M 38/344
Register summary
- Holders
- Regis Resources Limited, Duketon Resources Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 24 Mar 1992
- Commenced
- 23 Apr 1993
- Expiry
- 22 Apr 2035
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A130620 | 2022 | Regis Resources Limited | Duketon South | 3.3% | Partial Surrender Report - E38/3083 Duketon South for the period ending 04/03/2022 |
| A124986 | 2020 | Stone Resources Australia Limited | E38/1937 | 4.4% | E38/1937 Final Surrender Report for the period ending 08/07/2020 |
| A125005 | 2020 | Regis Resources Limited | Duketon Central | 2.7% | Combined Annual Mineral Exploration Report for the Duketon Central Project C95/2016 for the period ending 30/0 |
| A125250 | 2020 | Regis Resources Limited | Duketon Central | 5.3% | Combined Annual Mineral Exploration Report for the Duketon Central Project C47/2016 for the period ending 31/0 |
| A123520 | 2020 | Stone Resources Australia | Brightstar North | 2.1% | C209/2006 COMBINED ANNUAL EXPLORATION REPORT, BRIGHTSTAR NORTH, 1 JANUARY 2019 TO 31 DECEMBER 2019 |
117 more reports
| A123278 | 2020 | Regis Resources Ltd | Rosemont Deeps | <1% | Rosemont Gold Project, Duketon Greenstone Bel, EIS Final Report, Tenement No. M38/237, M38/250 (R19) |
| A119561 | 2019 | Stone Resources Australia Limited | Brightstar North | 1.8% | C209/2006 Combined Annual Exploration Report for the period 1 January 2018 to 31 December 2018 |
| A121211 | 2019 | Regis Resources Limited | Duketon Central | 1.5% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A121507 | 2019 | Regis Resources Limited; Duketon Mining Limited | Duketon Central | 2.1% | Duketon Central - Combined Annual Report - C47/2016 for the period 1 August 2018 to 31 July 2019, E38/02976, E |
| A116697 | 2018 | Stone Resources Australia Limited | Brightstar North | 2% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 19/05/2017 - 20/05/2018 |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | 1.5% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
| A118049 | 2018 | Duketon Mining Limited | Duketon Central | 2.1% | Annual Report Duketon Central C47/2016 for the period 01/08/2017 - 31/07/2018 |
| A112788 | 2017 | Stone Resources Australia Limited | Brightstar North | 2% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 01/01/2016 – 31/12/2016 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | 1.8% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A115072 | 2017 | Duketon Mining Limited | Duketon Central | 1.7% | Annual Report Duketon Central C47/2016 for the period 1 August 2016 to 31 July 2017, E38/02976, E38/03083, E38 |
| A108839 | 2016 | Stone Resources Australia Ltd | Brightstar North | 1.8% | C209/2006 Combined Annual Exploration Report for period 01/01/2015 – 31/12/2015 |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | 1.6% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A109772 | 2016 | Duketon Mining Limited | Duketon | 6.1% | Duketon Project C47/2016 Annual Report For the Period 1 August 2015 to 31 July 2016, E 38/02976, E 38/03083 |
| A104495 | 2015 | Duketon Mining Ltd | Duketon West | 4.8% | Surrender Report E38/2206 (Duketon West) for the period 23/11/2009 – 21/11/2014 |
| A105227 | 2015 | Stone Resources Australia Ltd | Brightstar North | 1.8% | Combined Annual Exploration Report for C209/2006 from 01/01/2014 to 31/12/2014, E38/1936.....P38/4115 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | 1.6% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A101263 | 2014 | Stone Resources Australia | Brightstar North | 1.7% | Combined Annual Exploration Report for Brightstar North Project C209/2006 from 01/01/2013 to 31/12/2013, E 38/ |
| A102125 | 2014 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central E38/2002 Surrender Report for the period 12/09/2008 to 20/02/2014 |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | 1.6% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A103266 | 2014 | Stone Resources Australia | E38/1937 | 4.4% | E38/1937 Partial Surrender Report for the period 08/08/2008 to 07/08/2014 |
| A97680 | 2013 | Stone Resources Australia | Brightstar North | 1.8% | CR209-2006 COMBINED ANNUAL EXPLORATION REPORT Reporting Period 1/01/2012 – 31/12/2012 |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | 1.8% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A99150 | 2013 | South Boulder Mines Ltd | Duketon West | <1% | Surrender Report for E38/1979, Duketon West Project, for the Period 10th June 2008 to 9th June 2013 |
| A100800 | 2013 | Duketon Mining Ltd | Duketon West | <1% | Duketon West Project, Annual Report for the period 01/10/2012 to 30/09/2013, E38/1535, 1537, 1800, 2177, 2206, |
| A92874 | 2012 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central Project, Final Surrender Report for the period 24th May 2011 to 24th Novembe 2011, P38/3914. |
| A93088 | 2012 | Regis Resources Ltd | Duketon Central | 46% | SURRENDER REPORT FOR THE PERIOD 3 DECEMBER 2007 TO 24 NOVEMBER 2011 TENEMENT NO. E38/1074 OF DUKETON CENTRAL P |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | 1.4% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A96070 | 2012 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007 “Duketon West” E38/1511, 1535, 1537, 1800, 1979, 2177, 2206, 2255, 2661, M38/1 |
| A89810 | 2011 | A1 Minerals Ltd | Bright Star North | 1.5% | Bright Star North Project C209/2006 Combined Annual Report for the period 01/01/2010 to 31/12/2010 |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | 1.5% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A93427 | 2011 | A1 Minerals Ltd | Bright Star North | 1.8% | Bright Star North Project Combined Annual report for the period 01/01/2011 to 31/12/2011, C209/2006, E38/1936, |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A86180 | 2010 | A1 Minerals Ltd | Brightstar North | 1.5% | Bright Star North Project C209/2006 Annual Combined Report for the period 01/01/2009 to 31/12/2009 |
| A87969 | 2010 | Regis Resources Ltd | Duketon | 1.3% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A80697 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | 46% | Annual Report on Exploration for the period 3/12/2007 to 2/12/2008: Duketon Central E38/1074 |
| A81678 | 2009 | A1 Minerals Ltd | Bright Star North | 1.5% | Bright Star North Project, Annual Report for th eperuiod 01/01/2008 to 31/12/2008, E38/1368. 1375, 1563, 1618, |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | 1.3% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A76989 | 2008 | South Boulder Mines Ltd | Duketon | <1% | Combined Annual Report C99/2007, E38/1043,....E38/1801, M38/330, P38/3160....P38/3309, Duketon West, for the p |
| A79266 | 2008 | Regis Resources Ltd | DUKETON CENTRAL | 1.6% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2007 TO 30/06/2008 PROJECT C61/2003 DUKETON |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A75801 | 2007 | Regis Resources Nl | Duketon Central | 1.6% | Combined Annual Report On Exploration For The Period 1/7/200 5 to 30/6/2006; C61/2003 Duketon Central: E38/378 |
| A73284 | 2006 | Regis Resources Nl | Duketon Central | 2% | Combined Annual Report on exploration for the period 1/07/2005 to 30/06/2006, Project C61/2003 Duketon Central |
| A69760 | 2005 | Newmont Australia Ltd | Duketon | 1.5% | Combined annual report for the period 01/07/03 - 30/06/04 Duketon Central Project, C61/2003, E38/378, E38/379, |
| A70674 | 2005 | Newmont Australia Ltd | Duketon Central | 1.8% | Duketon Central Project,Final Surrender Report for the period to 10/03/2005 , E38/438, E38/567, & E38/585. |
| A70955 | 2005 | Newmont Duketon Pty Ltd | Duketon | 2% | Combined annual report on exploration for the period 1/07/2004 to 30/06/2005, Project C61/2003, Duketon Centra |
| A66600 | 2003 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 3.7% | Combined Annual Report on Exploration for period ended 17/3/2003 Project C16/1996 Erlistoun E38/379, 387, 565, |
| A64531 | 2002 | Newmont Yandal Operations Ltd | Duketon | <1% | Duketon Project, Annual Report for the period 1st January 2001 to 31st December 2001, E38/438, 440, 477, 567, |
| A64877 | 2002 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 3.4% | Combined Annual Report On Exploration For Period Ended 17/3/2002 Project C16/1996 Erlistoun E38/379, 386, 387, |
| A62782 | 2001 | Normandy Yandal Operations Ltd | Duketon | <1% | Annual Report for period ended 31 December 2000, E38/438, 440, 477, 567, 5 85, 630, 654 & P38/2715, 2716, 271 |
| A62652 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.3% | Exploration Licences: E38/379, 386-7, 404, 565, 649, 651, 653, 843, 1189-92, 1196 Mining Leases: M38/114, 237, |
| A63672 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3% | Exploration licences: E38/379, 386-387, 404, 565, 649, 651, 653, 789, 843, 1189-1192, 1196. Mining leases: M3 |
| A63219 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 3% | Amy Clarke Project, Surrender Report for the period 5 January 1993 to 28 September 2000, E38/496, 566, 598; P |
| A59621 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 4.2% | Amy Clarke (JV Project, Partial Surrender Report for the period 16/11/1993 to 02/08/1999, E38/566 |
| A60613 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Amy Clarke JV, Annual Report for the Period 1/12/1998 to 30/11/1999, E38/496, E38/566, E38/598, P38/2486-9, P3 |
| A61966 | 2000 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.1% | C16/1996 - Erlistoun Joint Annual Report for the period 18 March 1999 to 17 March 2000. Gold mining lease: GM |
| A57805 | 1999 | Johnsons Well Mining Nl | Texrise Duketon No 1 | 1.1% | Texrise Duketon No 1 Project, Partial Surrender Report for the period 2nd December 1994 to 10th Sept 1998, E38 |
| A59200 | 1999 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.2% | Joint Annual Report on the Erlistoun Project, E38/379, 386- 387, 404, 565, 649, 651, 653, 789, M38/114, 237, 2 |
| A54026 | 1998 | Wiluna Mines Ltd | Duketon | 25% | Duketon Project, Partial Reliquishment Report to Dept of Minerals and Energy Exploration Licence E38/509. |
| A54261 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Amy Clarke JV Project Annual report for the period 01/12/96-30/11/97 Tenements E38/496,566,598 P38/2486-2489,2 |
| A55359 | 1998 | Sons Of Gwalia Ltd | Baneygo | <1% | Baneygo Project Annual report for the period 01/01/97- 31/12/97 Tenements EL38/545 EL38/547 EL38/665 EL38/667 |
| A55392 | 1998 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.3% | Exploration Licences E38/379 E38/386 to E38/387 E38/565 E38/649 E38/651 E38/653 Mining Leases M38/114 M38/237 |
| A56181 | 1998 | Sons Of Gwalia Ltd | Baneygo | 3.2% | Baneygo Project, Partial Surrender Report E38/547 24/09/93 - 09/07/98 |
| A56182 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | 4.2% | Amy Clarke J.V. Project, Partial Surrender Report 16/11/93 - 02/04/98 E38/566. |
| A53944 | 1997 | Wiluna Mines Ltd | Duketon Project | 1.4% | Duketon Project, 1997 Annual Report Exploration Licence: 38/438, 440, 477, 509, 567, 585, 630, 38/654 Prospect |
| A50167 | 1997 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Laverton Region Amy Clarke Joint Venture Project Annual report for the period 1 December 1995 to 30 November 1 |
| A50341 | 1997 | Aurora Gold Ltd | Baneygo | 36% | Annual Technical Report Baneygo Project Western Australia Mining Leases M38/237 M38/250 M38/319 M38/343 and M3 |
| A50419 | 1997 | Wiluna Mines Ltd | Duketon | 1.4% | Duketon Project, Annual Report for the year ending 31/12/1996, E38/438 ,440, E38/477 E38/509 E38/567 E38/585 E |
| A50637 | 1997 | Sons Of Gwalia Ltd | Baneygo | 3.2% | Partial Surrender Report for the period 24 November 1993 - 23 November 1996 |
| A50928 | 1997 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region Baneygo Project Annual report for the period 1 January 1996 to 31 December 1996 Tenements E38/ |
| A46725 | 1996 | Johnsons Well Mining Nl | Kulguddi | <1% | Exploration E38/649 and E38/653 'Kulguddi Project' Annual report for the period 2 December 1994 to 1 December |
| A47320 | 1996 | Wiluna Mines Ltd | Duketon | 1.6% | Duketon Project, Annual Report for the period 1st January 1995 to 31st December 1995, E38/438, E38/440, E38/4 |
| A47561 | 1996 | Johnsons Well Mining Nl | Duketon Belt 4 | <1% | Duketon Belt 4 (JV) Project, Annual Report for the period 10th February 1995 to 9th February 1996, E38/559. 64 |
| A47739 | 1996 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region North Eastern Goldfields Baneygo Project Annual report for the period 1 January 1995 to 31 Dec |
| A44346 | 1995 | Wiluna Mines Ltd | Duketon | 1.6% | Duketon Project, Annual Rreport for the period January 1st 1994 to December 31st 1994. E38/438, 440, 477, 509, |
| A45519 | 1995 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region Northeastern Goldfields Baneygo project Annual report for the period 01 January 1994 to 31 Dec |
| A43675 | 1995 | Aurora Gold Ltd | Baneygo | 36% | Annual Technical Report Baneygo Project Western Australia Mining Lease M38/237 M38/250 M38/319 M38/343 and M38 |
| A47328 | 1995 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Amy Clarke (JV) Project, Annual report for the period 1 December 1994 to 30 November 1995 E38/496 E38/566 E38 |
| A47471 | 1995 | Aurora Gold Ltd | Baneygo | 36% | H477 Baneygo Project Western Australia Annual Technical Report Mining Leases M38/237 M38/250 M38/319 M38/343 a |
| A43247 | 1994 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region North Eastern Goldfields Baneygo Project Interim Report to 23 September 1994 Tenements:E38/545 |
| A40715 | 1994 | Aurora Gold Ltd | Baneygo | 35% | Annual Technical Report Baneygo Project WA Mining Leases M38/237, M38/250, M38/319, M38/343, M38/344, Prospect |
| A40430 | 1993 | Asarco Australia Ltd | Duketon Project | 1.1% | Annual report for the period 01/01/93-31/12/93 Duketon Project E38/438 E38/440 E38/477 E38/509 |
| A35655 | 1992 | Ashton Gold Wa Ltd | Baneygo | 37% | Annual Technical Report Baneygo Project Mining Leases M38/111, M38/190, M38/195, M38/237, M38/238, M38/277, M3 |
| A39436 | 1992 | Ashton Gold Wa Ltd | Baneygo | 37% | Annual Technical Report Baneygo Project Mining Leases M38/111, M38/190, M38/195, M38/237, M38/238, M38/277, M3 |
| A33545 | 1991 | Ashton Gold Mines Pty Ltd | Baneygo | 37% | Annual technical report Baneygo Project M38/111 M38/190 M38/195 M38/237 M38/238 M38/277 M38/278 M38/280 E38/70 |
| A10686 | 1982 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the period 10/12/1980 to 08/12/1981, MC38/6941-6966, 7096-7106, 7110-7 |
| A2706 | 1981 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report:Exploration Report , Miscellaneous Maps & Plans, November 19 |
| A10253 | 1981 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the period 12th December 1979 to 9th December 1980, MC38/6941-6966... |
| A8238 | 1979 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hil Project, Annual Report for the period 14th December 1977 to 12th December 1978, MC38/6941-6966, 7 |
| A9337 | 1979 | Carpentaria Exp Co Pty Ltd | Ogilvies | 3.5% | Ogilvies Project, Non-statutory Report: An Econcomic Assessment of the Ogilvies Mineral Claims, April 1979, MC |
| A7426 | 1978 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the period 1st July 1976 to 13th December 1977, MC38/6941-6966, 7096- |
| A6690 | 1976 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the year ending 29th June 1976, MC38/6941-6966 & 7096-7106. |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2470 | 1972 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Final Report, April 1972, TR70/3813, 4490 & 4492H. |
| A2694 | 1972 | Cominco Exploration Pty Ltd | Erlistoun -Baneygo | <1% | Erlistoun - Baneygo Project, Final Surrender Report for the period ending 09/02/1972, TR70/3813H. |
| A9159 | 1972 | Cominco Exploration Pty Ltd | Erlistoun- Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report:Exploration Report for the period 01/01/1971 to 31/12/1971, TR |
| A9156 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo (JV) Project, Non-statutory Report:Progress Report for the period 31st May 1970 to 1st Ja |
| A2707 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Miscellaneous Plans (25) for Baneygo-King of Creation, for |
| A9157 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Annual Report for the period 01/01/1970 to 31/12/1970, TR70/3813; MC38/3917...... |
| A9158 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun-Baneygo (JV) Project, Non-statutory Report, Progress Report for the period 01/01/1971 to 30/06/1971, |
| A1118 | 1969 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/3 |
| A1112 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Report on the Induced Polarization & Resistivity Survey on Th |
| A1113 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps & Magnetic Anomalies, December |
| A1114 | 1968 | Cominco Exploration Pty Ltd | Erlistoun | <1% | Erlistoun Project, Non-statutory Report: A Review of Activities to March 21st 1968, TR70/ 3813, 3899, 4490-449 |
| A1115 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1968, TR70/3 |
| A1110 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report Progress Report for the period 01/09/1966 to 31/03/1967, TR70/ |
| A1111 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps, December 1966 to April 1967,TR |
| A1117 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project: |
| A1119 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: |
| A1120 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Annual Report for the period ending 30th June 1970, TR70/3813, 4490 & 4492H |
| A7981 | 1753 | Amax Iron Ore Corporation | Ogilvies | 1.7% | Ogilvies (JV) Project, Non-statutory Report: Final Report, July 1978, MC38/7295-7296, 7320, 7360, 7363, 7389-7 |
| A12355 | 1753 | Chevron Exploration Corp | Erlistoun base | 8.7% | Erlistoun, MC38/8064-38/8096 Inc. MC38/8244, EL 38/9. Annual Report. November 1981-December 1982 |
| A14502 | 1753 | Chevron Exploration Corp | Erlistoun base | 8.7% | Chevron Exploration Corporation Annual Report - MC 38/8096 Terminal Report- EL 38/9 and MC 38/8224 Mt Margaret |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A50779 | 1753 | Johnsons Well Mining Nl | Duketon Belt 4 | <1% | Exploration Licences E38/559 E38/649 E38/653 and Prospecting Licences P38/2558 to P38/2561 'Duketon Belt 4 Pro |
| A51381 | 1753 | Johnsons Well Mining Nl | Erlistoun | 55% | Mining Licences M38/343 M38/344 'Erlistoun' Annual report for the period 23 April 1996 to 22 April 1997 |
| A153748 | Regis Resources Limited | Duketon | 99% | Drilling Files for Regis Resources Donated Drillhole RRLBYDD022 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 9 years · 22 Apr 2035
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 38/344 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 38/344? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.