M 31/219
M 31/219 is a live mining lease in the Shire of Menzies, Western Australia, held by Northern Star (Carosue Dam) Pty Ltd (part of Northern Star Resources Ltd). Granted on 15 July 1999 for 21 years (renewed), it expires on 14 July 2041. The ground is covered by 107 historical WAMEX reports.
Register summary
- Holder
- Northern Star (Carosue Dam) Pty Ltd
- Part of
- Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
- Local government
- Shire of Menzies
- Application received
- 24 Jan 1997
- Commenced
- 15 July 1999
- Expiry
- 14 July 2041
- Term
- 21 Years (Renewed)
The full record on M 31/219
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 8 changes of holder
- The full record: 28 years of expenditure, 76 conditions and 3 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (36 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A124728 | 2020 | Saracen Gold Mines Pty Limited | Carouse Dam | 4.7% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020 |
| A124898 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project Exploration Licences 31/1058 & 31/1059 Partial Surrender Report for the Period 19 June 2016 t |
| A124900 | 2020 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2019 to 2 July 2020, E 31/00814,E 31/01058,E 31 |
| A120911 | 2019 | Saracen Gold Mines Pty Limited | Carosue Dam | 4.7% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019 |
| A121190 | 2019 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2018 to 2 July 2019, E31/00814, E31/01058, E31/ |
102 more reports
| A117528 | 2018 | Saracen Gold Mines Pty Limited | Carosue Dam | 4.5% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018 |
| A117824 | 2018 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2017 to 2 July 2018, E31/00814, E31/01058, E31/ |
| A114597 | 2017 | Saracen Gold Mines Pty Limited | Carosue Dam | 4.5% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202 |
| A114787 | 2017 | Saracen Gold Mines Pty Limited | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2016 to 2 July 2017, E31/00721, E31/00814, E31/ |
| A109933 | 2016 | Saracen Gold Mines Pty Ltd | Carosue Dam | 4.6% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A109981 | 2016 | Saracen Gold Mines Pty Ltd | Yilgangi | <1% | Yilgangi Project (C7/2016) Annual Report for the Period 3 July 2015 to 2 July 2016, E31/00721, E31/00814, E31/ |
| A106812 | 2015 | Saracen Gold Mines Pty Ltd | Mulgabbie West | <1% | Mulgabbie West Project (C117/1999) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/1009, M28/241 |
| A106872 | 2015 | Saracen Gold Mines Pty Ltd | Carosue Dam | 11% | Carosue Dam Project (C064/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E28/1747, M28/166, M |
| A106912 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam (C065/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/586, E31/741, E31/105 |
| A103198 | 2014 | Cazaly Resources Ltd | Carosue Dam | <1% | E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014 |
| A103508 | 2014 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.7% | Mulgabbie West Project Annual Report, 1 July 2013 to 30 June 2014, C117/1999; E31/796, E31/1009, M28/241, M28 |
| A103536 | 2014 | Saracen Gold Mines Pty Ltd | Carosue Dam | 11% | Carosue Dam Project C64/2001 Annual Report for the period 01/07/2013 to 30 June 2014, E28/1747, M28/166, M28/1 |
| A103510 | 2014 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 1 July 2013 to 30 June 2014, C65/2001, E31/586, E31/741, M31/156, M31/2 |
| A100147 | 2013 | Cazaly Resources Ltd | Carosue Dam | <1% | E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013 |
| A99440 | 2013 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.6% | Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009 |
| A99441 | 2013 | Saracen Gold Mines Pty Ltd | Carosue Dam | 9.5% | Carosue Dam Project C64/2001Annual Report for the period 1 July 2012 to 30 June 2013 E28/828, E28/1747, M28/16 |
| A99470 | 2013 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2012 to 30 June 2013, C65/2001, E31/586, E31/741, M |
| A95130 | 2012 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.7% | Mulgabbie West Project Annual Report 1 July 2011 to 30 June 2012, C117/1999, E31/796, M28/241, 243, 266, 269, |
| A95372 | 2012 | Saracen Gold Mines Pty Ltd | Carosue Dam Prroject | 6.7% | CAROSUE DAM PROJECT, ANNUAL REPORT, C064/2001 01 JULY 2011 TO 30 JUNE 2012 |
| A95050 | 2012 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/ |
| A95128 | 2012 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report for the period 1 July 2011 to 30 June 2012, C65/2001, E31/586, 741, M31/1 |
| A91960 | 2011 | Cove Resources Limited | Carosue Dam | <1% | Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31 |
| A91293 | 2011 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.7% | Mulgabbie West Project C117/1999 Annual Report for the period 1 July 2010 to 30 June 2011 E31/796, M28/241, M2 |
| A91632 | 2011 | Saracen Gold Mines Pty Ltd | Carosue Dam | 6.7% | Carosue Dam Project C64/2001 annual report for the period 1 July 2010 to 30 June 2011, E28/828, E28/1747, E31/ |
| A91511 | 2011 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project C065/2001 Annual Report 01 July 2010 to 30 June 2011, E31/586, 741, M31/156, 208, 209, |
| A87089 | 2010 | Saracen Gold Mines Pty Ltd | E31/796 | 6.8% | E31/796 PARTIAL SURRENDER REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2010 |
| A78705 | 2008 | Saracen Gold Mines Pty Ltd | Mulgabbie | 6.8% | E31/796 ANNUAL REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2008 |
| A79782 | 2008 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3 |
| A79749 | 2008 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.9% | ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR Group C117/1999 |
| A76575 | 2007 | Saracen Gold Mines Pty Ltd | Carosue Dam | 23% | Carosue Dam Project Annual Report 01 July 2006 to 30 June 2007 CR GROUP: C064/2001 M28/166, M28/167, M28/168, |
| A76717 | 2007 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.6% | MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C117/1999 |
| A76674 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1 |
| A73246 | 2006 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.6% | Mulgabbie West Project Annual Report, 01 July 2005 to 30 June 2006, E28/553,605-606, CR Group: C117/1999, P2 |
| A73245 | 2006 | Saracen Gold Mines Pty Ltd | Carosue Dam | 23% | Carosue Dam Project M28/166-168,M31/219-220, Annual Report, 01 July 2005 to 30 June 2006, Combined Reporting N |
| A73244 | 2006 | Saracen Gold Mines Pty Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21 |
| A70893 | 2005 | St Barbara Mines Ltd | Carosue Dam | 23% | Carosue Dam Project, Annual report for the period 01 July 2004 - 30 June 2005 (C64/2001, M28/166-168, M31/219- |
| A70985 | 2005 | St Barbara Mines Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10 |
| A68975 | 2004 | Sons Of Gwalia Ltd | Old Plough Dam | <1% | Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E |
| A69009 | 2004 | Sons Of Gwalia Ltd | Carosue Dam | 23% | Carosue Dam Project, Annual report for the period 1 July 2003 to 30 June 2004 (C64/2001), M28/166-168, M31/219 |
| A68963 | 2004 | Sons Of Gwalia Ltd | Mulgabbie West | 2.2% | Annual report for the period 01/07/2003-30/06/2004 Mulgabbie West Project (C117/1999), E28/553, E28/605-607 E |
| A67009 | 2003 | Sons Of Gwalia Ltd | Carosue Dam | 23% | Carusoe Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003, C64/2001: M28/166-168, M31/219- |
| A67254 | 2003 | Sons Of Gwalia Ltd | Old Plough Dam | 1.5% | Old Plough Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003 C65/2001: Tenements: M31/208 |
| A66653 | 2003 | Sons Of Gwalia Ltd | Mulgabbie West | <1% | Mulgabbie West Project, Annual Report for the period 21 February 2002 - 20 February 2003, E28/553. |
| A67103 | 2003 | Sons Of Gwalia Ltd | Mulgabbie West | 7.8% | Annual Report for the period 1 July 2002 to 30 June 2003 Mulgabbie West Project C117/1999: E28/605-606, P28/93 |
| A65429 | 2002 | Sons Of Gwalia Ltd | Carosue Dam | 23% | Carosue Dam Project Area M28/166-168, M31/219, M31/220 2001/02 Annual Report For Period 01/07/01 To 30/06/02 G |
| A65553 | 2002 | Sons Of Gwalia Ltd | Old Plough Dam | 1.5% | Old Plough Dam Project Area 2001/02 Annual Report For Period 01/07/01 To 30/06/02 Group Reporting No. C65/2001 |
| A65074 | 2002 | Sons Of Gwalia Ltd | Mulgabbie | <1% | Mulgabbie West Project Area E28/553 2001/02 Annual Report For Period 21/02/01 to 20/02/02 North East Coolgardi |
| A65554 | 2002 | Sons Of Gwalia Ltd | Mulgabbie West | 7.8% | Mulgabbie West Project Area E28/605, E28/606, E28/930-939, P31/1482, P31/1541, P31/1542, P31/1545. 2001/02 Ann |
| A63381 | 2001 | Pacmin Mining Corporation Ltd | Carosue Dam | 23% | 2000/01 Annual Report Carosue Dam Minesite M28/166 - 168, M31/219, M31/220 Combined Report For Period 01/07/00 |
| A63389 | 2001 | Pacmin Mining Corporation Ltd | Mulgabbie West | 25% | 2001 Partial Relinquishment Report E28/606 report for period 30/04/97 to 29/04/01 North East Coolgardie Minera |
| A63652 | 2001 | Sons Of Gwalia Ltd | Old Plough Dam | 1.5% | 2000/01 Annual Report Old Plough Dam Project Area E31/101, E31/107, E31/150, E31/152, E31/153 combined report |
| A62606 | 2001 | Pacmin Mining Corporation Ltd | Mulgabbie | <1% | Mulgabbie Project, 2000/01 Annual Report E28/553 Report For Period 21/02/00 to 20/02/01. |
| A63382 | 2001 | Pacmin Mining Corporation Ltd | Carosue Dam | 7.8% | 2000/2001 Annual Report, Carosue Dam Project Area, E28/605, E28/606, P28/930-P28/939, P31/1482, P31/1541, P31/ |
| A60506 | 2000 | Pacmin Mining Corporation Ltd | Yindi | 25% | 1999/2000 Annual Report P28/606 Report for Period 30/04/1999 to 29/04/2000 North East Coolgardie Mineral Field |
| A60513 | 2000 | Pacmin Mining Corporation Ltd | Yindi | <1% | 1999/2000 Annual Report P31/1541 Report for Period 10/03/1999 to 09/03/2000 North Coolgardie Mineral Field Wes |
| A60970 | 2000 | Paddington Gold Pty Ltd | Keith Kilkenny - Old Plough Dam | 1% | Annual Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/107,152,150,101,153,184 for the Period 1st Jul |
| A60972 | 2000 | Goldfields Exploration Pty Ltd | Jessie Dam - Old Plough Dam | <1% | Jessie Dam - Old Plough Dam Project, Partial Surrender Report for the period ending 30/04/2000, E31/107. [C65/ |
| A60052 | 2000 | Pacmin Mining Corporation Ltd | E28/553 | <1% | 1999/2000 Annual Report, E28/553, Report for Period 21/02/1999 to 20/02/2000, North East Coolgardie Mineral Fi |
| A61062 | 2000 | Pacmin Mining Corporation Ltd | Carosue Dam | 14% | 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482, |
| A58869 | 1999 | Goldfields Exploration Pty Ltd | Keith Kilkenny | 1% | Annual report, Keith Kilkenny Joint Venture Old Plough Dam, Tenements E31/101,E31/107,E31/150,E31/152,E31/153, |
| A57854 | 1999 | Pacific Mining Corporation Ltd | Mulgabbie West | <1% | Mulgabbie West (JV)Project, Annual Report for the period 21/02/98 - 20/02/99, E28/553. |
| A54118 | 1998 | Aberfoyle Resources Ltd | Mulgabbie West | <1% | Mulgabbie West (JV) Project, , E28/553 , Annual Report for the period 20/02/97 - 19/02/98. |
| A56173 | 1998 | Heron Resources Ltd | Mulgabbie | 8.2% | Mulgabbie Project, Annual Report for the period 29/08/1997 to 28/08/1998 , P28/930-939,1482 & 1541-1542; E28/6 |
| A53474 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 1.3% | E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report |
| A53547 | 1998 | Goldfields Exploration Pty Ltd | Jessie Dam | <1% | Jessie Dam Project, Partial Surrender Report, January 1998, E31/107. (Keith Kilkenny Joint Venture- Old Plough |
| A55388 | 1998 | Goldfields Exploration Pty Ltd | Keith Kilkenny | <1% | Keith Kilkenny(JV) Project, Annual Report for the period 01/07/1997 to 30/06/1998, E28/444; E31/101, 107, 150, |
| A55664 | 1998 | Heron Resources Ltd | Mulgabbie West | 25% | Mulgabbie West Project, Mulgabbie Prospect, Annual Report North East Coolgardie Mineral Field, Exploration Lic |
| A56172 | 1998 | Heron Resources Ltd | Mulgabbie West | 25% | Mulgabbie West Project - Mulgabbie Prospect North East Coolgardie Mineral Field, 29/07/97 - 28/07/98 Explorat |
| A56807 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 1.6% | E28/372 Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam Annual Report 07/12/97 - 06/12/98 |
| A50042 | 1997 | Aberfoyle Resources Ltd | Kurnalpi | 1.3% | Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t |
| A50030 | 1997 | Zephyr Minerals Nl | Mulgabbie West | <1% | E28/553 ,Annual Report, Mulgabbie West Project for the period ending 20/02/97. |
| A51944 | 1997 | Goldfields Exploration Pty Ltd | Keith Kilkenny- Old Plough Dam | <1% | Keith Kilkenny (JV)- Plough Dam Project,Annual Report for the period 1 July 1996 to 30 June 1994, E28/444, E |
| A46680 | 1996 | Cra Exploration Pty Ltd | Kurnalpi East | 1.1% | Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas |
| A48713 | 1996 | Goldfields Exploration Pty Ltd | Keith Kilkenny JV | <1% | Annual Report Keith Kilkenny Joint Venture Old Plough Dam E28/444, E28/101, E28/107, E28/150, E28/152, E28/153 |
| A45752 | 1995 | Goldfields Exploration Pty Ltd | Old Plough Dam | <1% | Annual Report Old Plough Dam Project E31/101,E31/107,E28/444 ,E31/150,E31/152,E31/153,P31/1471-72,E31/184 |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | 1% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A41598 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 1.2% | First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 1% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A42513 | 1994 | Pancontinental Mining Ltd | Keith Kilkenny | 1.2% | Keith Kilkenny Project, Annual Report for the period 29th June 1993 to 30th June 1994, C/R65/2001: Old Plough |
| A39118 | 1993 | Pancontinental Mining Ltd | Keith Kilkenny | 1.2% | Keith Kilkenny (JV) Project, Annual Report for the period 29th June 1992 to 30th June 1993, E31/101, 107,150,1 |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 1% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 1% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A36819 | 1992 | Pancontinental Mining Ltd | Keith Kilkenny | <1% | Annual Report for the period 17 June 1991 to 16 June 1992, Keith Kilkenny JV Project, E31/101 (Old Plough Dam) |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A24912 | 1988 | Auralia Resources Nl | Ellis Dam | 4.4% | Ellis Dam project. North East Coolgardie Mineral Field. Annual report on E28/49 for the year ended 12/7/88 |
| A21421 | 1987 | Freeport Of Australia Inc | Ellis Dam | 4.4% | Ellis Dam - Annual report for 1987 12-7-86 to 11-7-87 Exploration Licence 28/49 Vol 1 |
| A18735 | 1986 | Freeport Of Australia Inc | Ellis Dam | 4.4% | Ellis Dam- Annual Report for 1986, 12/7/85 to 12/7/86; Exploration Licence 28/49. |
| A16042 | 1985 | Freeport Of Australia Inc | Ellis Dam | 4.4% | Ellis Dam- Annual Report for 1985 (12/7/84 - 11/7/85). Exploration Licence 28/49. |
| A14349 | 1984 | Freeport Of Australia Inc | Ellis Dam | 4.4% | Ellis Dam - Annual report for 1984 12/7/83 - 11/7/84 Exploration Licence 28/49 |
| A1993 | 1970 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 & |
| A1143 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H |
| A1144 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H. |
| A1141 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381 |
| A1142 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | <1% | Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec |
| A79580 | 1753 | Saracen Gold Mines Pty Ltd | Carosue Dam | 23% | CAROSUE DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C064/2001, TENEMENTS: M28/166, M28/1 |
| A84243 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT, ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C065/2001, E31/152, E31/388, E31/390, E31/ |
| A84640 | 1753 | Saracen Gold Mines Pty Ltd | Carosue Dam | 6.7% | CAROSUE DAM PROJECT ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C064/2001, E28/828, E28/1747, E31/365, M28/166 |
| A87937 | 1753 | Saracen Gold Mines Pty Ltd | CAROSUE DAM/ Whirling Dervish | 6.7% | CAROSUE DAM PROJECT (C064/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E28/828, E28/1747, E31/365, M28 |
| A87936 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | <1% | OLD PLOUGH DAM PROJECT (C065/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E31/586, E31/620, E31/741, E3 |
| A87956 | 1753 | Saracen Gold Mines Pty Ltd | Mulgabbie West | 2.7% | Mulgabbie West Project 1 July 2009 to 30 June 2010, C117/1999, E31/796, M28/241, M28/266, M28/269, M31/295, M |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A84097 | 1753 | Saracen Gold Mines Pty Ltd | MULGABBIE WEST | 2.7% | MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009 CR Group: C117/1999 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 31/219 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.