M 45/764
Register summary
- Holder
- Greatland Pty Ltd
- Local government
- Shire of East Pilbara
- Application received
- 2 Sept 1997
- Commenced
- 15 Apr 2016
- Expiry
- 14 Apr 2037
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149283 | 2025 | Antipa Minerals Ltd. | Paterson South Group | 2% | Partial Surrender Report E45/5312 Paterson South Group for the period ending 12/5/2025 |
| A124170 | 2020 | Antipa Minerals Ltd. | Colonel | 2% | Colonel E45/5312 Annual Technical Report for the period ending 12/05/2020 |
| A123532 | 2020 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project C108/2015 Annual Technical Report 1 April 2019 to 31 March 2020 for Exploration Licences E45/ |
| A122760 | 2020 | Newcrest Mining Limited | Telfer | 1% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2019 |
| A120217 | 2019 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - E45/2529 - voluntary partial surrender for the Period 1 April 2015 to 31 March 2019 |
84 more reports
| A119140 | 2019 | Newcrest Mining Limited | Telfer | 1% | C348/1995 Telfer Mine Group Annual Report for C348/1995 for the period 1 January 2018 to 31 December 2018 |
| A120583 | 2019 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - 2018 Annual Report (C108/2015) for the period 01/04/2018-31/03/2019 |
| A115962 | 2018 | Newcrest Mining Limited | Telfer | 1% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2017. |
| A116999 | 2018 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project C108/2015 Annual Report for the period 01/04/2017 - 31/03/2018, E45/02524, E45/02525, E45/025 |
| A117008 | 2018 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - C108/2015 - Partial Surrender Report For the Period 15 April 2015 to 11 April 2018, E45/025 |
| A114183 | 2017 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project C108/2015 Annual Report For the Period 1 April 2016 to 31 March 2017, E45/02524, E45/02525, E |
| A112122 | 2017 | Newcrest Mining Limited | Telfer | 1% | C348/1995 - Telfer Mine Project Combined Annual Technical Report For the Period 1 January 2016 to 31 December |
| A108067 | 2016 | Newcrest Mining Limited | Telfer | <1% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 TELFER C348/1995 - TELFER MINE GROUP - COMBINE |
| A109118 | 2016 | Antipa Minerals Ltd. | Paterson | <1% | Paterson Project - Annual Report C108/2015, E45/2524-2529 for the period 01 April 2015 to 31 March 2016 |
| A104881 | 2015 | Newcrest Mining Ltd | Telfer | <1% | C348/1995 - Telfer Mine Group Annual Technical Report for the year ending 31/12/2014, E45/975.....P45/2861 |
| A101199 | 2014 | Newcrest Mining Ltd | Telfer | <1% | C348/1995 - TELFER MINE GROUP ANNUAL TECHNICAL REPORT YEAR ENDING 31ST DECEMBER 2013 E45/975, E45/1070, E45/11 |
| A97052 | 2013 | Newcrest Mining Ltd | Telfer | 1% | Telfer Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/975.......E45/3255; M |
| A93130 | 2012 | Newcrest Mining Ltd | Telfer | 1.1% | Telfer Project, Annual Report for the period 1st January 2011 to 31st December 2011, E45/975.................. |
| A89730 | 2011 | Newcrest Mining Ltd | Telfer | 1% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2010 |
| A86296 | 2010 | Newcrest Mining Ltd | Telfer | 1% | C348/1995 - Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2009, E45/975, E45/1070 |
| A81226 | 2009 | Newcrest Mining Ltd | TELFER | 1.4% | C348/1995 - TELFER MINE GROUP ANNUAL TECHNICAL REPORT YEAR ENDING 31ST DECEMBER 2008. E45/1070, 1168, E45/170 |
| A77533 | 2008 | Newcrest Mining Ltd | Telfer / Connaughtons Dome gold | 4.2% | Telfer Mine Group, Annual Technical Report for Period Ending 31st December 2007 ML45/6-11, ML45/33, E45/1168, |
| A74413 | 2007 | Newcrest Mining Ltd | Telfer | 8.7% | Annual Technical Report, Telfer Mine Group, Ref. No: C348/1995, Period Ending 31st December 2006 (Paterson Ra |
| A74416 | 2007 | Newcrest Mining Ltd | Telfer / Connaughtons Dome | <1% | Telfer Project Annual Technical Report Deserts Revenge Group C351/1995 Period Ending 31st December 2006. (P |
| A71795 | 2006 | Barrick Gold Of Australia Ltd | Northwest Telfer | <1% | Project 6131 Northwest Telfer JV Project (Barrick Gold Of Au stralia Farmin) E45/854....P45/2460 Annual Report |
| A71871 | 2006 | Newcrest Mining Ltd | Telfer / Connaughtons Dome | 8.7% | Annual Technical Report, Telfer Mine Group, C348/1995, Period ending 31 December 2005, (E45/1168,1705,M45/6-9, |
| A71874 | 2006 | Newcrest Mining Ltd | Telfer / Connaughtons Dome | <1% | Telfer Project, Annual Technical Report, Deserts Revenge Group, C351/1995, Period ending 31 December 2005, (M4 |
| A70009 | 2005 | Newcrest Mining Ltd | Telfer | 8.7% | Annual technical report for the period 01/01/04 - 31/12/04 Telfer Project, Telfer mine group, C348/1995, E45/1 |
| A70012 | 2005 | Newcrest Mining Ltd | Telfer | <1% | Annual technical report for the period 01/01/04 - 31/12/04 Telfer Project, Deserts Revenge group, C351/1995, M |
| A70117 | 2005 | Barrick Gold Of Australia Ltd | Project 6131 Northwest Telfer JV | <1% | Project 6131 Northwest Telfer JV Project (Barrick Gold Of Au stralia Farmin) E45/854.....P45/2460 Annual Repor |
| A68292 | 2004 | Mount Burgess Mining Nl | Telfer | <1% | Annual Report Telfer for the period 1 January 2003 to 31 Dec ember 2003 (C348/93), E45/1218....M45/662 |
| A68092 | 2004 | Newcrest Mining Ltd | Telfer | 8.7% | Annual Technical Report, Telfer Mine Group, (Ref, No: C348/1995), for period ending 31st December 2003.M45/6 ( |
| A68093 | 2004 | Newcrest Mining Ltd | Telfer | <1% | Telfer Project, Annual Technical Report, Deserts Revenge Group,M45/203-208, M45/249, M45/632-633 (Ref No: C351 |
| A66092 | 2003 | Newcrest Mining Ltd | Telfer | 8.7% | Annual Technical Report Telfer Mine Group C348/1995 period ending 31st December 2002 M45/6, M45/7, M45/8, M45/ |
| A66095 | 2003 | Newcrest Mining Ltd | Telfer | <1% | Annual Technical Report Deserts Revenge Group C351/1995 period ending 31st December 2002 M45/203, M45/204, M45 |
| A66297 | 2003 | Mount Burgess Mining Nl | Telfer | <1% | Telfer Project, Annual Report for the period 1 January 2002 to 31 December 2002 Telfer C348/1993: South Camp D |
| A64298 | 2002 | Newcrest Mining Ltd | Telfer | <1% | Annual Technical Report Ref No C351/1995 Period Ending 31st December 2001. Deserts Revenge Group ML45/203, ML4 |
| A64338 | 2002 | Mount Burgess Mining Nl | Telfer | <1% | Annual Report, Telfer Project, Period 1 January 2001 - 31 December 2001. South Camp Dome E45/ 1654, 1218 East |
| A64527 | 2002 | Newcrest Mining Ltd | Telfer | 6.5% | Annual Technical Report Ref No: C348/1995 Period Ending 31st December 2001. Telfer Mine Group ML45/6 Main Dome |
| A61905 | 2001 | Normandy Gold Exploration Pty Ltd | Yeneena | <1% | Annual Report on exploration for the period 1 January 2000 to 31 December 2000 Yeneena Project Combined Annual |
| A62074 | 2001 | Newcrest Mining Ltd | Telfer | 8.7% | Annual Technical Report period ending 31st December 2000 Telfer Mine Group ML45/6 Main Dome, ML45/7 West Dome, |
| A62271 | 2001 | Newcrest Mining Ltd | Deserts Revenge | <1% | Annual Technical Report to the Department of Minerals and Energy period ending 31st December 2000 Deserts Reve |
| A60063 | 2000 | Newcrest Mining Ltd | Deserts Revenge | <1% | Annual Report to the Department of Minerals and Energy, Ref No:C351/1995, Period ending 31/12/1999, Deserts Re |
| A60173 | 2000 | Newcrest Mining Ltd | Telfer | 8.7% | Annual Technical Report Ref No: C348/1995 Period Ending 31/12/1999 Telfer Mine Group ML45/6 Main Dome ML45/7 W |
| A60197 | 2000 | Normandy Gold Ltd | Yeneena | <1% | Annual Report on Exploration for the Period 01/01/1999 to 31/12/1999 Yeneena Project Combined Annual Report Is |
| A57613 | 1999 | Newcrest Mining Ltd | Deserts Revenge | <1% | Deserts Revenge Group 31/12/1998 ML45/205-208, 249, 632, 633 |
| A57618 | 1999 | Newcrest Mining Ltd | Telfer | 8.7% | Telfer Mine Group - Annual Technical Report 31/12/1998 E45/1168, 1705, M45/06-09, 11 |
| A57776 | 1999 | Normandy Gold Ltd | Paterson | <1% | Combined Annual Report - Isdell Joint Venture 01/01/98 - 31/12/98 E45/1217-1218, 1227, 1234 |
| A54531 | 1998 | Mount Burgess Mining Nl | South Camp Dome | <1% | Camp Dome South: E45/1218, Kaliranu: E45/1234, East Tim's Dome: E45/1217, Arrowhead: E45/1227, Wilki: E45/1535 |
| A53774 | 1998 | Newcrest Mining Ltd | Telfer | 5.3% | Annual Technical Report for period ending 31/12/97 Telfer Mine Group ML45/6 Main Dome ML45/7 West Dome ML45/8 |
| A56241 | 1998 | Newcrest Mining Ltd | Wilkie Borefield | 17% | Wilkie Borefield Tenement - E45/1168 10/1998 |
| A53788 | 1998 | Newcrest Mining Ltd | Deserts Revenge | <1% | Annual Technical Report period ending 31/12/97 Deserts Revenge Group ML45/203-208 ML45/249 ML45/632-633 |
| A50324 | 1997 | Newcrest Mining Ltd | Telfer | 5.5% | Annual Technical Report to the Department of Mines period ending 31st December 1996. Telfer Mine group ML45/6 |
| A50509 | 1997 | Mount Burgess Mining Nl | Camp Dome South | <1% | Annual technical report for the year ending December 1996 Camp Dome South Project: E45/1218, 1654; P45/2367,23 |
| A50249 | 1997 | Newcrest Mining Ltd | Telfer / Connaughtons Dome | <1% | Annual Technical Report Period ending 31st December 1996 Deserts Revenge Group ML45/203 ML45/204 ML45/205 ML45 |
| A47885 | 1996 | Mim Exploration Pty Ltd | Camp Dome South | <1% | Annual progress on exploration carried out during 1995 on exploration licence E45/1218, Camp Dome South JV, Pa |
| A47088 | 1996 | Newcrest Mining Ltd | Telfer Connaughtons Dome | 9.2% | Report No. 30/1017 Annual Technical report period ending 31st December 1995 ML45/6 Main Dome South, ML45/7 Wes |
| A47090 | 1996 | Newcrest Mining Ltd | Telfer Connaughtons Dome | <1% | Annual Technical Report period ending 18th December 1995 Mining Leases M45/203 M45/204 M45/205 M45/206 M45/207 |
| A44993 | 1995 | Newcrest Mining Ltd | Wilkie Borefield | 17% | Report No. 30/967 Annual Technical Report period ending 31st December 1994 Exploration Licence E45/1168 Wilkie |
| A44743 | 1995 | Mim Exploration Pty Ltd | Paterson | <1% | Annual Progress Report on Exploration carried out during 1994 on Exploration Licences E45/1217,E45/1218,E45/12 |
| A45107 | 1995 | Newcrest Mining Ltd | Main Dome South, West Dome, Main Dome No | <1% | Annual Technical Report Period ending 31st December 1994 ML45/6 Main Dome South ML45/7 West Dome ML45/8 Main D |
| A43791 | 1994 | Newcrest Mining Ltd | Deserts Revenge | <1% | Report No. 30/960 Annual Technical Report period ending 18th December 1994 Mining Leases M45/203 M45/204 M45/2 |
| A42076 | 1994 | Newcrest Mining Ltd | Wilkie Borefield | 17% | Annual Report for the period 31/12/92-31/12/93 Wilkie Borefield Project E45/1168 |
| A39723 | 1993 | Mount Burgess Mining Nl | Telfer | <1% | Annual Report for the period 09/08/92-08/08/93 ,Telfer Project, E45/1218 |
| A37739 | 1992 | Newcrest Mining Ltd | Deserts Revenge | <1% | Annual report for the period ending 31/12/1992 Deserts Revenge Project M45/203 M45/204 M45/205 M45/205 M45/ 20 |
| A37600 | 1992 | Newcrest Mining Ltd | Malu West | 10% | Annual Technical Report for Period ending 31/12/92 Miscelaneous Group E45/1248A,979,1168; M45/460 |
| A35115 | 1992 | Newcrest Mining Ltd | Airstrip | <1% | Annual Technical Report For Period Ending 31/12/91 ML45/9 - Airstrip |
| A32301 | 1991 | Newmont Australia Ltd | Airstrip | <1% | Annual Technical Report Period Ending 17/12/90 Mining Lease 45/9; Airstrip Lease; East Pilbara |
| A35042 | 1991 | Newcrest Mining Ltd | Deserts Revenge | <1% | Annual Technical Report for Period ending 31/12/91 Deserts Revenge Group Project (M45/205-208,249) |
| A29698 | 1990 | Newmont Australia Ltd | Airstrip | <1% | Annual Report Period ended 18/12/89 Mining Lease 45/9; Airstrip Lease; East Pilbara |
| A30393 | 1990 | Newmont Australia Ltd | Deserts Revenge | <1% | Annual Technical Report to the Department of Mines Period end 02/02/1990 Deserts Revenge Group Mining Leas |
| A26728 | 1989 | Newmont Australia Ltd | Telfer North | <1% | Telfer North, relinquishment report, EL45/36, period ending 17th December 1988. |
| A26302 | 1988 | Newmont Australia Ltd | Airstrip | <1% | Airstrip Lease - East Pilbara Mining Lease 45/9 18/12/1988 |
| A22472 | 1988 | Newmont Australia Ltd | Airstrip | <1% | Annual report for period ended 18/12/87 Mining Lease 45/9 (Airstrip Lease) East Pilbara |
| A23572 | 1988 | Newmont Australia Ltd | Telfer | <1% | Annual Technical Report period ended 02/02/88. Telfer Project. M45/205-208,249. Deserts Revenge Group |
| A19766 | 1987 | Newmont Holdings Pty Ltd | Telfer | <1% | Annual report period ended 18/12/86 Mining Lease M45/9 (Airstrip Lease) East Pilbara |
| A23041 | 1987 | Newmont Australia Ltd | Telfer North | <1% | Annual Technical Report for period ended 18/12/87 Exploration Licence45/36 (Telfer North) |
| A19759 | 1987 | Newmont Holdings Pty Ltd | Telfer Dome | <1% | Final Technical Report on Area Relinquished Under Section65 of the Mining Act of Western Australia Exploration |
| A19284 | 1986 | Battle Mountain Australia Inc | Trotman Hills | <1% | Trotman Hills Project, Third progress [annual] report, From January 1 1986 to December 31 1986, E45/328...471 |
| A19758 | 1986 | Newmont Holdings Pty Ltd | Telfer | <1% | Annual report period ended 18/12/86 Exploration Licence E45/36 Telfer Project |
| A14770 | 1985 | Newmont Pty Ltd | Telfer Dome | <1% | Telfer Dome Project, Annual Report for the period 01/12/1983 to 01/12/1984, E45/36. |
| A16605 | 1985 | Duval Mining Australia Ltd | Trotman Hills | <1% | Trotman Hills Project, Annual Report for the period 01/01/1985 to 31/12/1985, E45/328-331, 333-34, 349 ,367, 3 |
| A15374 | 1985 | Duval Mining Australia Ltd | Trotman Hills- Carr Boyd | <1% | Trotman Hills - Carr Boyd (JV) Project [s], Non-statutory Report: First Progress Report for the period ending |
| A16740 | 1985 | Newmont Holdings Pty Ltd | Telfer Dome | <1% | Final Technical Report on area relinquished under section 65 of the Mining Act of Western Australia Exploratio |
| A16900 | 1985 | Newmont Holdings Pty Ltd | Telfer Dome | <1% | Annual report period ended 18/12/85 Exploration Licence E45/36 Telfer Dome |
| A16599 | 1984 | Duval Mining Australia Ltd | Trotman Hills | <1% | Trotman Hills Project, Annual Report for the period ending 31st December 1984, (Field Seasons), E45/328-331, 3 |
| A7263 | 1977 | Geopeko | Paterson Range | <1% | Paterson Range Project, Non-statutory Report: Geology Plans [undated]. |
| A16301 | 1753 | Occidental Minerals Corp | M2415/0: Paterson Province uranium/coppe | <1% | M2415/0: Paterson Province uranium/copper-lead-zinc exploration |
| A26832 | 1753 | Newmont Australia Ltd | Deserts Revenge | <1% | Annual Technical Report Period Ended 02/02/89 M45/205,206,207,208,249; Deserts Revenge Group |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 11 years · 14 Apr 2037
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 45/764 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 45/764? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.