M 39/1101
M 39/1101 is a live mining lease in the Shire of Leonora, Western Australia, held by Atoz Gold Pty Ltd. Granted on 19 May 2016 for 21 years, it expires on 18 May 2037. The ground is covered by 97 historical WAMEX reports.
Register summary
- Holder
- Atoz Gold Pty Ltd
- Local government
- Shire of Leonora
- Application received
- 22 Sept 2015
- Commenced
- 19 May 2016
- Expiry
- 18 May 2037
- Term
- 21 Years
The full record on M 39/1101
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 4 changes of holder
- The full record: 11 years of expenditure, 36 conditions and 12 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (8 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A131354 | 2022 | Sgmb Resources Pty Ltd | Zelica | 11% | Final Surrender Report for E 39/1897 Zelica Project for the period ending 22/04/2022. |
| A123525 | 2020 | Gme Resources Ltd | Eucalyptus Bore | 1.6% | Annual Report Eucalyptus Bore, C89/2000, 1 March 2019 to 29 February 2020 |
| A124549 | 2020 | Gme Resources Ltd | Eucalyptus Bore | 6.1% | Surrender Report E39/1859 Eucalyptus Bore project for the period 1 September 2015 to 30 June 2020 |
| A123204 | 2020 | Sgmb Resources Pty Ltd | Zelica | 22% | Zelica Project C 34/2014 Combined Annual Report for the period 1 January 2019 to 31 December 2019, E39/01897, |
| A118944 | 2019 | Matsa Resources Limited | Zelica | 22% | Zelica C34/2014 Combined Annual Report for the period 1 January 2018 to 1 January 2019, M39/01101, E39/01897 |
92 more reports
| A119868 | 2019 | Gme Resources Ltd | Eucalyptus Bore | 1.3% | Annual Report Eucalyptus Bore Project C89/2000 for the period 1 March 2018 to 28 February 2019 |
| A115821 | 2018 | Anova Metals Limited | Zelica | 22% | Zelica Project C34/2014 Combined Annual Report for the period 1 January 2017 to 31 December 2017, E39/01897, M |
| A116606 | 2018 | Gme Resources Ltd | Eucalyptus Bore | 1.3% | Eucalyptus Bore Annual Report, C89/2000, 01 March 2017 to 28 February 2018 |
| A112287 | 2017 | Exterra Resources Limited | Zelica | 22% | C34/2014 Zelica Project Combined Annual Report for the period 1 January 2016 to 31 December 2016, E39/01897, M |
| A114092 | 2017 | Exterra Resources Limited | Zelica - Eucalyptus | 86% | Zelica - Eucalyptus Project M 39/00292 (C123/2007) Final Surrender Report for the period 1 September 1993 to 2 |
| A112642 | 2017 | Gme Resources Ltd | Eucalyptus Bore | 1.3% | Annual Report Euclayptus Project C89/2000 For the Period 1 March 2016 to 28 February 2017, M39/00289, E39/0179 |
| A110179 | 2016 | Gme Resources Ltd | Eucalyptus Bore | 6.1% | Annual Report E39/1859 Eucalyptus Bore for the period 2 September 2008 to 1 September 2016 |
| A107887 | 2016 | Exterra Resources Ltd | Zelica | 41% | Zelica Project C34/2014 Annual Report for the period 01/01/2015 to 31/12/2015, M39/1082, E39/1627, P39/4566, P |
| A108618 | 2016 | Gme Resources Ltd | Eucalyptus | <1% | Eucalyptus Annual Report C89/2000 for the period 1 March 2016 to 28 February 2016,M 39/00289, E39/01795, M39/0 |
| A105477 | 2015 | Exterra Resources Ltd | Zelica | 41% | Zelica Project C34/2014, M39/1082, E39/1627, P39/4566 Combined Annual Report for the period 1st January 2014 t |
| A105556 | 2015 | Gme Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project C89/2000 Annual Report for the period 01/03/2014 to 28/02/2015, M39/289, M39/313, M39/ |
| A106565 | 2015 | Exterra Resources Ltd | Eucalyptus | 86% | Eucalyptus Project M39/292 Annual Report for the period 30/06/2014 to 29/06/2015 |
| A106566 | 2015 | Exterra Resources Ltd | Eucalyptus | <1% | Eucalyptus P39/4556 Annual Report for the period 1st July 2014 to 30th June 2015 |
| A106802 | 2015 | Murrin Murrin Operations Pty Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project M39/818 for the period 11 August 2014 to 10 August 2015 |
| A103534 | 2014 | Murrin Murrin Operations Pty Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project, M39/818 For the period: 11 August 2013 to 10 August 2014 |
| A101966 | 2014 | Gme Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project C89/2000 Annual Report 2014 for the period 1st March 2013 to 28th February 2014, M39/2 |
| A102332 | 2014 | Exterra Resources Ltd | Zelica | 100% | Zelica Project M39/1082 Annual Report for the period 24th April 2013 to 23rd April 2014 |
| A98026 | 2013 | Exterra Resources Ltd | Zelica | 100% | ANNUAL REPORT FOR THE PERIOD 24th April 2012 to 23rd April 2013 Zelica M39/1082 |
| A98865 | 2013 | Exterra Resources Ltd | Eucalyptus | <1% | Annual Report for the period 1st July 2012 to 30th June 2013 Eucalyptus P39/4556 |
| A99468 | 2013 | Exterra Resources Ltd | Zelica | 93% | Zelica / Eucalyptus Project P39/4566 Annual Report 28th September 2012 to 27th September 2013 |
| A99571 | 2013 | Minara Resources Pty Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project, M39/818 for the period 11 August 2012 to 10 August 2013 |
| A99774 | 2013 | Gme Resources Ltd | Eucalyptus Bore | <1% | 2013 Surrender Report for Eucalyptus Bore M39/804, M39/570, M39/616, M39/665 for the period 30th March 2005 – |
| A97518 | 2013 | Gme Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project, Annual Report for the period 1st March 2012 to 28th February 2013, M39/289, 313, 344, |
| A95742 | 2012 | Exterra Resources Pty Ltd | Zelica | 93% | Annual Report Zelica Project P39/4566 for the period 28th September 2011 - 27th September 2012 |
| A94741 | 2012 | Exterra Resources Pty Ltd | Eucalyptus | <1% | Annual Report for the period 1st July 2011 to 30th June 2012 Eucalyptus P39/4556 |
| A93685 | 2012 | Gme Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project Combined Reporting Group C89/2000 2012 Annual Report. Retorting Period: 1st March 201 |
| A94744 | 2012 | Exterra Resources Pty Ltd | Zelica - Eucalyptus | 86% | Annual Report for the period 30th June 2011 to 29th June 2012 Eucalyptus Project M39/292 C 123/2007 |
| A95643 | 2012 | Minara Resources Ltd | Eucalyptus | <1% | Annual Report, Eucalyptus Project, M39/818 for the period 11 August 2011 to 10 August 2012 |
| A92774 | 2011 | Exterra Resources Pty Ltd | Zelica - Mount Egerton | 35% | ANNUAL REPORT FOR THE PERIOD 15th Dec 2010 to 14th Dec 2011 MOUNT EGERTON E39/1578 |
| A90216 | 2011 | Gme Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project, Annual Report for the period 1st March 2010 to 28th February 2011, M39/289, 313, 344, |
| A91537 | 2011 | Minara Resources Ltd | Eucalyptus | <1% | Annual Technical Report for the Period 11 August 2010 to 10 August 2011, Eucalyptus Project, M39/818 |
| A88083 | 2010 | Minara Resources Ltd | Eucalyptus | <1% | Annual Technical Report for M39/818 - Eucalyptus Report Period: 11 August 2009 to 10 August 2010 |
| A86606 | 2010 | Gme Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project Combined Reporting Group C89/2000 2009-2010, Annual Report for 1st March 2009 to 28th |
| A87241 | 2010 | Regal Resources Ltd | Zelica | 93% | Combined Annual technical Report M 39/115, M 39/292 Zelica Gold Project, period 1st September 2008 to 31st Aug |
| A84268 | 2009 | Minara Resources Ltd | Eucalyptus | <1% | Eucalyptus First Annual Technical Report M39/818, Reporting Period 11 August 2008 to 10 August 2009 |
| A81887 | 2009 | Gme Resources Ltd | EUCALYPTUS BORE | <1% | EUCALYPTUS BORE PROJECT COMBINED REPORTING GROUP C89/2000 2009 ANNUAL REPORT, Reporting Period: 1st March 2008 |
| A79420 | 2008 | Regal Resources Ltd | Zelica | 51% | Combined Annual Technical Report M39/115, P39/2819 Zelica Gold Project Period 1st Sept 2007 to 31st Aug 2008 C |
| A78536 | 2008 | Niwest Ltd | Eucalyptus Bore | <1% | ANNUAL REPORT FOR THE PERIOD 01 MARCH 2007 TO 29 FEBRUARY 2008 EUCALYPTUS BORE PROJECT Combined Report C89/200 |
| A79388 | 2008 | Regal Resources Ltd | Eucalyptus | 86% | Annual Technical Report M39/292 Eucalyptus Period 1st September, 2007 to 31st August 2008 |
| A74999 | 2007 | Regal Resources Ltd | Zelica Gold | 100% | Annual Technical Report, M39/115, Zelica Gold Project, Period 13th May 2006 to 12th May 2007. |
| A75237 | 2007 | Niwest Ltd | Eucalyptus Bore | <1% | Eacalyptus Bore Project M39/289, 313, 344, 430, 568, 570, 616, 665, 666, 674, 802, E39/703 and 480 Annual Tech |
| A75547 | 2007 | Regal Resources Ltd | Eucalyptus | 86% | Annual Technical Report M39/292 Eucalyptus Period 1st September 2006 to 31st August 2007 |
| A72598 | 2006 | Niwest Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project E39/480,703,M39/289,313,344,430,568, 570,616,665,666,674,802, Annual Technical & Progr |
| A73476 | 2006 | Regal Resources Ltd | Eucalyptus | 86% | Annual Technical Report, M39/292 Eucalyptus, Period 1 September 2005 to 31 August 2006, (Edjudina). |
| A72417 | 2006 | Regal Resources Ltd | Zelica Gold | 100% | Annual Technical Report, M39/115 Zelica Gold Project, Period 13 May 2005 to 12 May 2006 |
| A69837 | 2005 | Regal Resources Ltd | Eucalyptus | 97% | Annual report for the period 09/11/03 - 08/11/04 Eucalyptus Project, P39/3938, Leonora |
| A68635 | 2004 | Vector Resources Ltd | Eucalyptus | 100% | Annual report, Eucalyptus Project M39/115, Period 13/05/2003-12/05/2004. |
| A69300 | 2004 | Regal Resources Ltd | Eucalyptus | 86% | Annual report for the period 01/09/2003-30/08/2004 Eucalyptus Project M39/292 |
| A69454 | 2004 | Gme Resources Ltd | Eucalyptus | 2.3% | Annual technical report for the period 01/03/03 - 28/02/04 Eucalyptus Project, C89/2000, E39/256, E39/386, E39 |
| A70722 | 2004 | Gme Resources Ltd | Eucalyptus Bore | <1% | Eucalyptus Bore Project (part) E39/256, M39/313, M39/289, P39/2444-2446, Annual technical & Progress report fo |
| A66616 | 2003 | Niwest Ltd | Eucalyptus | 2.3% | Annual Technical & Progress Report for the 12 month period ended 28 February 2003 Eucalyptus Project C89/2000: |
| A64615 | 2002 | Niwest Ltd | Eucalyptus | 2.3% | Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P |
| A61517 | 2001 | Newcrest Mining Ltd | Yundamindra | <1% | Yundamindra Option E39/373, Report covering Exploration during the period 30/8/1999 to 29/8/2000. |
| A62627 | 2001 | Niwest Ltd | Eucalyptus | 2.3% | Eucalyptus Project: E39/256, E39/386 & E39/368 M39/313 & M39/289 P39/2692 & P39/2444-2446 Annual Technical & P |
| A63333 | 2001 | Newcrest Mining Ltd | Yundamindra Option | <1% | Annual Report Yundamindra Option For The Period 01/9/2000 to 31/8/2001 E39/373 GSWA Reference No: M7273/1 Repo |
| A60724 | 2000 | Jarrahmond Holdings Pty Ltd | Eucalyptus | 100% | Euclyptus gold Project Western Australia Annual Report for the period 13/05/1999 to 12/05/2000 Mining Lease No |
| A60872 | 2000 | Western Metals Ltd | Eucalyptus | 3.2% | Eucalyptus Project: E39/256,313, P39/2692,2444-2446 and E39/38, Annual Technical & Progress Report for the 12 |
| A58091 | 1999 | Western Metals Ltd | Eucalyptus | 3.2% | Eucalyptus Project ,M39/313, E39/256, 386, P39/2444-2446, 2692 Annual Report for the period 01/03/98 to 28/02 |
| A53504 | 1998 | Jubilee Gold Mines Nl | Yundamindra | <1% | Sir Samuel Mines NL Combined Annual Report for E39/373 M39/302 M39/323 and M39/324 Yundamindra Project 01/10/ |
| A54234 | 1998 | Aberfoyle Resources Ltd | Eucalyptus Bore | 3.2% | Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 E39/386 Annual Report for the 12 |
| A56409 | 1998 | Jubilee Gold Mines Nl | Yundamindra | <1% | Yundamindra Project C288/1993 01/10/97 - 30/09/98 E39/373, M39/302 . |
| A50650 | 1997 | Aberfoyle Resources Ltd | Eucalyptus Bore | 3.2% | Eucalyptus Bore Nickel Project E39/256 M39/313 P39/2692 P39/2444 to P39/2446 and E39/386 annual technical repo |
| A59013 | 1997 | Eucalyptus Gold Mines Pty Ltd | Eucalyptus | 86% | Eucalptus Gold Project Western Australia Annual Report for the period 30/08/98-29/08/99 Mining Lease 39/292 |
| A47464 | 1996 | Aberfoyle Resources Ltd | Eucalyptus Bore | 3.2% | Eucalyptus Bore Project, Annual report on Exploration for the period 01/03/1995 to 29/02/1996 for E39/256 M39/ |
| A48473 | 1996 | Sir Samuel Mines Nl | Yundamindra | <1% | Annual Report Yundamindra C288/1993 P39/2963 M39/322 to M39/324 M39/302 E39/372 E39/373 E39/443 November 1995 |
| A43519 | 1995 | Mining Project Investors Pty Ltd | Eucalyptus Bore | 3.2% | Annual Technical Report on Eucalyptus Bore Project Mount Morgans District Mount Margaret Mineral Field for the |
| A41410 | 1994 | Mining Project Investors Pty Ltd | Eucalyptus Bore | <1% | Annual report for the period ending 17/03/94 Eucalyptus Bore Project E39/256 P39/2444-2446 P39/2692 |
| A42700 | 1994 | Sir Samuel Mines Nl | Yundamindra | <1% | Yundamindra E39/283 E39/372 E39/373 E39/443 P39/2391 P39/2405 to P39/2411 P39/2425 P39/2461 P39/2569 P39/2746 |
| A38145 | 1993 | Mim Exploration Pty Ltd | Eucalyptus South | <1% | Annual report for the period 12/91-12/92, Eucalyptus South Project , E39/256 P39/2444 P39/2445 P39/2446 |
| A39061 | 1993 | Nippon Mining Of Aust Pty Ltd | Eucalyptus | 25% | Annual Report Eucalyptus Gold Project Mt Margaret Goldfield (M39/56, M39/115, M39/181, M39/187, P39/2214) (for |
| A39632 | 1993 | Sir Samuel Mines Nl | Yundamindra | 1.5% | Annual Report for the Period 01/09/92 - 01/11/93 Yundamindra Project. |
| A35445 | 1992 | Mim Exploration Pty Ltd | Eucalyptus South | <1% | Annual Report for the Period 18/12/90 - 17/12/91 ,Eucalyptus South Project ,P39/2444-2446. |
| A39060 | 1991 | Nippon Mining Of Aust Pty Ltd | Eucalyptus | 25% | Annual Report Eucalyptus Gold Project Mt Margaret Goldfield (M39/56, M39/115, M39/181, M39/187, P39/2214) (for |
| A33213 | 1991 | Carpentaria Exp Co Pty Ltd | Eucalyptus South | <1% | Eucalyptus South Project, E39/256 Annual Report for the Period Ending 10/04/91. |
| A29938 | 1989 | Jarrahmond Holdings Pty Ltd | Eucalyptus | <1% | Quarterly Report on the Eucalyptus JVPr oject, 25/08/89 - 24/11/89 (R Report; GML39/982; M39/56,181-182,187) |
| A25363 | 1988 | Jarrahmond Holdings Pty Ltd | Eucalyptus | 13% | Eucalyptus Gold Project, Annual report, November 1988, M39/56, M39/114-115, M39/178182, M39/187, GML39/982, P3 |
| A7643 | 1978 | Australian Selection Pty Ltd | Eucalyptus | <1% | Eucalyptus Project, Non-statutory Report: Final Report for period ending 16/12/1975, MC39/11, 14, 19, 38-40, 4 |
| A5111 | 1974 | Australasian Minerals Inc | Yundamindera | 1.6% | Report [non-statutory] on 1973 exploration at Yundamindera, MC39/4328 ... 39/4371 |
| A5112 | 1974 | Australasian Minerals Inc | Yundamindera | 1.6% | Report [non-statutory] on exploration of Yundamindera Prospect, January to June 1974, MC39/4328 ... 39/4371 |
| A21566 | 1974 | Alcoa Of Australia Ltd | Yundamindera - Carlow Castle | 1.6% | Yundamindera Project, [Non-statutory report, MC39/4328 ... 4371, corresponds with A5111 & A5112], April 1974 |
| A1415 | 1971 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | <1% | Pyke Hill - Eucalyptus Project, Non-statutory Report:Index to Plans, Soil Geochemistry & Geology Grids ( for o |
| A1414 | 1971 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | <1% | Pyke Hill - Eucalyptus Project, Annual Report (s) for the period(s) ending 31/12/1970 & 31/12/1971, TR70/3701 |
| A2486 | 1971 | Newmont Pty Ltd | Eucalyptus North | 13% | Eucalyptus North (JV) Project, Non-statutory Report:Exploration Report, June1971, MC39/478-479, 498, 550, 578- |
| A2480 | 1971 | Newmont Pty Ltd | Eucalyptus South | <1% | Eucalyptus South (JV) Project, Final Surrender Report, June 1971, MC39/524-527, 594-596 & 2259. |
| A1412 | 1969 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | <1% | Pyke Hill - Eucalylptus Project, Annual Report [s] for the periods ending 31/12/1968 & 31/12/1969, TR3701 & 37 |
| A12748 | 1969 | Kia Ora Gold Corp Nl | Mount Keith | <1% | Geological report Mount Keith Nickel Prospect Leonora WA |
| A1409 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | 1.8% | Pyke Hill - Eucalyptus Project, Non-statutory Report: Progress Report, with Grid Index & Index to Maps, 1966, |
| A1410 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | <1% | Pyke Hill - Eucalyptus Project, Annual Report: Report of Investigations for the period 15th August 1967-12th O |
| A1411 | 1967 | Australian Selection Pty Ltd | Pyke Hill - Eucalyptus | <1% | Pyke Hill - Eucalyptus Project, Non-statutory Report: Grid & Geology Sheets, December 1967, TR70/3748H |
| A1590 | 1965 | Mount Margaret Prospecting Syndicate | Yundamindera | <1% | Yundamindera Project, Non-statutory Report: Report on 78 Gold Products received 13th August 1964, TR70/2685, 2 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A70147 | 1753 | Regal Resources Ltd | Eucalyptus | 51% | Annual Report Eucalyptus Project M39/292, 115, P39/2819 Period 01/01/2004-31/12/2004 (C22/2005) |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 39/1101 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 39/1101? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-09. Compiled by NextMaps. Verify against primary sources before reliance.