M 39/794
Register summary
- Holder
- Second Fortune Gold Project Pty Ltd
- Local government
- Shire of Leonora
- Application received
- 20 July 2000
- Commenced
- 8 July 2008
- Expiry
- 7 July 2029
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A122817 | 2020 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway (C145/2018) Annual Group Report for the period ending 31/12/2019 |
| A122827 | 2020 | Matsa Resources Limited | Red October | <1% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A124881 | 2020 | Anova Metals Australia Pty Ltd | Linden | 11% | Combined Annual Report Linden Project C37/2009 for the period ending 05/07/2020 |
| A119201 | 2019 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119510 | 2019 | Matsa Resources Limited | Red October | <1% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
93 more reports
| A121020 | 2019 | Anova Metals Australia Pty Ltd | Linden | 9.1% | Combined Annual Report-Linden Project-C37/2009 For the Period 6 July 2018 to 5 July 2019, E39/01539, E39/01977 |
| A115990 | 2018 | Saracen Gold Mines Pty Limited | Red October | <1% | Red October Project (C173/2017) Annual Report for the Period 1 January to 31 December 2017, M 39/00411, M39/00 |
| A117439 | 2018 | Anova Metals Australia Pty Ltd | Linden | 6.1% | Combined Annual Report-Linden Project-C37/2009 for the period 6 July 2017 to 5 July 2018, E39/01232, E39/01539 |
| A112356 | 2017 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project (C8/2016) – Volume II Annual Report for the Period 1 January to 31 December 2016, E39/014 |
| A114643 | 2017 | Exterra Resources Limited | Linden | 6.1% | C37/2009 Linden Project Combined Annual Report for the period 6 July 2016 to 5 July 2017, E39/01232, E39/01539 |
| A114745 | 2017 | Saracen Gold Mines Pty Limited | Butcher Well | <1% | Exploration License 39/1487 Butcher Well Project Final Surrender Report for the Period 9 March 2010 to 14 July |
| A108161 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well - Mount Minnie- Mount Flore | <1% | VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015, |
| A108266 | 2016 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mount Howe Project (C222/2007) Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/949, E |
| A108953 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Exploration License 39/1487 Butcher Well Partial Surrender Report for the Period 9 March 2010 to 8 March 2016 |
| A109747 | 2016 | Exterra Resources Limited | Linden Project | 6.1% | Linden Project Annual Report on C37/2009, 6 July 2015 to 5 July 2016 |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A106668 | 2015 | Exterra Resources Ltd | Linden | 6.4% | C37/2009 Linden Project Combined Annual Report for the period 6th July 2014 to 5th July 2015, E39/1232, E39/15 |
| A105467 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I |
| A101784 | 2014 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A97466 | 2013 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007. |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A98420 | 2013 | Exterra Resources Ltd | Linden | 7% | Linden Project Combined Annual Report for the period 6th July 2012 to 5th July 2013, E39/1232, E39/1539, M39/2 |
| A93583 | 2012 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011 |
| A93045 | 2012 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011 |
| A94894 | 2012 | Exterra Resources Pty Ltd | Linden | 7% | Annual Report for the Period 6th July 2011 to 5th July 2012. LINDEN COMBINED REPORTING GROUP, C37/2009, |
| A103026 | 2012 | Exterra Resources Ltd | Linden | 6.1% | Linden Project, Combined Annual Report for the period 06/07/2013 to 05/07/2014, E39/1232, 1539, 1754; M39/255, |
| A89379 | 2011 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010 |
| A89855 | 2011 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project Annual Report for the period 01 January 2010 to December 2010 |
| A86442 | 2010 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993) |
| A88147 | 2010 | Exterra Resources Pty Ltd | Linden | 8.5% | Annual Report for Linden Combined Reporting Group Report C37/2009 from 06/07/2009 to 05/07/2010 |
| A91171 | 2010 | Exterra Resources Pty Ltd | Linden | 8.5% | Annual Report for the Period 6th July 2010 to 5th July 2011. Linden Combined Reporting Group, C37/2009, M39/25 |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A77151 | 2008 | Haoma Mining Nl | Linden | <1% | Linden Project Annual Project for the period 19 SEPTEMBER 2006 - 18 SEPTEMBER 2007 E39/293 REPORT NO: 07-02-2 |
| A74099 | 2007 | Haoma Mining Nl | Linden | <1% | Linden Project, Annual Report for the Period 19 Sept 2005 - 18 Sept 2006, E39/293, Report No.07-02-2006-01 (E |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A76647 | 2007 | Haoma Mining Nl | Linden | 10% | LINDEN PROJECTANNUAL REPORT FOR THE PERIOD 28 JULY 2006 - 27 JULY 2007, E39/379 (Edjudina) |
| A71798 | 2006 | Haoma Mining Nl | Linden | 10% | Linden Project, Annual Report for the period 27 July 2004 to 26 July 2005, E39/379, (Haoma Mining Report No. 0 |
| A71794 | 2006 | Haoma Mining Nl | Linden | <1% | Linden Project, Annual Report for the period 19 September 2004 to 18 September 2005, E39/293, (Haoma Mining Re |
| A72847 | 2006 | Haoma Mining Nl | Linden | 10% | Linden Project Annual Report for the Period 27 July 2005 to 26 July 2006, E39/379,(Haoma Mining Report No. 07 |
| A69831 | 2005 | Haoma Mining Nl | Linden | <1% | Exploration Licence E39/293, Linden Project , Annual Report for the period Sept/2003 to Sept/2004 |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A69833 | 2005 | Haoma Mining Nl | Linden | 10% | Exploration Licence E39/379, Linden Project - Mt Margaret Goldfield, Annual Report for the period Sept/2003 to |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A66524 | 2003 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423, |
| A67763 | 2003 | Haoma Mining Nl | Linden | <1% | E39/293, Linden Project - Mt Margaret Goldfield, Annual Review, for the period ending 18/11/2003. |
| A67761 | 2003 | Haoma Gold Mines Nl | Linden | 10% | E39/379, Linden Project - Mt Margaret Goldfield,Annual Review, for the period ending 29/09/2003. |
| A64070 | 2002 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344, |
| A65531 | 2002 | Elazac Mining Pty Ltd | Linden | 6.9% | Linden Project, Annual Report for the period 5/5/2001 to 5/5/2002, E39/293, 397 & 429. |
| A62854 | 2001 | Sons Of Gwalia Ltd | Camelback / Butcher Well / Linden | <1% | Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3 |
| A63283 | 2001 | Haoma Mining Nl | Linden | 6.9% | Linden Project, E39/293, E39/379, E39/428 and M39/255 ,Annual Report for the period 30th June 2000 to 30th Jun |
| A59636 | 2000 | Goldfields Exploration Pty Ltd | Linden | 6.9% | Linden Project, E39/293,379,428, M39/255, Annual Report 01/0 5/1998 to 30/04/1999. |
| A60712 | 2000 | Goldfields Exploration Pty Ltd | Linden | 6.9% | Linden Project, E39/379,M39/255,E39/293,E39/428 Annual Report 01/05/1999 to 30/04/2000. |
| A61790 | 2000 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1 |
| A58497 | 1999 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475 |
| A54584 | 1998 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1 |
| A55156 | 1998 | Goldfields Exploration Pty Ltd | Linden | 6.9% | Linden Report, Annual Report 03/11/97 - 30/04/98 E39/293, M39/255, E39/379, E39/428 |
| A55383 | 1998 | Lone Hand & Associates Pty Ltd | Linden | <1% | Second Annual report Exploration Licence 39/516 Linden WA Reporting period 03/03/97-02/02/03/98 |
| A51482 | 1997 | Lone Hand & Associates Pty Ltd | Linden | <1% | First Annual report Exploration Licence E39/516 Linden Western Australia Reporting period - 3rd March 1996 to |
| A52801 | 1997 | Haoma Mining Nl | Linden | 10% | Linden Project Exploration Licence 39/379, Annual report for the period ending 18 September 1997, Edjudina. |
| A50531 | 1997 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme |
| A53181 | 1997 | Haoma Mining Nl | Linden North | <1% | Linden North Project, Exploration Licence: 39/293 Annual Report, Period Ending:18/09/1997 (Edjudina) |
| A49365 | 1996 | Haoma Mining Nl | Linden | <1% | Linden Project, E39/293 Annual report for the period ending 18 September 1996. |
| A51283 | 1996 | Mr Hawtin Dj | Linden | 10% | Linden South Project Exploration Licence E39/379 Annual report for the period ending 27 July 1996 Edjudina Sh5 |
| A47727 | 1996 | Sons Of Gwalia Ltd | Camelback-Butcher Well | <1% | Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R |
| A43925 | 1995 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232 |
| A46575 | 1995 | Haoma Mining Nl | Linden | <1% | Linden Project, Annual Report for Linden Project Exploration Licence E39/293 for the year ending 18th Septem |
| A46043 | 1995 | Mr Hawtin Dj | Linden | 10% | Linden South Project Exploration Licence E39/379 Annual report for the period ending 27 July 1995 Edjudina SH5 |
| A40388 | 1994 | Capella Holdings Pty Ltd | Linden | 1% | Linden Project, Exploration Licence No 39/328, Report for the Period Ending 17/3/1993. |
| A40601 | 1994 | Mount Burgess Mining Nl | Camelback, Butcher Well, Linden | <1% | Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93 |
| A42501 | 1994 | Mr Hawtin Dj | Linden | 10% | Annual Report for the period 28/07/93-27/07/94 Linden South Project E39/379 18042005SN S/C |
| A42096 | 1994 | Haoma North West Nl | Linden | <1% | Linden Project, Partial Surrender Report for the period ending 18th September1993, E39/293. |
| A39523 | 1993 | Haoma North West Nl | Linden | <1% | Linden Project, Annual Report for the year ending 18th September 1993, E39/293. |
| A34576 | 1991 | Haoma North West Nl | Linden | <1% | Linden (JV) Project, Non-statutory Report: Initial Exploration Programme for 1991, Annual Report for Sept 1990 |
| A23744 | 1988 | Haoma North West Nl | Linden | 10% | Linden Joint Venture. Exploration report. 03/87-03/88. M39/68,87,105,125,137,144. |
| A20093 | 1986 | Haoma North West Nl | Linden | 3.6% | Annual report Linden Gold Project Mt Margaret Mineral Field Western Australia GML39/701 to GML39/705 GML39/715 |
| A16206 | 1985 | Haoma North West Nl | Linden | 21% | Linden Joint Venture Exploration Report January to September 1985 Linden Western Australia HW85-12 |
| A12552 | 1983 | Anaconda Aust Inc | Linden | 9% | Linden Project, Annual Report for the period ending 31/12/1982, MC39/5258-5273, 5632-5634, & 5639-5641. |
| A13571 | 1983 | Anaconda Aust Inc | Mount Linden | 1.1% | Mount Linden Project, Non-statutory Report: Quarterly Report for the period ending 31st December 1983, MC39/52 |
| A10638 | 1982 | Anaconda Aust Inc | Linden | 5.3% | Linden Project, Annual Report for the period ending 15/12/1981, TR70/7962-7972H; MC39/5258-5273, 5632-5634, & |
| A9551 | 1980 | Swan Resources Ltd | Camel Back Range | <1% | Camel Back Range Project, Annual Report for the period ending 22/11/1980, TR70/7218H. |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A81193 | 1753 | Haoma Mining Nl | LINDEN | <1% | LINDEN PROJECT, ANNUAL REPORT FOR THE PERIOD, 19 SEPTEMBER 2007 – 18 SEPTEMBER 2008 |
| A81890 | 1753 | Saracen Gold Mines Pty Ltd | BUTCHER WELL | <1% | BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/ |
| A84434 | 1753 | Haoma Mining Nl | LINDEN | 8.4% | LINDEN COMBINED REPORTING GROUP, Report from 06/07/2008 to 05/07/2009, C37/2009, E39/239, E39/428, M39/255, M3 |
| A85884 | 1753 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | M39/721 – BUTCHER WELL PROJECT PARTIAL SURRENDER REPORT – 21 NOVEMBER 2007 TO 23 SEPTEMBER 2009 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 7 July 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 39/794 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 39/794? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.