M 45/481
M 45/481 is a live mining lease in the Shire of East Pilbara, Western Australia, held by Haoma Mining Nl and Kitchener Mining Nl. Granted on 28 May 1991 for 21 years (renewed), it expires on 27 May 2033. The ground is covered by 104 historical WAMEX reports.
Register summary
- Holders
- Haoma Mining Nl, Kitchener Mining Nl
- Local government
- Shire of East Pilbara
- Application received
- 6 Feb 1990
- Commenced
- 28 May 1991
- Expiry
- 27 May 2033
- Term
- 21 Years (Renewed)
The full record on M 45/481
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 3 changes of holder
- The full record: 36 years of expenditure and 40 conditions
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (23 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A122721 | 2020 | Haoma Mining Nl | Bamboo Creek | 14% | Annual Report For C280/1997 (Bamboo Creek) for the period ending 30/11/2019 |
| A123030 | 2020 | Bamboozler Pty Ltd; Whim Creek Mining Pty Ltd | Bamboo | 1% | Annual Mineral Exploration Report for Combined Reporting Group C1/2014: M45/202, E45/3724 and E45/4921 — Bambo |
| A119133 | 2019 | Haoma Mining Nl | Bamboo Creek | 14% | C280/1997 (Bamboo Creek Project) Annual Report for the period 1 December 2017 to 30 November 2018, E45/03217, |
| A119530 | 2019 | Whim Creek Mining Pty Ltd; Bamboozler Pty Ltd | Bamboo | 1% | Combined Annual Report Bamboo Project For the Period 1 February 2018 to 31 January 2019, E45/03724, M45/00202, |
| A116693 | 2018 | Haoma Mining Nl | Bamboo Creek | 14% | Bamboo Creek Project C280/1997 Annual Report for the period 1 December 2016 to 30 November 2017, E45/03217, E4 |
99 more reports
| A117041 | 2018 | Haoma Mining Nl | Bamboo Creek | 14% | E45/2982 Final Surrender Report for the period 30 November 2007 to 22 March 2018 |
| A115592 | 2018 | Whim Creek Mining Pty Ltd | Yarrie | 2.4% | Partial Surrender Report - Yarrie E45/3724 for the period 15 November 2011 to 10 November 2017 |
| A116362 | 2018 | Whim Creek Mining Pty Ltd | Bamboo | 2.4% | Combined Annual Report - Bamboo Project C1/2014 For the Period 1 February 2017 to 31 January 2018, E45/03724, |
| A112082 | 2017 | Haoma Mining Nl | Bamboo Creek | 11% | Bamboo Creek Project C280/1997 Annual Report for the period 01/12/2015 - 30/11/2016 |
| A112403 | 2017 | Whim Creek Mining Pty Ltd | Bamboo | 2.4% | Combined Annual Exploration Report-Bamboo Project C01/2014 for the period 1 February 2016 to 31 January 2017, |
| A108797 | 2016 | Creasy Group | Bamboo | <1% | Combined Annual Mineral Exploration Report Bamboo Project For C01/2014 During the period 01/02/2015 to 31/01/2 |
| A108110 | 2016 | Haoma Mining Nl | Bamboo Creek | 11% | Bamboo Creek Project C280/1997 Annual Report for the period 1 December 2014 to 30 November 2015 (E 45/02982... |
| A104876 | 2015 | Haoma Mining Nl | Bamboo Creek - Talga River - Twenty Ounc | 11% | Bamboo Creek Project C280/1997 Group 1 Annual Report for the Period 27th November 2013 to 26th November 2014, |
| A105364 | 2015 | Nullagine Gold Pty Ltd | Bamboo | <1% | Combined Annual Mineral Exploration Report Bamboo Project C01/2014 for the period 01/02/1014 to 31/01/2015, E4 |
| A101204 | 2014 | Haoma Mining Nl | Bamboo Creek | 11% | Bamboo Creek Project C280/1997 Group 1 E45/2982, E45/3217-I, E45/4117, M45/411, M45/480, M45/481, M45/874, P45 |
| A103821 | 2014 | Conglomerate Gold Exploration Pty Ltd | East Pilbara | <1% | East Pilbara Project Annual Report for the period 01/07/2013 to 30/06/2014, E45/3000, E45/3001, E45/3332, E45/ |
| A96315 | 2013 | Haoma Mining Nl | Bamboo Creek | 11% | Bamboo Creek Project, Annual Report for the period 27th November 2011 to 26th November 2012, E45/2982 & 3217; |
| A96607 | 2013 | Whim Creek Mining Pty Ltd | Yarrie | 2.4% | Yarrie Project (E45/3724) Annual Report For the Reporting Period 15th November 2011 to 14th November 2012 |
| A96816 | 2013 | Haoma Mining Nl | Bamboo Creek | 14% | E45/2982 – Bamboo Creek Partial Surrender Report 30 November 2007 to 20 November 2012 |
| A100598 | 2013 | Whim Creek Mining Pty Ltd | Yarrie | 2.4% | Yarrie Project (E45/3724) Annual Report For the Reporting Period 15th November 2012 to 14th November 2013 |
| A93736 | 2012 | Haoma Mining Nl | Bamboo Creek | 11% | Bamboo Creek Project C280/1997 Group 1 Annual Report 27th November 2010 to 26th November 2011, E45/2982, 3217, |
| A89860 | 2011 | Haoma Mining Nl | Bamboo Creek | 11% | Bamboo Creek (Group 1), Annual Report for the Period 1 December 2009 – 30 November 2010, C280/1997 |
| A86465 | 2010 | Haoma Mining Nl | Bamboo Creek / Talga River / Twenty Ounc | 18% | Bamboo Creek / Talga River and Twenty Ounce Gully Projects (Group 1), Annual Report for the period 1 December |
| A77951 | 2008 | Mr Creasy Mg | Yarrie | 1.6% | Project Name: Yarrie C182/2006 Nature of Report: Anuual Period Covered: 16.12.2006 to 15.12.2007 Tenements: ex |
| A78064 | 2008 | Haoma Mining Nl | Bamboo Creek - Talga River - Twenty Ounc | 18% | Bamboo Creek, Talga River and Twenty Ounce Gully Project (Group 1) Annual Report for the period 1 December 200 |
| A74736 | 2007 | Haoma Mining Nl | Bamboo Creek/ Talga River/ Twenty Ounce | 8.9% | Bamboo Creek/Talga River/Twenty Ounce Gully Projects (Grp 1) Annual Report for the Period 1 Dec 2005 to 30 Nov |
| A76031 | 2007 | Haoma Mining Nl | Bamboo Creek | 6.6% | Bamboo Creek Project E45/2097 Surrender Report REPORT NO: 02-02-2007-01 |
| A72845 | 2006 | Haoma Mining Nl | Bamboo Creek/ Talga River/ Twenty Ounce | 8.9% | Bamboo Creek, Talga River and Twenty Ounce Gully Projects, (Group1), Annual report for the period 01 December |
| A74614 | 2006 | Muccan Minerals Pty Ltd | Bamboo Creek | 1.6% | Annual Report for the period 16.12.2005 to 15.12.2006 Yarrie Project (C182/2006) E45/2385, M45/202 |
| A70536 | 2005 | Haoma Mining Nl | Bamboo Creek/ Talga River/ Twenty Ounce | 8.9% | Bamboo Creek, Talga River and Twenty Ounce Gully Projects, Annual report for the period 01 December 2003 - 30 |
| A70939 | 2005 | Haoma Mining Nl | Bamboo Creek | 6.6% | Bamboo Creek Project, Partial Surrender Report [Amended] for the period 06/12/2001 to 18/04/2005, E45/2097. [C |
| A68388 | 2004 | Haoma Mining Nl | Bamboo Creek /Talga | 8.9% | Group 1 - Bamboo Creek - East Pilbara, Annual report for the period ending November 2003, E45/2097, M45/480, |
| A66587 | 2003 | Haoma Mining Nl | Bamboo Creek | 8.9% | Annual Mineral Exploration Report, Group 1 Bamboo Creek E45/2097,L45/72,M45/411, M45/480-481,874,P45/2227,2242 |
| A64311 | 2002 | Haoma Mining Nl | Bambo Creek/Twenty Ounce Gully | 30% | Annual Report form the period ending November 2001 Group 1 Bamboo Creek, Twenty Ounce Gully tenements: L45/72, |
| A62137 | 2001 | Haoma Mining Nl | Bamboo Creek/Talga River/Twenty Ounce Gu | 2.2% | Annual Report for the period ending November 2000 Group 1 Bamboo Creek, Talga River & Twenty Ounce Gully tenem |
| A62173 | 2001 | Mr Creasy Mg | Yarrie | <1% | Annual Report for the period 01.01.2000 to 31.12.2001 Yarrie Project mining lease M45/202, exploration licence |
| A60048 | 2000 | Haoma Mining Nl | Bamboo Creek/Talga Creek/Twenty Ounce Gu | 2.2% | Group 1, Bamboo Creek, Talga River & Twenty Ounce Gully. Tenements: E45/1594,1596,L45/72, M45/411,480,481,874, |
| A61120 | 2000 | Mr Creasy Mg | Yarrie | <1% | Combined Mineral Exploration Report Yarrie (GSWA Ref:C3147/ 1993 and M8292) Exploration Licences 45/1233, 45/1 |
| A57034 | 1999 | Sipa Resources Ltd | Panorama / Kittys Gap | <1% | 1998 Annual and Final Report on E45/1294 Kittys Gap Panorama Project, Covering the Period 9 November 1992 to 3 |
| A57503 | 1999 | Haoma Mining Nl | Bamboo Creek | 1.4% | Bamboo Creek, Talga River, and Twenty Ounce Gully. Annual report for the period ending 11/98. |
| A57847 | 1999 | Mr Creasy Mg | Yarrie | <1% | Yarrie M8292, C314/1993, 01/01/98 - 31/12/98 Mining Lease: M45/202, Exploration Licence:E45/1233, 1344, 1609, |
| A53457 | 1998 | Outokumpu Exp Aust Pty Ltd | Panorama / Kittys Gap | <1% | E45/1294 Kittys Gap Annual Report Panorama Project covering the period 1January to 31 December 1997. |
| A53871 | 1998 | Mr Creasy Mg | Yarrie | 2.4% | Yarrie Project (M8292, C314/1993) Partial Surrender Report E45/1233 covering period 22/07/1992 to 10/10/1997. |
| A53997 | 1998 | Compass Resources Nl | Pilbara | <1% | Annual Report Pilbara Joint Venture Exploration Licences 45,1300/45,1301,45/1483,45/1486,45/1603 and 45/1710 f |
| A54105 | 1998 | Haoma Mining Nl | Bamboo Creek/Talga/Twenty Ounce Gully | 1.4% | Group1 - Bamboo Creek, Talga River, & Twenty Ounce Gully. Annual Report for the period ending 11/97. |
| A54642 | 1998 | Mr Creasy Mg | Yarrie | <1% | Yarrie Project, C314/1993, Annual Report 01/01/97 - 31/12/97 Mining Licence: M45/202, Exploration Licence: E4 |
| A50543 | 1997 | Sipa Resources Ltd | Kitty's Gap/ Panorama | <1% | Kitty's Gap/ Panorama Project, Annual Report E45/1294 for period 9th November 1995 to 31st December 1996. |
| A52150 | 1997 | Haoma Mining Nl | Bamboo Creek - Talga River - Twenty Ounc | 1.4% | Annual Report for period ending 30/11/1996, Group 1: Bamboo Creek, Talga River & Twenty Ounce Gully Tenements: |
| A53127 | 1997 | Compass Resources Nl | Bamboo | 3.1% | Bamboo Project, Partial Surrender Report for period January 1993 to December 1997, E45/1300. |
| A53873 | 1997 | Stockdale Prospecting Ltd | Turner River | 7.6% | Annual Mineral Exploration Report, Turner River, Exploration Licence E45/1709 for the period 18th October1996- |
| A50861 | 1997 | Mr Creasy Mg | Yarrie | <1% | Report on a reverse circulation drilling, stream sediment, soil and rock sampling programs at Yarrie, East Pil |
| A47308 | 1996 | Compass Resources Nl | Coongan | <1% | Exploration Licences 45/1300,45/1301,45/1483,45/1486,45/1544, Coongan Project, Annual Report for the year endi |
| A47462 | 1996 | Mr Creasy Mg | Yarrie | 1.1% | Anual report period 01/01/95 to 31/12/95 Mark Creasy, Geochemex Australia Rep No 318 Doc No 161 Report on a co |
| A48317 | 1996 | Compass Resources Nl | Coongan | 1.4% | Coongan Project, Partial Surrender Report for portions surrendered January 1996, E45/1300 & 1301. |
| A52157 | 1996 | Bhp Minerals Pty Ltd | Bamboo Creek | <1% | Bamboo Creek Project Final Report CR8769 September 1996 |
| A44976 | 1995 | Sipa Resources Ltd | Panorama / Kittys Gap | <1% | Panorama / Kittys Gap Project,1994 Annual Report E45/1294 covering period 1st January 1994 to 31st December 19 |
| A44977 | 1995 | Sipa Resources Ltd | Panorama | <1% | E45/1294 voluntary partial surrender report. Kitty's Gap, Panorama Project. Covering the period 9/11/92 to 26/ |
| A46574 | 1995 | Cra Exploration Pty Ltd | Panorama | <1% | Panorama Project, Annual Report for year ending 8th November 1995, E45/1294. |
| A43899 | 1995 | Compass Resources Nl | Coongan | <1% | Exploration Licences 45/1300,45/1301,45/1483,45/1486, Coongan Project, Annual Report for the year ending 31/12 |
| A43224 | 1994 | Mr Creasy Mg | Bamboo | 1.1% | Summary of results of a surface geochemical sampling programme Yarrie Prospect Tenement Nos E45/1233, E45/1344 |
| A40985 | 1994 | Sipa Resources Ltd | Panorama | <1% | Panorama Project, Annual Report for the period 9th November 1992 to 31st December 1993, E45/1294 |
| A43240 | 1994 | Mr Creasy Mg | Yarrie | 1.1% | Yarrie Project, Non-statutory Report: Airborne Geophysical Survey Interpretation, December 1994, E45/1233 & 1 |
| A40394 | 1994 | Mr Creasy Mg | Bamboo | 1.1% | Annual report for the period 22/07/92-31/12/93 Bamboo Project E45/1233 E45/1344 |
| A40571 | 1994 | Compass Resources Nl | Bamboo Creek | 3.1% | Bamboo Creek Project, (1st) Annual Report for year ending 18th January 1994, E45/1300. |
| A35744 | 1992 | Bamboo Creek Gold Mines Nl | Bamboo Creek | 48% | (Annual Report for the Period 01/05/91 - 01/05/92) Bamboo Creek Goldmine Report for the Department of Mines WA |
| A31830 | 1990 | Kitchener Mining Nl | Bamboo Creek | 13% | Bamboo Creek Project Department of Mines Report M45/290-292 (Annual Report 1989-1990) |
| A26664 | 1989 | City Resources Ltd | Nuggetty Gully | 1.3% | Annual Report Nuggetty Gully EL 45/319 for period 28/11/87 - 27/11/88 |
| A29864 | 1989 | City Resources Ltd | Nuggetty Gully | 1.3% | Annual Report, Nuggetty Gully EL45/319, for the period 28/11/88 - 27/11/89 |
| A28288 | 1989 | Kitchener Mining Nl | Bamboo Creek | 36% | Bamboo Creek Project. Department of Mines Report M45/127. 03/89. |
| A28289 | 1989 | Kitchener Mining Nl | Bamboo Creek | 100% | Bamboo Creek Project. Department of Mines Report M45/31. 03/89. |
| A22215 | 1987 | City Resources Ltd | Nuggetty Gully | 1.3% | Annual report for Nuggety Gully Exploration Licence (E45/319, Coppin Gap area), East Pilbara, WA. |
| A19211 | 1986 | Esso Australia Ltd | Nuggetty Gully | 1.3% | Nuggetty Gully (5649) EL 45/319, Annual Report for Period 27th November 1985 to 26 November 1986. |
| A18908 | 1986 | Bamboo Creek Gold Mines Nl | Bamboo Creek | 32% | Bamboo Creek Gold Project, Annual report, July 31st 1985 to August 26th 1986, M45/21 |
| A18972 | 1986 | Kitchener Mining Nl | Bamboo Creek | 13% | Bamboo Creek Joint Venture, Report (annual) on P45/292-294, P45/296-305, P45/319, From August 1985 to Septembe |
| A15435 | 1985 | Kitchener Mining Nl | Bamboo Creek | 86% | Bamboo Creek (JV) Project, Annual Report for the period ending 11/05/1985, P45/147. |
| A16812 | 1985 | Forrest Gold Pty Ltd | Bamboo Creek | 25% | Bamboo Creek Project, Non-statutory Report: Mine Plans & Drawings / Geological Plans & Cross Sections for the |
| A16408 | 1985 | Kitchener Mining Nl | Bamboo Creek | 20% | Bamboo Creek (JV) Project, Annual Report for the period ending 11/08/1985, P45/263, 291-305, & 319. |
| A14578 | 1984 | Haoma North West Nl | Bamboo Creek | 18% | Bamboo Creek (JV) Project, Annual Report for the period 13th August 1983 to 12th August 1984, P45/263, 292-294 |
| A14580 | 1984 | Haoma North West Nl | Bamboo Creek | 100% | Bamboo Creek Project, Annual Report for the period 01/10/1983 to 10/10/1984, M45/31. |
| A14736 | 1984 | Esso Australia Ltd | Nuggetty Gully | 1.3% | Nuggetty Gully Annual Report for Period 1 January 1984 - 31 December 1984. ML's 45/518 and 45/519 (now part of |
| A14201 | 1984 | Kitchener Mining Nl | Bamboo Creek | 32% | Bamboo Creek Project, Annual Report for the period 01/08/1983 to 30/07/1984, M45/21. |
| A11850 | 1983 | Cra Exploration Pty Ltd | Bamboo Creek | 25% | Bamboo Creek Project, Annual Report for the period ending 31/12/1982, GML45/1095, 1118, 1203-1204, 1206, 1238, |
| A11121 | 1982 | Cra Exploration Pty Ltd | Bamboo Creek | 25% | Bamboo Creek Project, Annual Report for the period 01/01/1981 to 31/12/1981, GML45/1095,1118, 1203, 1204,1206, |
| A9791 | 1981 | Cra Services Ltd | Bamboo Creek | 25% | Bamboo Creek Project, Annual Report for the period 01/01/1980t o 31/12/1980, GMLs & MCs. |
| A8604 | 1979 | Esso Australia Ltd | Nuggetty Gully | 1.1% | Nuggetty Gully Project, Annual [Final] Report, October 1979, TR70/5948H. |
| A8680 | 1979 | Kitchener Mining Nl | Bamboo Creek | 17% | Bamboo Creek Project, Non-statutory Report: A Review of the Geology & Ore Potential of the Bamboo Creek Gold M |
| A7961 | 1978 | Esso Australia Ltd | Nuggetty Gully | 1.1% | Nuggetty Gully Project, Annual Report for the period 26/07/1977 to 25/07/1978, TR70/5948H. |
| A7169 | 1977 | Esso Australia Ltd | Nuggetty Gully | 1.1% | Nuggetty Gully Project, Annual Report for the period July 26th 1976 to July 25th 1977, TR70/5948H. |
| A6526 | 1976 | Esso Australia Ltd | Nuggetty Gully | 1.1% | Nuggetty Gully Project, Annual Report for the year ending 26/07/1976, TR70/5948H. |
| A6080 | 1975 | Esso Australia Ltd | Nuggetty Gully | 1.1% | Annual Report for Temporary Reserve No. 5948H Nuggetty Gully |
| A21861 | 1973 | Australian Anglo American Ltd | Pilbara -Bridget | <1% | Pilbara -Bridget Project, Non-statutory Report: Pilbara- Bridget Project, Plans covering the period 01/01/1968 |
| A3469 | 1973 | Australian Anglo American Ltd | Coppins Gap - Yarrie | <1% | Coppins Gap - Yarrie Project, Annual Report for the year ending 31/12/1972, TR70/4714H. |
| A4353 | 1972 | Woodsreef Mines Ltd | Bamboo Creek | 25% | Bamboo Creek Project, Non-statutory Report: Exploration Report, August 1972, MC45/1985-1992, 2044, 2047, 2052, |
| A2256 | 1971 | Australian Anglo American Ltd | Coppin Gap - Yarrie | <1% | Coppin Gap - Yarrie Project, Annual Report for the period ending 31/12/1971, TR70/4714 |
| A165 | 1971 | Anglo-American Corporation ( Australia) Limited | Pilbara | <1% | Pilbara (JV) Project, Annual (Geological) Report for the period endng 31/12/1970, TR70/4714H. |
| A4687 | 1971 | Woodsreef Mines Ltd | Bamboo Creek | 13% | Bamboo Creek Project, Non-statutory Report: An Appraisal of the Gold & Nickel Potential of the Bamboo Creek Fi |
| A164 | 1970 | Anglo-American Corporation ( Australia) Limited | Pilbara | <1% | Pilbara (JV) Project, Annual (Geologica) Report for theyear ending 31st December 1969, TR70/4714H, 4725H, 4727 |
| A2091 | 1970 | Australian Anglo American Ltd | Yarrie | <1% | Yarrie Project, Non-statutory Report:Results of Exploration for the period ending 31/12/1970, TR70/4714H. |
| A12648 | 1970 | Murchison Central Mines Ltd | Garden Creek | 11% | Garden Creek Project, Non-statutory Report: Progress Report, November 1970, MC45/2085-2091. |
| A1563 | 1969 | Anglo American Corporation ( Australia) Ltd | Coppin Gap- Yarrie | <1% | Coppin Gap - Yarrie Project, Non-statutory Report: Geological Maps & Geochemical Stream Sediment Sampling Valu |
| A50659 | 1753 | Compass Resources Nl | Coongan | <1% | Coongan Project, Annual Report for the year ending 31/12/1996 , E45/1300,45/1301,45/1483,45/1486,45/1544,45/16 |
| A81762 | 1753 | Haoma Mining Nl | BAMBOO CREEK, TALGA RIVER AND 20 OUNCE G | 18% | BAMBOO CREEK, TALGA RIVER AND TWENTY OUNCE GULLY PROJECTS (Group 1), ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2 |
| A2386 | 1753 | Australian Anglo American Ltd | Coppin Gap | <1% | Coppin Gap |
| A3900 | 1753 | Australian Anglo American Ltd | Coppin Gap | 3.1% | Coppin Gap Project, Non-statutory Report : Induced Polarization Survey 1972, MC45/3568-3573, 5496-5502, 6163-6 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 45/481 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 45/481? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.