M 38/1259
M 38/1259 is a live mining lease in the Shire of Laverton, Western Australia, held by Duketon Resources Pty Ltd (part of Regis Resources Limited). Granted on 28 Mar 2014 for 21 years, it expires on 27 Mar 2035. The ground is covered by 87 historical WAMEX reports.
Register summary
- Holder
- Duketon Resources Pty Ltd
- Part of
- Regis Resources Limited (ASX:RRL) as at 2026-06-30
- Local government
- Shire of Laverton
- Application received
- 19 June 2013
- Commenced
- 28 Mar 2014
- Expiry
- 27 Mar 2035
- Term
- 21 Years
The full record on M 38/1259
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 13 years of expenditure, 60 conditions and 13 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (15 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A130620 | 2022 | Regis Resources Limited | Duketon South | 2.5% | Partial Surrender Report - E38/3083 Duketon South for the period ending 04/03/2022 |
| A125005 | 2020 | Regis Resources Limited | Duketon Central | <1% | Combined Annual Mineral Exploration Report for the Duketon Central Project C95/2016 for the period ending 30/0 |
| A123278 | 2020 | Regis Resources Ltd | Rosemont Deeps | <1% | Rosemont Gold Project, Duketon Greenstone Bel, EIS Final Report, Tenement No. M38/237, M38/250 (R19) |
| A123428 | 2020 | Regis Resources Limited | Mckenzies Well - Camel Hump | <1% | Final Surrender Report for McKenzies Well to Camel Hump for the period 25 July 2013 to 20 February 2020 |
| A125250 | 2020 | Regis Resources Limited | Duketon Central | 1.4% | Combined Annual Mineral Exploration Report for the Duketon Central Project C47/2016 for the period ending 31/0 |
82 more reports
| A121211 | 2019 | Regis Resources Limited | Duketon Central | <1% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A121507 | 2019 | Regis Resources Limited; Duketon Mining Limited | Duketon Central | <1% | Duketon Central - Combined Annual Report - C47/2016 for the period 1 August 2018 to 31 July 2019, E38/02976, E |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | <1% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
| A118049 | 2018 | Duketon Mining Limited | Duketon Central | <1% | Annual Report Duketon Central C47/2016 for the period 01/08/2017 - 31/07/2018 |
| A112446 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95/2016 Final Surrender Report for the period 01/01/2016 to 08/11/2016 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | <1% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A115072 | 2017 | Duketon Mining Limited | Duketon Central | <1% | Annual Report Duketon Central C47/2016 for the period 1 August 2016 to 31 July 2017, E38/02976, E38/03083, E38 |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A109772 | 2016 | Duketon Mining Limited | Duketon | 1.7% | Duketon Project C47/2016 Annual Report For the Period 1 August 2015 to 31 July 2016, E 38/02976, E 38/03083 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | <1% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A106766 | 2015 | Regis Resources Limited | Duketon | 3.7% | E38-2003 Partial Surrender Report for the period 30 June 2009 to 29 June 2015 |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A99150 | 2013 | South Boulder Mines Ltd | Duketon West | 7.4% | Surrender Report for E38/1979, Duketon West Project, for the Period 10th June 2008 to 9th June 2013 |
| A93424 | 2012 | South Boulder Mines Ltd | Duketon West | <1% | Final Surrender Report on E38/1980 for the Period to 17/2/2011 (Formerly part of the Duketon West Project (C99 |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A96070 | 2012 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007 “Duketon West” E38/1511, 1535, 1537, 1800, 1979, 2177, 2206, 2255, 2661, M38/1 |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | <1% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A91194 | 2011 | Regis Resources Ltd | Duketon Central | <1% | E38/559 Surrender Report, 24/09/1993 to 3/12/2010 |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A87969 | 2010 | Regis Resources Ltd | Duketon | <1% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A79266 | 2008 | Regis Resources Ltd | DUKETON CENTRAL | <1% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2007 TO 30/06/2008 PROJECT C61/2003 DUKETON |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A75801 | 2007 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report On Exploration For The Period 1/7/200 5 to 30/6/2006; C61/2003 Duketon Central: E38/378 |
| A73284 | 2006 | Regis Resources Nl | Duketon Central | <1% | Combined Annual Report on exploration for the period 1/07/2005 to 30/06/2006, Project C61/2003 Duketon Central |
| A69760 | 2005 | Newmont Australia Ltd | Duketon | <1% | Combined annual report for the period 01/07/03 - 30/06/04 Duketon Central Project, C61/2003, E38/378, E38/379, |
| A70955 | 2005 | Newmont Duketon Pty Ltd | Duketon | <1% | Combined annual report on exploration for the period 1/07/2004 to 30/06/2005, Project C61/2003, Duketon Centra |
| A66600 | 2003 | Newmont Australia Ltd | Duketon Belt/Erlistoun | <1% | Combined Annual Report on Exploration for period ended 17/3/2003 Project C16/1996 Erlistoun E38/379, 387, 565, |
| A67536 | 2003 | Newmont Duketon Pty Ltd | Duketon | <1% | Interim Combined Annual Report for the period 24/09/2002 to 30/06/2003 Duketon Central Project C61/2003: E38/4 |
| A64531 | 2002 | Newmont Yandal Operations Ltd | Duketon | <1% | Duketon Project, Annual Report for the period 1st January 2001 to 31st December 2001, E38/438, 440, 477, 567, |
| A64877 | 2002 | Newmont Australia Ltd | Duketon Belt/Erlistoun | <1% | Combined Annual Report On Exploration For Period Ended 17/3/2002 Project C16/1996 Erlistoun E38/379, 386, 387, |
| A65944 | 2002 | Newmont Australia Ltd | Murphy Hills | <1% | Combined Annual Report on Exploration for period ended 24/9/2002 Project C181/1997 Murphy Hills E38/559 & E38/ |
| A62652 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration Licences: E38/379, 386-7, 404, 565, 649, 651, 653, 843, 1189-92, 1196 Mining Leases: M38/114, 237, |
| A62674 | 2001 | Croesus Mining Nl | Erlistoun | <1% | Erlistoun West Project Annual Report For The Period 1 May 2000 to 30 April 2001 On The Tenements E38/1169 and |
| A62782 | 2001 | Normandy Yandal Operations Ltd | Duketon | <1% | Annual Report for period ended 31 December 2000, E38/438, 440, 477, 567, 5 85, 630, 654 & P38/2715, 2716, 271 |
| A63672 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration licences: E38/379, 386-387, 404, 565, 649, 651, 653, 789, 843, 1189-1192, 1196. Mining leases: M3 |
| A63768 | 2001 | Acm Mines Pty Ltd | Murphy Hills | <1% | Combined Annual Report on exploration for period ended 23/09/2001 Project Murphy Hills E38/559, E38/573 C181/1 |
| A64529 | 2001 | Normandy Yandal Operations Ltd | Little Well | 1.5% | Surrender Report On Exploration For Period Ended 08/05/2001 E38/654 Little Well Project. |
| A61966 | 2000 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | C16/1996 - Erlistoun Joint Annual Report for the period 18 March 1999 to 17 March 2000. Gold mining lease: GM |
| A57114 | 1999 | Johnsons Well Mining Nl | Murphy Hills | <1% | C181/1997 - Murphy Hills - Joint Annual Report Exploration Licence: E38/559, 573 24/09/97 - 23/09/98 |
| A57805 | 1999 | Johnsons Well Mining Nl | Texrise Duketon No 1 | 1.9% | Texrise Duketon No 1 Project, Partial Surrender Report for the period 2nd December 1994 to 10th Sept 1998, E38 |
| A59200 | 1999 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Joint Annual Report on the Erlistoun Project, E38/379, 386- 387, 404, 565, 649, 651, 653, 789, M38/114, 237, 2 |
| A55392 | 1998 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | <1% | Exploration Licences E38/379 E38/386 to E38/387 E38/565 E38/649 E38/651 E38/653 Mining Leases M38/114 M38/237 |
| A50341 | 1997 | Aurora Gold Ltd | Baneygo | <1% | Annual Technical Report Baneygo Project Western Australia Mining Leases M38/237 M38/250 M38/319 M38/343 and M3 |
| A50419 | 1997 | Wiluna Mines Ltd | Duketon | <1% | Duketon Project, Annual Report for the year ending 31/12/1996, E38/438 ,440, E38/477 E38/509 E38/567 E38/585 E |
| A52316 | 1997 | Johnsons Well Mining Nl | Erlistoun | 1.6% | Annual Report for the period 17th October 1995 to 16th October 1996, E38/651, Erlistoun Project. |
| A52786 | 1997 | Johnsons Well Mining Nl | Murphy Hills | <1% | Exploration Licence E38/559 & 573 'Murphy Hills' Annual report for the period 24/09/96-23/09/97 JWM[C181/1997] |
| A53944 | 1997 | Wiluna Mines Ltd | Duketon Project | <1% | Duketon Project, 1997 Annual Report Exploration Licence: 38/438, 440, 477, 509, 567, 585, 630, 38/654 Prospect |
| A46725 | 1996 | Johnsons Well Mining Nl | Kulguddi | 1.2% | Exploration E38/649 and E38/653 'Kulguddi Project' Annual report for the period 2 December 1994 to 1 December |
| A47561 | 1996 | Johnsons Well Mining Nl | Duketon Belt 4 | <1% | Duketon Belt 4 (JV) Project, Annual Report for the period 10th February 1995 to 9th February 1996, E38/559. 64 |
| A46083 | 1995 | Johnsons Well Mining Nl | Murphy Hills | <1% | Exploration Licence E38/559 'Murphy Hills Project' Annual report for the period 24 September 1994 to 23 Septem |
| A43675 | 1995 | Aurora Gold Ltd | Baneygo | <1% | Annual Technical Report Baneygo Project Western Australia Mining Lease M38/237 M38/250 M38/319 M38/343 and M38 |
| A47471 | 1995 | Aurora Gold Ltd | Baneygo | <1% | H477 Baneygo Project Western Australia Annual Technical Report Mining Leases M38/237 M38/250 M38/319 M38/343 a |
| A42810 | 1994 | Johnsons Well Mining Nl | Murphy Hills | <1% | Exploration Licence E38/559 'Murphy Hills Project' Annual report for the period 24 September 1993 to 23 Septem |
| A40715 | 1994 | Aurora Gold Ltd | Baneygo | <1% | Annual Technical Report Baneygo Project WA Mining Leases M38/237, M38/250, M38/319, M38/343, M38/344, Prospect |
| A35655 | 1992 | Ashton Gold Wa Ltd | Baneygo | <1% | Annual Technical Report Baneygo Project Mining Leases M38/111, M38/190, M38/195, M38/237, M38/238, M38/277, M3 |
| A39436 | 1992 | Ashton Gold Wa Ltd | Baneygo | <1% | Annual Technical Report Baneygo Project Mining Leases M38/111, M38/190, M38/195, M38/237, M38/238, M38/277, M3 |
| A33545 | 1991 | Ashton Gold Mines Pty Ltd | Baneygo | <1% | Annual technical report Baneygo Project M38/111 M38/190 M38/195 M38/237 M38/238 M38/277 M38/278 M38/280 E38/70 |
| A2706 | 1981 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report:Exploration Report , Miscellaneous Maps & Plans, November 19 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2470 | 1972 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Final Report, April 1972, TR70/3813, 4490 & 4492H. |
| A2694 | 1972 | Cominco Exploration Pty Ltd | Erlistoun -Baneygo | <1% | Erlistoun - Baneygo Project, Final Surrender Report for the period ending 09/02/1972, TR70/3813H. |
| A9159 | 1972 | Cominco Exploration Pty Ltd | Erlistoun- Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report:Exploration Report for the period 01/01/1971 to 31/12/1971, TR |
| A9156 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo (JV) Project, Non-statutory Report:Progress Report for the period 31st May 1970 to 1st Ja |
| A2707 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Miscellaneous Plans (25) for Baneygo-King of Creation, for |
| A9157 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Annual Report for the period 01/01/1970 to 31/12/1970, TR70/3813; MC38/3917...... |
| A9158 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun-Baneygo (JV) Project, Non-statutory Report, Progress Report for the period 01/01/1971 to 30/06/1971, |
| A1118 | 1969 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/3 |
| A1112 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Report on the Induced Polarization & Resistivity Survey on Th |
| A1113 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps & Magnetic Anomalies, December |
| A1114 | 1968 | Cominco Exploration Pty Ltd | Erlistoun | <1% | Erlistoun Project, Non-statutory Report: A Review of Activities to March 21st 1968, TR70/ 3813, 3899, 4490-449 |
| A1115 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1968, TR70/3 |
| A1116 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Final Reports 1967 & 1968, TR70/3899 & 4349H. |
| A1110 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report Progress Report for the period 01/09/1966 to 31/03/1967, TR70/ |
| A1111 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps, December 1966 to April 1967,TR |
| A1117 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project: |
| A1119 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: |
| A1120 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Annual Report for the period ending 30th June 1970, TR70/3813, 4490 & 4492H |
| A50779 | 1753 | Johnsons Well Mining Nl | Duketon Belt 4 | <1% | Exploration Licences E38/559 E38/649 E38/653 and Prospecting Licences P38/2558 to P38/2561 'Duketon Belt 4 Pro |
| A51381 | 1753 | Johnsons Well Mining Nl | Erlistoun | <1% | Mining Licences M38/343 M38/344 'Erlistoun' Annual report for the period 23 April 1996 to 22 April 1997 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 38/1259 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 38/1259? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.