M 45/357
M 45/357 is a live mining lease in the Shire of East Pilbara, Western Australia, held by Elazac Mining Pty Ltd. Granted on 19 May 1988 for 21 years (renewed), it expires on 18 May 2030. The ground is covered by 57 historical WAMEX reports.
Register summary
- Holder
- Elazac Mining Pty Ltd
- Local government
- Shire of East Pilbara
- Application received
- 7 Jan 1988
- Commenced
- 19 May 1988
- Expiry
- 18 May 2030
- Term
- 21 Years (Renewed)
The full record on M 45/357
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 2 changes of holder
- The full record: 39 years of expenditure and 9 conditions
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (5 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A138492 | 2024 | Infinity Mining Limited | Hillside | <1% | Partial Surrender E45/4824 Hillside for the period ending 04/12/2023. |
| A122718 | 2020 | Elazac Mining Pty Ltd | Stirling - Copper Hills | 11% | Annual Report For C286/1997 (Stirling/Copper Hills) for the period 1 December 2018 to 30 November 2019, M45/00 |
| A123299 | 2020 | Fe Limited | Hillside | <1% | Annual Technical Report Hillside Project, C78/2018, 1 December 2018 to 30 November 2019 |
| A119136 | 2019 | Elazac Mining Pty Ltd | Striling - Copper Hills | 11% | C286/1997 Striling/Copper Hills Project Annual Report for the period 1 December 2017 to 30 November 2018, M45/ |
| A119245 | 2019 | Macarthur Lithium Pty Ltd | Hillside | <1% | Combined Annual Report C78/2018 Hillside Project for the period 1 December 2017 to 30 November 2018, E45/04685 |
52 more reports
| A116700 | 2018 | Haoma Mining Nl | Stirling | 11% | C286/1997 Stirling Project Annual Report for the period 01/12/2016 - 30/11/2017, M45/00238, M45/00346, M45/003 |
| A112156 | 2017 | Haoma Mining Nl | Stirling - Copper Hills - Lionel | 11% | C286/1997 Stirling Project Annual Report For the Period 1 December 2015 to 30 November 2016, M45/00238, M45/00 |
| A108274 | 2016 | Haoma Mining Nl | Stirling - Copper Hills - Lionel | 7.6% | C286/1997 Stirling/Copper Hills/Lionel Project Annual Report 1 December 2014 to 30 November 2015 |
| A108350 | 2016 | Atlas Iron Ltd | Corunna Downs | <1% | CORUNNA DOWNS PROJECT Final Surrender Report to the Department of Mines and Petroleum for the Period 21 Januar |
| A108211 | 2016 | Atlas Iron Limited | Corunna Downs | <1% | CORUNNA DOWNS PROJECT Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 3 |
| A104627 | 2015 | Atlas Iron Ltd | Corunna Downs | <1% | Corunna Downs Project C94/2011 Annual Technical Report to the Department of Mines and Petroleum for the Period |
| A104875 | 2015 | Haoma Mining Nl | Stirling - Copper Hills - Lionel | 7.6% | Stirling/Copper Hills/Lionel Project C286/1997 Group 7, M45/238, M45/346, M45/357, M46/43, M46/44, M46/160, M4 |
| A101039 | 2014 | Atlas Iron Ltd | Corunna Downs | <1% | Corunna Downs Project, Annual Report for the period 01/01/2013 to 31/12/2013, E45/2585, 3320-3324, & 3579; E |
| A101207 | 2014 | Haoma Mining Nl | Stirling - Copper Hills - Lionel | 7.6% | Stirling / Copper Hills / Lionel Project C286/1997 Group 7 M45/238, M45/346, M45/357, M46/43, M46/44, M46/160, |
| A96317 | 2013 | Haoma Mining Nl | Stirling | 7.6% | Stirling Project, Annual Report for the period 1st December 2011 to 30th November 2012, M45/238, 346, 357; M46 |
| A96293 | 2012 | Atlas Iron Ltd | Corunna Downs | <1% | Corunna Downs Project, E45/3324 2585-I 3320-I 3321-I 3322 3323 & E45/3579 ANNUAL TECHNICAL REPORT To the Depar |
| A93902 | 2012 | Haoma Mining Nl | Stirling | 7.6% | Stirling / Copper Hills/ Lionel (Group 7), Annual report for the period 1st December 2010 to 30th November 201 |
| A92524 | 2011 | Atlas Iron Ltd | Corunna Downs | <1% | Corunna Downs Project E45/2585 3320-3324 & E45/3579 Annual Report to DMP Period Ending 31 December 2011 |
| A89409 | 2011 | Haoma Mining Nl | Sterling-Copper Hills- Lionel | 7.6% | Sterling/Copper Hills/ Lionel (Group 7), Annual report for the period 1st December 2009 to 30th November 2010, |
| A86055 | 2010 | Haoma Mining Nl | Stirling - Copper - Lionel | 7.6% | STIRLING / COPPER HILLS / LIONEL (Group 7), Annual Report for the Period 1 December 2008 to 30 November 2009, |
| A77649 | 2008 | Haoma Mining Nl | Stirling/ Copper Hills/ Lionel | 7.6% | Stirling/Copper Hills/Lionel (Group 7) Annual Report for the period 1 December 2006 - 30 November 2007 M45/238 |
| A74744 | 2007 | Haoma Mining Nl | Stirling/ Copper Hills/ Lionel (Group 7) | 7.6% | Stirling/ Copper Hills/ Lionel (Group 7) Project C286/1997, Annual Report for the Period 1 Dec 2005 - 30 Nov 2 |
| A72156 | 2006 | Haoma Mining Nl | Stirling/ Copper Hills/ Lionel | 7.6% | Stirling/ Copper Hills/ Lionel(Group 7), Annual Report for the Period 1 December 2004 to 30 November 2005, M46 |
| A73992 | 2006 | Gondwana Resources Ltd | Coongan | <1% | Annual Report, Coongan Project E45/2456, Period Covered to 18 October 2006, (Marble Bar). |
| A70676 | 2005 | Haoma Mining Nl | Stirling/Copper Hills/Lionel (Group 7) | 7.6% | Stirling/Copper Hills/Lionel (Group 7), Annual report for the period 1 December 2003 - 30 November 2004, (C286 |
| A68389 | 2004 | Haoma Mining Nl | Edelweis Mine | 7.4% | Annual Report for the period 01/12/2002-30/11/2003 Lionel,Stirling & Copper Hills Project M46/160, M45/238, M |
| A66207 | 2003 | Haoma Mining Nl | North Shaw | <1% | Tenement E45/2094, North Shaw , East Pilbara Region, Surrender Report March 2003. |
| A66585 | 2003 | Haoma Mining Nl | Lionel/Stirling/Copper Hills | 7.4% | Annual Mineral Exploration Report year ending 31st December 2002 Group 7 Lionel/Stirling/Copper Hills G45/36, |
| A64172 | 2002 | Haoma Mining Nl | Marble Bar | <1% | Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4 |
| A64312 | 2002 | Haoma Mining Nl | Edelweis Mine gold/jade exploration | 7.4% | Annual Report for the period ending November 2001 Group 7 Stirling, Copper Hills and Lionel tenements: M46/160 |
| A62011 | 2001 | Haoma Mining Nl | Edelweis Mine | 7.4% | Group 7 - Stirling, Copper Hills and Lionel tenements: M46/160, M46/43, M46/44, M46/177, M45/238, M45/346, M45 |
| A62138 | 2001 | Haoma Mining Nl | Marble Bar | <1% | Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606, |
| A60049 | 2000 | Haoma Mining Nl | Marble Bar | <1% | Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607, |
| A60617 | 2000 | Haoma Mining Nl | Edelweis Mine | <1% | Group 7, Stirling, Copper Hills and Lionel, Tenements E46/426,427, M46/160,43,44,177,238,346,357, G45/36, Annu |
| A57512 | 1999 | Haoma Mining Nl | Edelweis Mine gold/jade exploration | <1% | Stirling, Copper Hills, and Lionel. E46/426,427. M45/346,357. M46/43,44,160,170,238. Annual report for the per |
| A53539 | 1998 | Great Southern Mines Nl | Coongan | <1% | Partial Surrender Report for Exploration Licences E45/1152 &1153 Coongan Gold Basemetal Project Corunna Downs |
| A54109 | 1998 | Haoma Mining Nl | Stirling- Copper Hills - Lionel | <1% | Stirling- Copper Hills - Lionel project, Annual Report, Period Ending:11/1997 E46/426-427, M46/160, M45/238, 3 |
| A54468 | 1998 | Great Southern Mines Nl | Coongan | <1% | Surrender Report for Exploration Licences E45/1152 & E45/1153, Coongan Gold/ Basemetal Project, Corunna Downs |
| A50117 | 1997 | Cra Exploration Pty Ltd | Coongan | <1% | Coongan Project, Annual Report for the period ending 31/12/1996, E45/1152-1153, 1238-39 & 1282 |
| A52153 | 1997 | Haoma Mining Nl | Stirling - Copper Hills - Lionel | <1% | Annual report for period 30/11/96 Group 7:Stirling, Copper Hills & Lionel Tenements E46/426 E46/427 M46/160 M4 |
| A44362 | 1995 | Great Southern Mines Nl | Coongan | <1% | Partial Surrender Report for exploration licences E45/1152 & 45/1153 Coongan Project, for the period 27/03/199 |
| A46937 | 1995 | Great Southern Mines Nl | Coongan | <1% | 1995 Annual Report Coongan Gold and Basemetal Project Corunna Downs East Pilbara M7851 |
| A43819 | 1994 | Great Southern Mines Nl | Coongan | <1% | Coongan Project , Annual Report for the period 01/01/1993 to 31/12/1993, e45/1152-1153, 1238-1239, 1282, 1524; |
| A37772 | 1993 | Bacome Pty Ltd | Coongan | <1% | Coongan Basemetal Gold Project Corunna Downs East Pilbara 1992 Annual Report |
| A20986 | 1987 | Noranda Australia Ltd | Coongan | 1.7% | Coongan, Report on trenching [non-statutory], August 1985, P45/795-797, 45/844 |
| A23906 | 1987 | Noranda Australia Ltd | Coongan | 1.7% | Coongan Joint Venture, Report on reverse circulation drilling, August 1987, P45/795-797, P45/844 |
| A17508 | 1986 | Tern Minerals Nl | Nullagine | <1% | Conceptual Model: A source region for the Nullagine diamonds |
| A16274 | 1985 | Noranda Australia Ltd | Coongan | <1% | Coongan Project, Non-statutory Report: Interim Report for the period 9th April 1985 to 17th May 1985, P45/795- |
| A17905 | 1985 | Tern Minerals Nl | Coongan Belt | <1% | Final Exploration Report for 1984-85 Coongan Belt Prospects E46/74, P45/453-460, 828-838. |
| A16394 | 1984 | Noranda Australia Ltd | Coongan | <1% | Coongan Project, Non-statutory Report: A Progress Report for the period ending 31/12/1984, P45/795-802, 839, 8 |
| A17907 | 1984 | Tern Minerals Nl | Coongan Belt | <1% | Second Quarterly Report - March 1984. |
| A17908 | 1984 | Tern Minerals Nl | Coongan Belt | <1% | Third Quarterly Report - March 1984. |
| A17906 | 1983 | Tern Minerals Nl | Coongan Belt | <1% | First Quarterly Report - December 1983. |
| A22536 | 1973 | Pacminex Pty Ltd | Coongan Belt-West Stirling-Talga Talga | 1.8% | Coongan Belt-West Stirling-Talga Talga Project, Annual Report for the period ending 22nd July 1971; [Includes |
| A10097 | 1971 | Pacminex Pty Ltd | West Stirling- Coongan Belt | 1.8% | West Stirling - Coongan Belt Project, Non-statutory Report:Geological & Geochemical Plans to September 1971, M |
| A81640 | 1753 | Haoma Mining Nl | STIRLING/COPPER HILLS/LIONEL (Group 7) | 7.6% | STIRLING/COPPER HILLS/LIONEL (Group 7) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2007 – 30 NOVEMBER 2008, M45/23 |
| A40358 | 1753 | Bacome Pty Ltd | Coongan | <1% | Coongan Project Corunna Downs East Pilbara . 1993 Annual Report. |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 45/357 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 45/357? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.