M 38/344
M 38/344 is a live mining lease in the Shire of Laverton, Western Australia, held by Regis Resources Limited and Duketon Resources Pty Ltd (part of Regis Resources Limited). Granted on 23 Apr 1993 for 21 years (renewed), it expires on 22 Apr 2035. The ground is covered by 122 historical WAMEX reports.
Register summary
- Holders
- Regis Resources Limited, Duketon Resources Pty Ltd
- Part of
- Regis Resources Limited (ASX:RRL) as at 2026-06-30
- Local government
- Shire of Laverton
- Application received
- 24 Mar 1992
- Commenced
- 23 Apr 1993
- Expiry
- 22 Apr 2035
- Term
- 21 Years (Renewed)
The full record on M 38/344
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 9 changes of holder
- The full record: 35 years of expenditure, 89 conditions and 1 endorsement
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (50 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A130620 | 2022 | Regis Resources Limited | Duketon South | 3.3% | Partial Surrender Report - E38/3083 Duketon South for the period ending 04/03/2022 |
| A124986 | 2020 | Stone Resources Australia Limited | E38/1937 | 4.4% | E38/1937 Final Surrender Report for the period ending 08/07/2020 |
| A125005 | 2020 | Regis Resources Limited | Duketon Central | 2.7% | Combined Annual Mineral Exploration Report for the Duketon Central Project C95/2016 for the period ending 30/0 |
| A123520 | 2020 | Stone Resources Australia | Brightstar North | 2.1% | C209/2006 COMBINED ANNUAL EXPLORATION REPORT, BRIGHTSTAR NORTH, 1 JANUARY 2019 TO 31 DECEMBER 2019 |
| A123278 | 2020 | Regis Resources Ltd | Rosemont Deeps | <1% | Rosemont Gold Project, Duketon Greenstone Bel, EIS Final Report, Tenement No. M38/237, M38/250 (R19) |
117 more reports
| A125250 | 2020 | Regis Resources Limited | Duketon Central | 5.3% | Combined Annual Mineral Exploration Report for the Duketon Central Project C47/2016 for the period ending 31/0 |
| A119561 | 2019 | Stone Resources Australia Limited | Brightstar North | 1.8% | C209/2006 Combined Annual Exploration Report for the period 1 January 2018 to 31 December 2018 |
| A121211 | 2019 | Regis Resources Limited | Duketon Central | 1.5% | Annual Report C95/2016 Duketon Central Project for the period 1 July 2018 to 30 June 2019 |
| A121507 | 2019 | Regis Resources Limited; Duketon Mining Limited | Duketon Central | 2.1% | Duketon Central - Combined Annual Report - C47/2016 for the period 1 August 2018 to 31 July 2019, E38/02976, E |
| A116697 | 2018 | Stone Resources Australia Limited | Brightstar North | 2% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 19/05/2017 - 20/05/2018 |
| A117884 | 2018 | Regis Resources Limited | Duketon Central | 1.5% | Duketon Central C95/2016 Annual Report for the period 1 July 2017 to 30 June 2018 |
| A118049 | 2018 | Duketon Mining Limited | Duketon Central | 2.1% | Annual Report Duketon Central C47/2016 for the period 01/08/2017 - 31/07/2018 |
| A112788 | 2017 | Stone Resources Australia Limited | Brightstar North | 2% | Brightstar North C209/2006 Combined Annual Exploration Report for the period 01/01/2016 – 31/12/2016 |
| A114932 | 2017 | Regis Resources Limited | Duketon Central | 1.8% | Duketon Central Project C95-2016 Annual Report for the period 1 July 2016 to 30 June 2017 |
| A115072 | 2017 | Duketon Mining Limited | Duketon Central | 1.7% | Annual Report Duketon Central C47/2016 for the period 1 August 2016 to 31 July 2017, E38/02976, E38/03083, E38 |
| A109758 | 2016 | Regis Resources Limited | Duketon Central | 1.6% | Annual Report For the Period 1 July 2015 to 30 June 2016 DUKETON CENTRAL PROJECT C61/2003 |
| A109772 | 2016 | Duketon Mining Limited | Duketon | 6.1% | Duketon Project C47/2016 Annual Report For the Period 1 August 2015 to 31 July 2016, E 38/02976, E 38/03083 |
| A108839 | 2016 | Stone Resources Australia Ltd | Brightstar North | 1.8% | C209/2006 Combined Annual Exploration Report for period 01/01/2015 – 31/12/2015 |
| A104495 | 2015 | Duketon Mining Ltd | Duketon West | 4.8% | Surrender Report E38/2206 (Duketon West) for the period 23/11/2009 – 21/11/2014 |
| A105227 | 2015 | Stone Resources Australia Ltd | Brightstar North | 1.8% | Combined Annual Exploration Report for C209/2006 from 01/01/2014 to 31/12/2014, E38/1936.....P38/4115 |
| A106601 | 2015 | Regis Resources Limited | Duketon Central | 1.6% | C61-2003 2015A Duketon Central Project Annual Report for the period 01/07/2014 - 30/06/2015 |
| A102125 | 2014 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central E38/2002 Surrender Report for the period 12/09/2008 to 20/02/2014 |
| A102988 | 2014 | Regis Resources Ltd | Duketon Central | 1.6% | Duketon Central Project, Annual Report for the period 01/07/2013 to 30/06/2014, E38/378.........E38/2857; M38/ |
| A103266 | 2014 | Stone Resources Australia | E38/1937 | 4.4% | E38/1937 Partial Surrender Report for the period 08/08/2008 to 07/08/2014 |
| A101263 | 2014 | Stone Resources Australia | Brightstar North | 1.7% | Combined Annual Exploration Report for Brightstar North Project C209/2006 from 01/01/2013 to 31/12/2013, E 38/ |
| A97680 | 2013 | Stone Resources Australia | Brightstar North | 1.8% | CR209-2006 COMBINED ANNUAL EXPLORATION REPORT Reporting Period 1/01/2012 – 31/12/2012 |
| A98828 | 2013 | Regis Resources Ltd | Duketon Central | 1.8% | Annual Combined Group Report for the period 1 July 2012 to 30 June 2013 Duketon Central Project (C61/2003) E38 |
| A99150 | 2013 | South Boulder Mines Ltd | Duketon West | <1% | Surrender Report for E38/1979, Duketon West Project, for the Period 10th June 2008 to 9th June 2013 |
| A100800 | 2013 | Duketon Mining Ltd | Duketon West | <1% | Duketon West Project, Annual Report for the period 01/10/2012 to 30/09/2013, E38/1535, 1537, 1800, 2177, 2206, |
| A94597 | 2012 | Regis Resources Ltd | Duketon Central | 1.4% | Annual Combined Group Report for the period 1 July 2011 to 30 June 2012 Duketon Central Project C61/2003, E38/ |
| A96070 | 2012 | Independence Group Nl; South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007 “Duketon West” E38/1511, 1535, 1537, 1800, 1979, 2177, 2206, 2255, 2661, M38/1 |
| A92874 | 2012 | Regis Resources Ltd | Duketon Central | <1% | Duketon Central Project, Final Surrender Report for the period 24th May 2011 to 24th Novembe 2011, P38/3914. |
| A93088 | 2012 | Regis Resources Ltd | Duketon Central | 46% | SURRENDER REPORT FOR THE PERIOD 3 DECEMBER 2007 TO 24 NOVEMBER 2011 TENEMENT NO. E38/1074 OF DUKETON CENTRAL P |
| A89810 | 2011 | A1 Minerals Ltd | Bright Star North | 1.5% | Bright Star North Project C209/2006 Combined Annual Report for the period 01/01/2010 to 31/12/2010 |
| A91193 | 2011 | Regis Resources Ltd | Duketon Central | 1.5% | Annual Combined Group Report for the period 1 July 2010 to 30 June 2011, Duketon Central Project (C61/2003) |
| A92270 | 2011 | South Boulder Mines Ltd | Dukewest | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2010 to 30 Sept 2011 |
| A93427 | 2011 | A1 Minerals Ltd | Bright Star North | 1.8% | Bright Star North Project Combined Annual report for the period 01/01/2011 to 31/12/2011, C209/2006, E38/1936, |
| A86180 | 2010 | A1 Minerals Ltd | Brightstar North | 1.5% | Bright Star North Project C209/2006 Annual Combined Report for the period 01/01/2009 to 31/12/2009 |
| A87969 | 2010 | Regis Resources Ltd | Duketon | 1.3% | C61/2003 Duketon Central: Combined Annual Report On Exploration For The Period 1/07/2009 to 30/06/2010 |
| A88530 | 2010 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report for C99/2007, Duketon West Project, for the Period 1 Oct 2009 to 30 Sept 2010 |
| A81678 | 2009 | A1 Minerals Ltd | Bright Star North | 1.5% | Bright Star North Project, Annual Report for th eperuiod 01/01/2008 to 31/12/2008, E38/1368. 1375, 1563, 1618, |
| A84137 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | 1.3% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2008 TO 30/06/2009 PROJECT C61/2003 DUKETON CENTRAL |
| A80697 | 2009 | Regis Resources Ltd | DUKETON CENTRAL | 46% | Annual Report on Exploration for the period 3/12/2007 to 2/12/2008: Duketon Central E38/1074 |
| A79266 | 2008 | Regis Resources Ltd | DUKETON CENTRAL | 1.6% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 1/07/2007 TO 30/06/2008 PROJECT C61/2003 DUKETON |
| A85436 | 2008 | South Boulder Mines Ltd | Duketon West | <1% | Combined Annual Report C99/2007, Duketon West Project, for the period 1st Oct 2008 to 30th Sept 2009, E38/1499 |
| A76989 | 2008 | South Boulder Mines Ltd | Duketon | <1% | Combined Annual Report C99/2007, E38/1043,....E38/1801, M38/330, P38/3160....P38/3309, Duketon West, for the p |
| A75801 | 2007 | Regis Resources Nl | Duketon Central | 1.6% | Combined Annual Report On Exploration For The Period 1/7/200 5 to 30/6/2006; C61/2003 Duketon Central: E38/378 |
| A73284 | 2006 | Regis Resources Nl | Duketon Central | 2% | Combined Annual Report on exploration for the period 1/07/2005 to 30/06/2006, Project C61/2003 Duketon Central |
| A69760 | 2005 | Newmont Australia Ltd | Duketon | 1.5% | Combined annual report for the period 01/07/03 - 30/06/04 Duketon Central Project, C61/2003, E38/378, E38/379, |
| A70674 | 2005 | Newmont Australia Ltd | Duketon Central | 1.8% | Duketon Central Project,Final Surrender Report for the period to 10/03/2005 , E38/438, E38/567, & E38/585. |
| A70955 | 2005 | Newmont Duketon Pty Ltd | Duketon | 2% | Combined annual report on exploration for the period 1/07/2004 to 30/06/2005, Project C61/2003, Duketon Centra |
| A66600 | 2003 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 3.7% | Combined Annual Report on Exploration for period ended 17/3/2003 Project C16/1996 Erlistoun E38/379, 387, 565, |
| A64531 | 2002 | Newmont Yandal Operations Ltd | Duketon | <1% | Duketon Project, Annual Report for the period 1st January 2001 to 31st December 2001, E38/438, 440, 477, 567, |
| A64877 | 2002 | Newmont Australia Ltd | Duketon Belt/Erlistoun | 3.4% | Combined Annual Report On Exploration For Period Ended 17/3/2002 Project C16/1996 Erlistoun E38/379, 386, 387, |
| A62652 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.3% | Exploration Licences: E38/379, 386-7, 404, 565, 649, 651, 653, 843, 1189-92, 1196 Mining Leases: M38/114, 237, |
| A62782 | 2001 | Normandy Yandal Operations Ltd | Duketon | <1% | Annual Report for period ended 31 December 2000, E38/438, 440, 477, 567, 5 85, 630, 654 & P38/2715, 2716, 271 |
| A63672 | 2001 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3% | Exploration licences: E38/379, 386-387, 404, 565, 649, 651, 653, 789, 843, 1189-1192, 1196. Mining leases: M3 |
| A59621 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 4.2% | Amy Clarke (JV Project, Partial Surrender Report for the period 16/11/1993 to 02/08/1999, E38/566 |
| A60613 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Amy Clarke JV, Annual Report for the Period 1/12/1998 to 30/11/1999, E38/496, E38/566, E38/598, P38/2486-9, P3 |
| A61966 | 2000 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.1% | C16/1996 - Erlistoun Joint Annual Report for the period 18 March 1999 to 17 March 2000. Gold mining lease: GM |
| A63219 | 2000 | Sons Of Gwalia Ltd | Amy Clarke | 3% | Amy Clarke Project, Surrender Report for the period 5 January 1993 to 28 September 2000, E38/496, 566, 598; P |
| A57805 | 1999 | Johnsons Well Mining Nl | Texrise Duketon No 1 | 1.1% | Texrise Duketon No 1 Project, Partial Surrender Report for the period 2nd December 1994 to 10th Sept 1998, E38 |
| A59200 | 1999 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.2% | Joint Annual Report on the Erlistoun Project, E38/379, 386- 387, 404, 565, 649, 651, 653, 789, M38/114, 237, 2 |
| A54026 | 1998 | Wiluna Mines Ltd | Duketon | 25% | Duketon Project, Partial Reliquishment Report to Dept of Minerals and Energy Exploration Licence E38/509. |
| A54261 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Amy Clarke JV Project Annual report for the period 01/12/96-30/11/97 Tenements E38/496,566,598 P38/2486-2489,2 |
| A55359 | 1998 | Sons Of Gwalia Ltd | Baneygo | <1% | Baneygo Project Annual report for the period 01/01/97- 31/12/97 Tenements EL38/545 EL38/547 EL38/665 EL38/667 |
| A55392 | 1998 | Johnsons Well Mining Nl | Duketon Belt/Erlistoun | 3.3% | Exploration Licences E38/379 E38/386 to E38/387 E38/565 E38/649 E38/651 E38/653 Mining Leases M38/114 M38/237 |
| A56181 | 1998 | Sons Of Gwalia Ltd | Baneygo | 3.2% | Baneygo Project, Partial Surrender Report E38/547 24/09/93 - 09/07/98 |
| A56182 | 1998 | Sons Of Gwalia Ltd | Amy Clarke | 4.2% | Amy Clarke J.V. Project, Partial Surrender Report 16/11/93 - 02/04/98 E38/566. |
| A50928 | 1997 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region Baneygo Project Annual report for the period 1 January 1996 to 31 December 1996 Tenements E38/ |
| A50167 | 1997 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Laverton Region Amy Clarke Joint Venture Project Annual report for the period 1 December 1995 to 30 November 1 |
| A50341 | 1997 | Aurora Gold Ltd | Baneygo | 36% | Annual Technical Report Baneygo Project Western Australia Mining Leases M38/237 M38/250 M38/319 M38/343 and M3 |
| A50419 | 1997 | Wiluna Mines Ltd | Duketon | 1.4% | Duketon Project, Annual Report for the year ending 31/12/1996, E38/438 ,440, E38/477 E38/509 E38/567 E38/585 E |
| A50637 | 1997 | Sons Of Gwalia Ltd | Baneygo | 3.2% | Partial Surrender Report for the period 24 November 1993 - 23 November 1996 |
| A53944 | 1997 | Wiluna Mines Ltd | Duketon Project | 1.4% | Duketon Project, 1997 Annual Report Exploration Licence: 38/438, 440, 477, 509, 567, 585, 630, 38/654 Prospect |
| A46725 | 1996 | Johnsons Well Mining Nl | Kulguddi | <1% | Exploration E38/649 and E38/653 'Kulguddi Project' Annual report for the period 2 December 1994 to 1 December |
| A47320 | 1996 | Wiluna Mines Ltd | Duketon | 1.6% | Duketon Project, Annual Report for the period 1st January 1995 to 31st December 1995, E38/438, E38/440, E38/4 |
| A47561 | 1996 | Johnsons Well Mining Nl | Duketon Belt 4 | <1% | Duketon Belt 4 (JV) Project, Annual Report for the period 10th February 1995 to 9th February 1996, E38/559. 64 |
| A47739 | 1996 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region North Eastern Goldfields Baneygo Project Annual report for the period 1 January 1995 to 31 Dec |
| A44346 | 1995 | Wiluna Mines Ltd | Duketon | 1.6% | Duketon Project, Annual Rreport for the period January 1st 1994 to December 31st 1994. E38/438, 440, 477, 509, |
| A45519 | 1995 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region Northeastern Goldfields Baneygo project Annual report for the period 01 January 1994 to 31 Dec |
| A43675 | 1995 | Aurora Gold Ltd | Baneygo | 36% | Annual Technical Report Baneygo Project Western Australia Mining Lease M38/237 M38/250 M38/319 M38/343 and M38 |
| A47328 | 1995 | Sons Of Gwalia Ltd | Amy Clarke | 2.8% | Amy Clarke (JV) Project, Annual report for the period 1 December 1994 to 30 November 1995 E38/496 E38/566 E38 |
| A47471 | 1995 | Aurora Gold Ltd | Baneygo | 36% | H477 Baneygo Project Western Australia Annual Technical Report Mining Leases M38/237 M38/250 M38/319 M38/343 a |
| A43247 | 1994 | Sons Of Gwalia Ltd | Laverton | <1% | Laverton Region North Eastern Goldfields Baneygo Project Interim Report to 23 September 1994 Tenements:E38/545 |
| A40715 | 1994 | Aurora Gold Ltd | Baneygo | 35% | Annual Technical Report Baneygo Project WA Mining Leases M38/237, M38/250, M38/319, M38/343, M38/344, Prospect |
| A40430 | 1993 | Asarco Australia Ltd | Duketon Project | 1.1% | Annual report for the period 01/01/93-31/12/93 Duketon Project E38/438 E38/440 E38/477 E38/509 |
| A35655 | 1992 | Ashton Gold Wa Ltd | Baneygo | 37% | Annual Technical Report Baneygo Project Mining Leases M38/111, M38/190, M38/195, M38/237, M38/238, M38/277, M3 |
| A39436 | 1992 | Ashton Gold Wa Ltd | Baneygo | 37% | Annual Technical Report Baneygo Project Mining Leases M38/111, M38/190, M38/195, M38/237, M38/238, M38/277, M3 |
| A33545 | 1991 | Ashton Gold Mines Pty Ltd | Baneygo | 37% | Annual technical report Baneygo Project M38/111 M38/190 M38/195 M38/237 M38/238 M38/277 M38/278 M38/280 E38/70 |
| A10686 | 1982 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the period 10/12/1980 to 08/12/1981, MC38/6941-6966, 7096-7106, 7110-7 |
| A2706 | 1981 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report:Exploration Report , Miscellaneous Maps & Plans, November 19 |
| A10253 | 1981 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the period 12th December 1979 to 9th December 1980, MC38/6941-6966... |
| A8238 | 1979 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hil Project, Annual Report for the period 14th December 1977 to 12th December 1978, MC38/6941-6966, 7 |
| A9337 | 1979 | Carpentaria Exp Co Pty Ltd | Ogilvies | 3.5% | Ogilvies Project, Non-statutory Report: An Econcomic Assessment of the Ogilvies Mineral Claims, April 1979, MC |
| A7426 | 1978 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the period 1st July 1976 to 13th December 1977, MC38/6941-6966, 7096- |
| A6690 | 1976 | Western Mining Corporation Ltd | Swanson Hill | <1% | Swanson Hill Project, Annual Report for the year ending 29th June 1976, MC38/6941-6966 & 7096-7106. |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2470 | 1972 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Final Report, April 1972, TR70/3813, 4490 & 4492H. |
| A2694 | 1972 | Cominco Exploration Pty Ltd | Erlistoun -Baneygo | <1% | Erlistoun - Baneygo Project, Final Surrender Report for the period ending 09/02/1972, TR70/3813H. |
| A9159 | 1972 | Cominco Exploration Pty Ltd | Erlistoun- Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report:Exploration Report for the period 01/01/1971 to 31/12/1971, TR |
| A9156 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo (JV) Project, Non-statutory Report:Progress Report for the period 31st May 1970 to 1st Ja |
| A2707 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Non-statutory Report: Miscellaneous Plans (25) for Baneygo-King of Creation, for |
| A9157 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun - Baneygo Project, Annual Report for the period 01/01/1970 to 31/12/1970, TR70/3813; MC38/3917...... |
| A9158 | 1971 | Cominco Exploration Pty Ltd | Erlistoun - Baneygo | <1% | Erlistoun-Baneygo (JV) Project, Non-statutory Report, Progress Report for the period 01/01/1971 to 30/06/1971, |
| A1118 | 1969 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1969, TR70/3 |
| A1112 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Report on the Induced Polarization & Resistivity Survey on Th |
| A1113 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps & Magnetic Anomalies, December |
| A1114 | 1968 | Cominco Exploration Pty Ltd | Erlistoun | <1% | Erlistoun Project, Non-statutory Report: A Review of Activities to March 21st 1968, TR70/ 3813, 3899, 4490-449 |
| A1115 | 1968 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Quarterly Report for the period ending 30th June 1968, TR70/3 |
| A1110 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report Progress Report for the period 01/09/1966 to 31/03/1967, TR70/ |
| A1111 | 1967 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: Geological & Geochemical Maps, December 1966 to April 1967,TR |
| A1117 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project: |
| A1119 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Non-statutory Report: |
| A1120 | 1753 | Cominco Exploration Pty Ltd | Erlistoun-Baneygo | <1% | Erlistoun-Baneygo Project, Annual Report for the period ending 30th June 1970, TR70/3813, 4490 & 4492H |
| A7981 | 1753 | Amax Iron Ore Corporation | Ogilvies | 1.7% | Ogilvies (JV) Project, Non-statutory Report: Final Report, July 1978, MC38/7295-7296, 7320, 7360, 7363, 7389-7 |
| A12355 | 1753 | Chevron Exploration Corp | Erlistoun base | 8.7% | Erlistoun, MC38/8064-38/8096 Inc. MC38/8244, EL 38/9. Annual Report. November 1981-December 1982 |
| A14502 | 1753 | Chevron Exploration Corp | Erlistoun base | 8.7% | Chevron Exploration Corporation Annual Report - MC 38/8096 Terminal Report- EL 38/9 and MC 38/8224 Mt Margaret |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A50779 | 1753 | Johnsons Well Mining Nl | Duketon Belt 4 | <1% | Exploration Licences E38/559 E38/649 E38/653 and Prospecting Licences P38/2558 to P38/2561 'Duketon Belt 4 Pro |
| A51381 | 1753 | Johnsons Well Mining Nl | Erlistoun | 55% | Mining Licences M38/343 M38/344 'Erlistoun' Annual report for the period 23 April 1996 to 22 April 1997 |
| A153748 | Regis Resources Limited | Duketon | 99% | Drilling Files for Regis Resources Donated Drillhole RRLBYDD022 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 38/344 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 38/344? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.