M 38/114
Register summary
- Holders
- Regis Resources Limited, Duketon Resources Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 30 July 1987
- Commenced
- 29 Mar 1988
- Expiry
- 28 Mar 2030
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A125005 | 2020 | Regis Resources Limited | Duketon Central | <1% | Combined Annual Mineral Exploration Report for the Duketon Central Project C95/2016 for the period ending 30/0 |
| A123481 | 2020 | Duketon Mining Limited; Regis Resources Limited | Elistoun | 1.2% | Final Surrender Report E38/2819, Elistoun, 4 March 2014 to 27 February 2020 |
| A121211 | 2019 | Regis Resources Limited | Duketon Central | <1% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A121507 | 2019 | Regis Resources Limited; Duketon Mining Limited | Duketon Central | <1% | Duketon Central - Combined Annual Report - C47/2016 for the period 1 August 2018 to 31 July 2019, E38/02976, E |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | <1% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
88 more reports
| A118049 | 2018 | Duketon Mining Limited | Duketon Central | <1% | Annual Report Duketon Central C47/2016 for the period 01/08/2017 - 31/07/2018 |
| A112446 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95/2016 Final Surrender Report for the period 01/01/2016 to 08/11/2016 |
| A112656 | 2017 | Duketon Mining Limited | Duketon | 1.2% | Duketon Project E38/2819 Annual Report For the Period 4 March 2016 to 3 March 2017 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A115072 | 2017 | Duketon Mining Limited | Duketon Central | <1% | Annual Report Duketon Central C47/2016 for the period 1 August 2016 to 31 July 2017, E38/02976, E38/03083, E38 |
| A108880 | 2016 | Duketon Mining Limited | Duketon | 1.2% | Duketon E38/2819 Annual Report for the period 04/03/2015 to 03/03/2016 |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A105565 | 2015 | Duketon Mining Ltd | Duketon | 1.2% | Duketon Project E38/2819, Annual Report for the period 04/03/2014 to 03/03/2015 |
| A106314 | 2015 | Duketon Mining Ltd | Duketon West | 1.3% | Surrender Report E38/1535 Duketon West Project for the period 10/06/2008 – 09/06/2015 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | <1% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A104336 | 2014 | Duketon Mining Ltd | Duketon West | <1% | Duketon West Project. Annual Report, Combined Reporting No.: C99/2007, for the period 01/10/2013 – 30/09/2014 |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A100800 | 2013 | Duketon Mining Ltd | Duketon West | <1% | Duketon West Project, Annual Report for the period 01/10/2012 to 30/09/2013, E38/1535, 1537, 1800, 2177, 2206, |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A94953 | 2012 | South Boulder Mines Ltd | Duketon West | 1.3% | Exploration Licence E38/1535 Duketon West Project C99/2007 Partial Surrender Report for the period 10/06/2008 |
| A96070 | 2012 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007 “Duketon West” E38/1511, 1535, 1537, 1800, 1979, 2177, 2206, 2255, 2661, M38/1 |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A91382 | 2011 | South Boulder Mines Ltd | Duketon | 1.3% | Exploration Licence E38/1535, Duketon Project, Partial Surrender Report for the period 10/06/2008 to 9/06/2011 |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A87969 | 2010 | Regis Resources Ltd | Duketon | <1% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A79266 | 2008 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2007 TO 30/06/2008 PROJECT C61/2003 DUKETON |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A75801 | 2007 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report On Exploration For The Period 1/7/200 5 to 30/6/2006; C61/2003 Duketon Central: E38/378 |
| A73284 | 2006 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report on exploration for the period 1/07/2005 to 30/06/2006, Project C61/2003 Duketon Central |
| A69760 | 2005 | Newmont Australia Ltd | Duketon | <1% | Combined annual report for the period 01/07/03 - 30/06/04 Duketon Central Project, C61/2003, E38/378, E38/379, |
| A70955 | 2005 | Newmont Duketon Pty Ltd | Duketon | <1% | Combined annual report on exploration for the period 1/07/2004 to 30/06/2005, Project C61/2003, Duketon Centra |
| A66600 | 2003 | Newmont Australia Ltd | Duketon Belt/Erlistoun | <1% | Combined Annual Report on Exploration for period ended 17/3/2003 Project C16/1996 Erlistoun E38/379, 387, 565, |
| A64629 | 2002 | Mr Guj Al | Duketon | <1% | Combined Annual Mineral Exploration Report E38/714, P38/2902 2903, 2904, 2905, 2946, 2947, 2948 'Duketon Proje |
| A64877 | 2002 | Newmont Australia Ltd | Duketon Belt/Erlistoun | <1% | Combined Annual Report On Exploration For Period Ended 17/3/2002 Project C16/1996 Erlistoun E38/379, 386, 387, |
| A61653 | 2001 | Smd Investments Pty Ltd | Duketon gold-base metals exploration | <1% | Combined Annual Mineral Exploration Report E38/714, P38/2902 , 2903, 2904, 2905, 2946, 2947, 2948 'Duketon Pro |
| A62652 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration Licences: E38/379, 386-7, 404, 565, 649, 651, 653, 843, 1189-92, 1196 Mining Leases: M38/114, 237, |
| A63672 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration licences: E38/379, 386-387, 404, 565, 649, 651, 653, 789, 843, 1189-1192, 1196. Mining leases: M3 |
| A61238 | 2000 | Sons Of Gwalia Ltd | Swincer | 1.3% | Swincer Project, Surrender Report for the Period 20/08/1993 to 23/06/2000, E38/520. |
| A63219 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke Project, Surrender Report for the period 5 January 1993 to 28 September 2000, E38/496, 566, 598; P |
| A59621 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke (JV Project, Partial Surrender Report for the period 16/11/1993 to 02/08/1999, E38/566 |
| A60613 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke JV, Annual Report for the Period 1/12/1998 to 30/11/1999, E38/496, E38/566, E38/598, P38/2486-9, P3 |
| A61116 | 2000 | Sons Of Gwalia Ltd | Swincer | <1% | Swincer Project, Annual Report for the period 01/01/1999 to 31/12/1999, E38/520, E38/521. |
| A61966 | 2000 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | C16/1996 - Erlistoun Joint Annual Report for the period 18 March 1999 to 17 March 2000. Gold mining lease: GM |
| A57543 | 1999 | Sons Of Gwalia Ltd | Swincer | <1% | Swincer Project - Partial Surrender Report 20/08/93-09/07/98 E38/520-521 |
| A59200 | 1999 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Joint Annual Report on the Erlistoun Project, E38/379, 386- 387, 404, 565, 649, 651, 653, 789, M38/114, 237, 2 |
| A54261 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke JV Project Annual report for the period 01/12/96-30/11/97 Tenements E38/496,566,598 P38/2486-2489,2 |
| A54583 | 1998 | Sons Of Gwalia Ltd | Swincer | <1% | Swincer Project, Annual Report for the period 1 January 1997 - 31 December 1997, E38/520-521, P38/2518-2519. |
| A55359 | 1998 | Sons Of Gwalia Ltd | Baneygo | <1% | Baneygo Project Annual report for the period 01/01/97- 31/12/97 Tenements EL38/545 EL38/547 EL38/665 EL38/667 |
| A55392 | 1998 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration Licences E38/379 E38/386 to E38/387 E38/565 E38/649 E38/651 E38/653 Mining Leases M38/114 M38/237 |
| A55547 | 1998 | Sons Of Gwalia Ltd | Baneygo | 4.7% | Baneygo Project, PL 38/2520, 2521, 2525 Final Surrender Report, 23/03/94 - 18/04/98 |
| A56182 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke J.V. Project, Partial Surrender Report 16/11/93 - 02/04/98 E38/566. |
| A50167 | 1997 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Laverton Region Amy Clarke Joint Venture Project Annual report for the period 1 December 1995 to 30 November 1 |
| A50479 | 1997 | Sons Of Gwalia Ltd | Swincer | <1% | Swincer Project , Annual Report for the period 1 January 1996 - 31 December 1996, E38/520-521, P38/2518-2519. |
| A50928 | 1997 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region Baneygo Project Annual report for the period 1 January 1996 to 31 December 1996 Tenements E38/ |
| A47739 | 1996 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region North Eastern Goldfields Baneygo Project Annual report for the period 1 January 1995 to 31 Dec |
| A47742 | 1996 | Sons Of Gwalia Ltd | Swincer | <1% | Swincer Project ,Annual Report for the period 1 January 1995 - 31 December 1995,E38/520-521, P38/2518-2519. |
| A47872 | 1996 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 1.3% | Gold Mining Lease G38/2882,Exploration Licences E38/379,565, Mining Leases M38/114,262,283,292,303,316-317,341 |
| A49227 | 1996 | Sons Of Gwalia Ltd | Swincer | <1% | Laverton Region Swincer Project Partial Surrender Report for the Period 20th Augusr 1996-19 August 1996 E38/5 |
| A45519 | 1995 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region Northeastern Goldfields Baneygo project Annual report for the period 01 January 1994 to 31 Dec |
| A46412 | 1995 | Johnsons Well Mining Nl | Duketon | 1.8% | Exploration Licence E38/379 Mining Licences M38/292 M38/303 M38/114 M38/352 M38/262 M38/316 M38/317 M38/341 M3 |
| A47328 | 1995 | Sons Of Gwalia Ltd | Amy Clarke | <1% | Amy Clarke (JV) Project, Annual report for the period 1 December 1994 to 30 November 1995 E38/496 E38/566 E38 |
| A43882 | 1994 | Sons Of Gwalia Ltd | Swincer | <1% | Swincer Project, Annual Report for the period 1 January 1994 - 31 December 1994,E38/520-521, P38/2518-2519. |
| A38735 | 1993 | Ashton Gold Wa Ltd | Hack Well | 1.8% | Annual Technical Report H475 Hack Well Project E38/85, M38/114, M38/283, M38/292, M38/303, M38/316, M38/317, M |
| A40943 | 1993 | Aurora Gold Ltd | Hack Well | 1.8% | H475 Hack Well Project Western Australia Annual Technical` Report for the period 01 January 1993 to 31st Decem |
| A35628 | 1992 | Ashton Gold Wa Ltd | Hack Well | 1.9% | Annual Technical Report Hack Well Project E38/25, M38/114, M38/283, M38/291 to M38/293, M38/302 to M38/307, M3 |
| A35704 | 1992 | Ashton Gold Wa Ltd | Russell East | 4.5% | Annual report for the period 01/01/91-31/12/91 Russell East Project GML38/2882 P38/1881 P38/1882 |
| A33661 | 1991 | Ashton Gold Wa Ltd | Russell East | 4.5% | Annual report for the period 01/01/90-31/12/90 Russell East Project GML38/2882 P38/1881 P38/1882 |
| A33665 | 1991 | Ashton Gold Wa Ltd | Hack Well | 3.7% | Annual Technical Report H475 Hack Well Project. Prospecting Licences P38/835 to P38/837, P38/842, P38/843, P3 |
| A27726 | 1989 | Bp Minerals Aust Pty Ltd | Russell Find | 92% | Kennecott-Golden Plateau Erlistoun JV Russell Find Project M38/114 Annual report for period ending 28/03/89 |
| A2706 | 1981 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report:Exploration Report , Miscellaneous Maps & Plans, November 19 |
| A5359 | 1974 | Samin Ltd | Laverton | <1% | Laverton, Exploration report [non-statutory], For period 1st January 1973 - 18th June 1974, MC38/673 ... 38/63 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2470 | 1972 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Final Report, April 1972, TR70/3813, 4490 & 4492H. |
| A2694 | 1972 | Cominco Exploration Pty Ltd | Erlistoun -Baneygo | <1% | Erlistoun - Baneygo Project, Final Surrender Report for the period ending 09/02/1972, TR70/3813H. |
| A9159 | 1972 | Cominco Exploration Pty Ltd | Erlistoun- Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report:Exploration Report for the period 01/01/1971 to 31/12/1971, TR |
| A9156 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo (JV) Project, Non-statutory Report:Progress Report for the period 31st May 1970 to 1st Ja |
| A2707 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Miscellaneous Plans (25) for Baneygo-King of Creation, for |
| A9157 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Annual Report for the period 01/01/1970 to 31/12/1970, TR70/3813; MC38/3917...... |
| A9158 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun-Baneygo (JV) Project, Non-statutory Report, Progress Report for the period 01/01/1971 to 30/06/1971, |
| A1118 | 1969 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/3 |
| A1112 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Report on the Induced Polarization & Resistivity Survey on Th |
| A1113 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps & Magnetic Anomalies, December |
| A1114 | 1968 | Cominco Exploration Pty Ltd | Erlistoun | <1% | Erlistoun Project, Non-statutory Report: A Review of Activities to March 21st 1968, TR70/ 3813, 3899, 4490-449 |
| A1115 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1968, TR70/3 |
| A1110 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report Progress Report for the period 01/09/1966 to 31/03/1967, TR70/ |
| A1111 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps, December 1966 to April 1967,TR |
| A1117 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project: |
| A1119 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: |
| A1120 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Annual Report for the period ending 30th June 1970, TR70/3813, 4490 & 4492H |
| A51107 | 1753 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 1.5% | Exploration Licences E38/379 E38/565 Mining Leases M38/114 M38/262 M38/283 M38/292 M38/303 M38/316 M38/317 M38 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 28 Mar 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 38/114 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 38/114? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.