M 28/201
M 28/201 is a live mining lease in the City of Kalgoorlie-Boulder, Western Australia, held by Wellington Nickel Pty Ltd (part of Ardea Resources Limited). Granted on 27 Sept 2001 for 21 years (renewed), it expires on 26 Sept 2043. The ground is covered by 95 historical WAMEX reports.
Register summary
- Holder
- Wellington Nickel Pty Ltd
- Part of
- Ardea Resources Limited (ASX:ARL) as at 2025-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 25 Mar 1998
- Commenced
- 27 Sept 2001
- Expiry
- 26 Sept 2043
- Term
- 21 Years (Renewed)
The full record on M 28/201
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 5 changes of holder
- The full record: 27 years of expenditure, 17 conditions and 3 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (12 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148960 | 2025 | Minex (Aust) Pty Ltd | Kurnalpi | 8.8% | Final Surrender Report for the Kurnalpi Project (C73/2015) for thge period ending 15/4/2025 |
| A138330 | 2024 | Minex (Aust) Pty Ltd | Kurnalpi | 8.8% | Annual Report for the Kurnalpi Project (C73/2015) for the period ending 31/10/2023. |
| A139298 | 2024 | Northern Star Resources (Carosue Dam) Pty Ltd | Acra | 31% | Final Surrender Report on E28/2586, Acra Project, for the period 11 August 2016 to 31 January 2024.(C74/2004) |
| A127753 | 2021 | Carnavale Resources Limited | Grey Dam Project | 12% | Partial Surrender Report for E 28/2506 for the period ending 5 May 2021 |
| A122547 | 2020 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra project C74/2014 for the period 9 December 2018 to 8 December 2019 E 27/00278,E 27/00438,E 27/00491,E 27/ |
90 more reports
| A122881 | 2020 | Carnavale Resources Limited | Grey Dam | 8.8% | Grey Dam C73/2015 Annual Report for the period ending 31st October 2019, E28/02506, E28/02567, E28/02682, E28/ |
| A123158 | 2020 | Newmont Exploration Pty Ltd | Kalpini Hill | 1.4% | Combined Annual Report for C 57/2019 (Kalpini Hill Project) for the period 1st January 2019 to 31st December 2 |
| A118926 | 2019 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra Project C74/2004 Annual Report for the period 9 December 2017 to 8 December 2018, E27/00278, E27/00438, E |
| A122048 | 2019 | Ardea Resources Limited | Kalpini | 3.8% | Annual for the Kalpini Project C31/2002 for the period 27 September 2019 to 26 September 2019, E28/01224, M27/ |
| A118494 | 2018 | Mithril Resources Ltd | Kurnalpi | 11% | Annual Report for Kurnalpi Project C73/2015 for the period 1 November 2017 to 31 October 2018, E28/02506, P28/ |
| A115727 | 2018 | Mithril Resources Ltd | Kurnalpi | 11% | Annual Report for Kurnalpi Project C73/2015, E28/02506, P28/01271 for the period 1 November 2016 to 31 October |
| A117907 | 2018 | Newmont Exploration Pty Ltd | Kalpini Hill | 31% | Annual Report for E28/2586 (Kalpini Hill Project) for the period 11th August 2017 to 10th August 2018 |
| A118244 | 2018 | Ardea Resources Limited | Kalpini | 3.9% | Kalpini C31/2002 Annual Report for the period 27 September 2017 to 26 September 2018, E28/01224, M27/00395, M2 |
| A115507 | 2017 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra Project Annual Technical Report, C74/2004 for the period 09/12/2016-08/12/2017, E27/00278, E28/01746, E27 |
| A110744 | 2017 | Mithril Resources Ltd | Kurnalpi | 11% | ANNUAL REPORT For the Period 1 November 2015 to 31 October 2016 Kurnalpi Project |
| A111857 | 2017 | Heron Resources Ltd | Kalpini | 3.9% | C31/2002 Kalpini Annual Report 2015 - 2016 |
| A112095 | 2017 | Pioneer Resources Limited | Acra | <1% | Combined Annual Report for the Acra Project C74/2004 (E27/278, E27/438, E27/491, E27/520, E27/548, E28/1746 & |
| A114896 | 2017 | Newmont Exploration Pty Ltd | Kalpini Hill | 31% | Annual Report for Kalpini Hill Project (E28/2586) for the period 11th August 2016 to 10th August 2017 |
| A115441 | 2017 | Ardea Resources Limited | Kalpini | 3.9% | Kalpini Project C31/2002 Annual Report For the Period 27 September 2016 to 26 September 2017, E28/01224, M27/0 |
| A107801 | 2016 | Mithril Resources Ltd | Kurnalpi | 11% | C73/2015 Kurnalpi Project, E28/2506 and P28/1271, Year 1 Combined Annual Report for the period 1 November 2014 |
| A107827 | 2016 | Heron Resources Ltd | Kalpini | 3.3% | Combined Annual Report for the period 27 September 2014 to 26 September 2015, Kalpini Nickel Project, C31/2002 |
| A108162 | 2016 | Pioneer Resources Limited | Acra | <1% | Combined Annual report for the Acra Project, C74/2004 (E27/278, E27/438, E27/491, E27/520, E28/1746 & P28/1120 |
| A108259 | 2016 | Pioneer Resources Limited | Binti South | 2% | Partial Surrender Report for the Binti South project, E27/520, for the period 21 January 2014 to 20 January 20 |
| A104732 | 2015 | Pioneer Resources Ltd | Acra | <1% | Combined Annual Report for the Acra Project C74/2004 (E27/273, E27/278, E27/438, E27/482, E27/491, E27/520, E2 |
| A106460 | 2015 | Kalnorth Gold Mines Limited | Kurnalpi | 1.7% | ANNUAL REPORT, For the Period 14 April 2014 to 13 April 2015, KURNALPI, Kurnalpi Project [C101/2011] |
| A101345 | 2014 | Pioneer Resources Ltd | Acra | <1% | Acra Project C74/2004 E27/273, E27/278, E28/1746, E28/2109, P28/1120 Combined Annual Report for the period 9 D |
| A101779 | 2014 | Pioneer Resources Ltd | Jubilee | <1% | JUBILEE PROJECT E28/1746 North East Coolgardie Mineral Field Partial Surrender Report for the period 20 Februa |
| A103481 | 2014 | Kalnorth Gold Mines Ltd | Kurnalpi | 1.7% | Combined Annual report for the period ending 13 April 2014, C101/2011, Kurnalpi Project E28/1477...P28/1255 |
| A104147 | 2014 | Heron Resources Ltd | Kalpini | 4.1% | Kalpini Project, Annual Report for the period 27/09/2014 to 26/09/2014, E28/1224; M27/395; M28/199, 201 & 205. |
| A98422 | 2013 | Kalnorth Gold Mines Ltd | Kurnalpi | 1.4% | Annual report for the period ending 13 April 2013, Kurnalpi Project, C101/2011 for the period 14 April 2012 – |
| A96975 | 2013 | Pioneer Resources Ltd | Acra | <1% | Combined Annual report for the Acra Project, C74/2004 (E27/273, E27/278, E28/1746, E28/2109 & P28/1120), North |
| A99848 | 2013 | Heron Resources Ltd | Kalpini | 4.1% | Combined annual report for the period 27 September 2012 to 26 September 2013, Kalpini Nickel Project, C31/2002 |
| A95851 | 2012 | Heron Resources Ltd | Kalpini | 4.1% | Combined annual report for the period 27 September 2011 to 26 September 2012, Kalpini Nickel Project, C31/2002 |
| A94230 | 2012 | Carrick Gold Ltd | Kurnalpi | 1.5% | Annual Report for the period 14 April 2011 to 13 April 2012, Kurnalpi Project, C101/2011 Kurnalpi |
| A89850 | 2011 | Xstrata Nickel Australasia Operations Pty Ltd | Acra Joint Venture | <1% | Acra Joint Venture Project, Combined Annual Report for E27/273, E27/278, E28/1223, E28/1746 and P28/1120, Ref: |
| A89139 | 2011 | Heron Resources Ltd | Kalpini | 3.5% | Combined annual report for the period 27 September 2009 to 26 September 2010, Kalpini Nickel Project, C31/2002 |
| A91068 | 2011 | Carrick Gold Ltd | Kurnalpi | <1% | Kurnalpi Project Annual Mineral Exploration Report E28/1786 for the period 21st April 2010 - 20th April 2011 |
| A92182 | 2011 | Pioneer Resources Ltd | Acra | 3.1% | Surrender report for the Acra Project, E28/1223, North East Coolgardie Mineral Field, for the period 6 Novembe |
| A93259 | 2011 | Xstrata Nickel Australasia Operations Pty Ltd | Acra | <1% | Acra (JV) Project, Annual Report for the period 9th December 2010 to 8th December 2011, E27/273, 278; E28/1223 |
| A85941 | 2010 | Pioneer Resources Ltd | Acra Joint Venture | <1% | ACRA JOINT VENTURE PROJECT C74/2004 (E27/273, E27/278 and E28/1223, E28/1746 and P28/1120) ANNUAL TECHNICAL RE |
| A87459 | 2010 | Condor Nickel Ltd | Acra North – Kurnalpi | <1% | E28/1786: Annual Report for the period 21 April 2009 to 20 April 2010 |
| A85025 | 2009 | Heron Resources Ltd | Kalpini | 1.5% | Kalpini Nickel Project, C31/2002, Combined annual report for the period 27 September 2008 to 26 September 2009 |
| A81641 | 2009 | Pioneer Nickel Ltd | ACRA JOINT VENTURE | <1% | ACRA JOINT VENTURE PROJECT C74/2004 (E27/273, E27/278 and E28/1223, E28/1746 and P28/1120) ANNUAL TECHNICAL RE |
| A82192 | 2009 | Vale Inco Australia Limited Partnership | KALPINI | <1% | KALPINI NICKEL PROJECT, TENEMENT: P28/983, COMBINED ANNUAL AND FINAL SURRENDER REPORT, FOR THE PERIOD 11 MAY 2 |
| A82501 | 2009 | Vale Inco Australia Limited Partnership | KALPINI | <1% | KALPINI NICKEL PROJECT C31/2002 TENEMENT: E28/1224 PARTIAL SURRENDER REPORT 20 APRIL 2005 – 19 APRIL 2009 |
| A83081 | 2009 | Carrick Gold Ltd | Kurnalpi | <1% | E28/1786 Annual Report for period 21 April 2008 to 20 April 2009 |
| A77950 | 2008 | Inco Australia Ltd | Kalpini | <1% | Kalpini Project, Partial Surrender Report for the period 20th April 2005 to 27th March 2008, E28/1224. |
| A77402 | 2008 | Jubilee Mines Nl | Acra Joint Venture | <1% | Acra Joint Venture Project Technical Report for the work car ried out by Jubilee Mines NL on E28/273, 278 and |
| A80185 | 2008 | Vale Inco Australia Limited Partnership | Kalpini | 1.6% | KALPINI NICKEL PROJECT, COMBINED ANNUAL REPORT – C31/2002 27 SEPTEMBER 2007 – 26 SEPTEMBER 2008 |
| A74026 | 2007 | Inco Australia Ltd | Kalpini | 2.7% | Kalpini Nickel Project Combined Annual Report C31/2002, 27 September 2005 to 26 September 2006, (Kurnalpi). |
| A74549 | 2007 | Jubilee Mines Nl | Acra | 3% | Acra Joint Venture Project C74/2004 Technical Report for the work carried out by Jubilee Mines N L on E28/1223 |
| A76729 | 2007 | Inco Australia Ltd | Kalpini | 1.7% | KALPINI NICKEL PROJECT, C31/2002, COMBINED ANNUAL REPORT 27 SEPTEMBER 2006 - 26 SEPTEMBER 2007 TENEMENTS: E2 |
| A72036 | 2006 | Sir Samuel Mines Nl | Acra JV | 3% | Acra Joint Venture Project, Technical Report on E28/1223, P28/972,979,991,1013, Period 9 December 2004 to 8 De |
| A73150 | 2006 | Heron Resources Ltd | Wellington North | <1% | Wellington North Project E28/1224, Annual Report, 20 April 2005 to 19 April 2006, (Kurnalpi). |
| A73238 | 2006 | Heron Resources Ltd | Kalpini | 32% | Kalpini Nickel Project M28/127,199,201,205, Combined Annual Report C31/2002, 27 September 2004 to 26 September |
| A73875 | 2006 | Heron Resources Ltd | Acra East | <1% | Acra East Project P28/1000, Annual Report, 14 September 2004 to 13 September 2006, (Kurnalpi). |
| A69846 | 2005 | Heron Resources Ltd | Kalpini | 32% | Combined annual report for the period 27/09/03 - 26/09/04 Kalpini Nickel Project, C31/2002, M28/127, M28/199, |
| A70280 | 2005 | Pioneer Nickel Ltd | Acra | 1.9% | Acra Project , Annual Report for the period 9th December 2003 to 8th December 2004, E28/1055, 1058, 1059, 122 |
| A68598 | 2004 | Pioneer Nickel Ltd | Acra | 3.1% | Annual Report 6th November 2003 to 5th November 2003 Acra Prospect E28/1223 |
| A66019 | 2002 | Heron Resources Ltd | Kalpini | 32% | Combined Annual Report - C31/2002 27 September 2001 - 26 September 2002 Kalpini Nickel Project Acra North & We |
| A59896 | 2000 | Mining Project Investors Pty Ltd | Pineapple Dam | <1% | Annual Report, E28/568,E28/569,E28/621,M28/80, M28/81,M28/85,P28/823, Pineapple Dam Project , for the year en |
| A57274 | 1999 | Heron Resources Ltd | Pineapple Dam | <1% | Pineapple Dam Project, E28/568 E28/569 E28/621 M28/80 M28/81 M28/85 P28/823 , Annual Report for 01/01/98-31/12 |
| A58431 | 1999 | Heron Resources Ltd | Kalpini | 1.9% | Kalpini Project Exploration Licences 27/76,129,170,426 & 459 Prospecting Licences 27/1448 to 1453 North East C |
| A59373 | 1999 | Mining Project Investors Pty Ltd | Pineapple Dam | <1% | Partial Surrender Report E28/568, Pineapple Dam Project, for the period 23rd January 1995 to 14th July 1999. |
| A53841 | 1998 | Fodina Minerals Pty Ltd | Acra | 2.8% | Annual Technical Report E27/76 and E28/426, Acra Project, Western Australia, For the Period 1 January 1997 to |
| A54039 | 1998 | Anvil Mining Nl | Pineapple Dam | <1% | Partial Surrender Report E28/568 Pineapple Dam Project ,Western Australia, for period 23rd January 1995 to 22 |
| A54038 | 1998 | Anvil Mining Nl | Pineapple Dam | <1% | Annual Report , Pineapple Dam Project, for the year ending 31/12/1997, E28/568, 569, 621, M28/80, 81, 85, P28/ |
| A50395 | 1997 | Fodina Minerals Pty Ltd | Acra | 4.5% | Acra Project, Partial Surrender Report E28/426 . |
| A50943 | 1997 | Mining Project Investors Pty Ltd | Pineapple Dam | <1% | Annual Report , E28/568 E28/569 E28/621 M28/80 M28/81 M28/85 & P28/823, Pineapple Dam Project, for the year e |
| A50946 | 1997 | Mining Project Investors Pty Ltd | Acra | 2.8% | Acra Project, Annual Report E27/76 & E28/426 for the period 14th October 1995 to 31st December 1996. |
| A47398 | 1996 | Anvil Mining Nl | Kurnalpi | <1% | Kurnalpi Project, Annual report for the period 01 January 1995 to 31 December 1995,E28/568 E28/569 E28/621; M2 |
| A45827 | 1995 | Kkr Resources Nl | Kurnalpi | <1% | Kurnalpi Project, Non-statutory Report :Exploration Report , July 1995, E28/568-569; M28/80-81 & 85; P28/283. |
| A46297 | 1995 | Fodina Minerals Pty Ltd | Kalpini | 4.5% | Kalpini Project, Annual Report Exploration Licence E28/426 (Acra) for the year ending 13th October 1995. |
| A42047 | 1994 | Artrayu Investments Pty Ltd | Lake Yindarlgooda | 1.3% | Surrender Report for the period ending 20/06/94, Lake Yindarlgooda Project, E28/463 E28/505 |
| A43261 | 1994 | Capital Energy Nl | Kalpini | 4.5% | Kalpini Project, Annual Report Exploration Licence E28/426 for the period 14th October 1993 to 13th October 19 |
| A41357 | 1993 | Normandy Poseidon Ltd | Kalpini | 4.5% | Kalpini Project, Annual report on exploration operations for the year ending 13 December, 1993 Exploration li |
| A10402 | 1981 | Western Mining Corporation Ltd | Jubilee -Wellington | 21% | Jubilee - Wellington Project, Non-statutory Report:Terminal Report for the period 16th July 1979 to 1st Decemb |
| A7182 | 1977 | Amax Exploration Aust Inc | Kalpini | <1% | Kalpini Project, Non-statutory Report: Final Report, August 1977, MC28/1250-1264. |
| A7380 | 1977 | International Nickel Aust Ltd | Kalpini Dam | <1% | Kalpini Dam Project, Non-statutory Report: Final Report for the year ending 03/06/1977, MC 28/2329-2342. |
| A6545 | 1976 | International Nickel Aust Ltd | Kalpini Dam | <1% | Kalpini Dam Project, Annual Report for the year ending 31/12/1975, MC28/2329-2342. |
| A4721 | 1974 | Carpentaria Exp Co Pty Ltd | Jubilee North | 38% | Jubilee North Project, Non-statutory Report: Final Report , February 1974, MC28/2213-2214 & 2228-2233. |
| A4697 | 1974 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Cowarna I. P. Survey : Lines 158N-164N, 156N-192N ( No 3 Sill)., |
| A3543 | 1973 | Jododex Australia Pty Ltd | North Jubilee - Kurnalpi | 16% | North Jubilee - Kurnalpi Project, Annual Report for the year ending 31/12/1972, MC28/4-6, 673-674, 674-676 1 |
| A4492 | 1972 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Summary Report, December 1972. |
| A2430 | 1972 | Jododex Australia Pty Ltd | North Jubilee | 25% | North Jubilee Project, Non-statutory Report: Exploration Report for the period ending 31/12/1971, MC28/4-6, 12 |
| A3031 | 1972 | Jones Mining Nl | Jubilee North | 8.2% | Jubilee North Project, Annual Report for the period ending 31/12/1971, MC28/4-6, 175, 672-682, 775-781,791-793 |
| A4696 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: ( No 1 Sill), Percussion Logs & Drill Hole Sections, 1970/1971. |
| A4698 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: I. P. Lines 60N-92N & 128N-174N, to January 1971. |
| A4693 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: No 3 Sill, Drill Holes & Logs, November 1970, |
| A4695 | 1970 | Great Boulder Mines Ltd | Cowarna Rocks | <1% | Cowarna Rocks Project, Non-statutory Report: Drill Holes & Logs, ( No 2 Sill) for the year ending 31/12/1970. |
| A13141 | 1970 | Newmont Holdings Pty Ltd | Jubilee | 34% | Report on Exploration of the Jubilee Prospect Kalgoorlie, Western Australia |
| A1273 | 1969 | Newmont Pty Ltd | North Jubilee | 34% | North Jubilee Project, Annual Report for the year ending 31st December 1968, MC28/4-6 |
| A158 | 1969 | Newmont Proprietary Limited | Jubilee North | 34% | Jubilee North Project, Non-statutory Report: Geological Report, June 1969, MC28/4-6 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A75103 | 1753 | Inco Australia Ltd | Kalpini | <1% | Kalpini Nickel Project, Tenement: P28/983, North East Coolgardie Mineral Field, Annual Report for the Period 1 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 28/201 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.