1995 to 20/11/19 |
| A50255 | 1997 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | 1.3% | Annual report for the period 1 December 1995 to 30 November 1996 Tenement Group C366/1995 Boomerang Joint Vent |
| A50285 | 1997 | Pegasus Gold Australia Pty Ltd | Binduli North | <1% | Annual Technical Report Reporting period: 1 January to 31 December 1996 Binduli North Project Area Combined Re |
| A48083 | 1996 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Mount Percy | 14% | Annual report for tenement Group M6795/1a for the period 1st April 1995 to 31st March 1996 (Mount Percy North) |
| A47078 | 1996 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | 1.3% | Annual report for the period 1st December 1994 to 30th November 1995 Tenement Group C366/1995 Boomerang Joint |
| A47642 | 1995 | Intermin Resource Corp Ltd | Binduli North | <1% | Binduli North/North Peyes Farm Project Annual report for the period 1 January 1995 to 31 December 1995 for ten |
| A43633 | 1995 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | 1.6% | Annual report for the period 1st December 1993 to 30th November 1994 Boomerang Joint Venture |
| A44801 | 1995 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Mount Percy | 14% | Annual Report for Tenement Group M6792/1a, for the period 1st April 1994 to 31st March 1995. Kalgoorlie 1:250, |
| A40660 | 1994 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Boomerang | <1% | Technical report for the period March 1993 to 30 November 1993 for tenement group M2994 Boomerang Joint Ventur |
| A41561 | 1994 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Mount Percy | 17% | Annual report for the period 01/04/93-30/03/94 Mount Percy Project |
| A39316 | 1993 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Kalgoorlie - Eight Mile Dam - Horans Big | 15% | Technical Report for the Period 01/04/92 to 31/03/93 for Tenement Group M6792/1a (Kalgoorlie / Eight Mile Dam |
| A37203 | 1992 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Mount Percy/Fimiston | 20% | Technical report for the period 01/04/91-31/03/92 (KCGM Project M26/53 M26/60-61 M26/198 M26/261 P26/1988 P26/ |
| A37872 | 1992 | Border Resources Nl | Boomerang | <1% | (Boomerang Mining Lease: M26/141, 143, 232, 309 1978-1992) |
| A25873 | 1988 | Barrack Exploration Pty Ltd | Boomerang | <1% | Report on Boomerang Project, Field program, July 1988, E26/9, M26/141-142, M26/232 |
| A23433 | 1987 | Barrack Exploration Pty Ltd | Boomerang | <1% | Boomerang Project, Field programme August to September 1987, E26/9, M26/141-142 |
| A13715 | 1984 | Anaconda Aust Inc | Boomerang | <1% | Boomerang Project, Annual Report for the period ending 31/12/1983, MC26/1765-1770, 1825-1829, & 2017. |
| A12360 | 1983 | Anaconda Aust Inc | Boomerang | <1% | Boomerang Project, Annual Report for the period 01/01/1982 to 31/12/1982, MC26/1765-1770, 1825-1829, & 2017; G |
| A11145 | 1982 | Cra Exploration Pty Ltd | Peters Farm Dam | 33% | Peters Farm Dam Project, Non-statutory Report: Final Report for the period ending 26/05/1982, MC26/2047-2055. |
| A11190 | 1982 | Anaconda Aust Inc | Boomerang | <1% | Boomerang Project, Annual Report for the period ending 31/12/1981, MC26/1765-1776, 1825-1829,& 2017; GML26/772 |
| A10286 | 1981 | Cra Exploration Pty Ltd | Peters Farm Dam | 33% | Peters Farm Dam Project, Annual Report for the period 01/01/1980 to 31/12/1980, MC26/2047-2055. |
| A3511 | 1973 | Falconbridge Aust Pty Ltd | Horans Dam | 8.1% | Horans Dam Project, Annual Report for the year ending 31/12/1972, MC26/1256-1262, 1274-1279 & 1284. |
| A4531 | 1973 | Falconbridge Australia Pty Ltd | Horans Dam | 8.1% | Horans Dam Project, Annual Report for the period 01/11/1972 to 31/12/1973, MC26/1256-1262, 1274-1279, & 1283- |
| A2557 | 1971 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Kalgoorlie | 7.2% | Kalgoorlie Project, Final Surrender Report, April 1971, MC26/263-272, 312, 504, 522-531, 641-646, 745 & 867-87 |
| A3308 | 1969 | New Consolidated Gold Fields Aust Ltd | Kalgoorlie North | 10% | Kalgoorlie North Project, Non-statutory Report: Brief Exploration Report for the period 01/04/1969 to 31/07/19 |
| A648 | 1969 | New Consolidated Gold Fields Aust Ltd | Kalgoorlie | 7.4% | Kalgoorlie Project, Non-statutory Report:Report on Activities 1st April 1969 to 31st July 1969,TR70/2930,2931, |
| A3306 | 1968 | New Consolidated Gold Fields Aust Ltd | Kalgoorlie North | 10% | Kalgoorlie North Project, Non-statutory Report: Report on Schramm Drilling Programme for the period 01/12/1967 |
| A642 | 1968 | New Consolidated Gold Fields Aust Ltd | Kalgoorlie North | 10% | Kalgoorlie North Project, Non-statutory Report: Report on Schramm Drilling Programme, 11/12/1967- 30/01/ 1968, |
| A646 | 1968 | New Consolidated Gold Fields Aust Ltd | Kalgoorlie | 7.4% | Kalgoorlie Project, Final Surrender Report on Activities during 1968, MC24/25-27,109, 202-203; MC26/263-272, 5 |
| A3307 | 1968 | New Consolidated Gold Fields Aust Ltd | Kalgoorlie North | 10% | Kalgoorlie North Project, Non-statutory Report: Report on Stage 2 Operations including Schramm Drilling Progra |
| A102897 | 1753 | Kalgoorlie Consolidated Gold Mines Pty Ltd | Fimiston | 2.2% | Fimiston Project, Annual Report for the period 01/04/2013 to 31/03/2014, C12/2000. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A111942 | Intermin Resources Ltd | Binduli | <1% | C66/2009 Combined Annual Report Binduli Project for the period 1 January 2016 to 31 December 2016, M26/346, M2 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 26/532 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 26/532? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.