NextMaps›WA Tenements›P 52/1710

P 52/1710

LiveProspecting LicenceShire of MeekatharraPeak Hill M.F. District

P 52/1710 is a live prospecting licence in the Shire of Meekatharra, Western Australia, held by Obsidian Mining Corporation Pty Ltd. Granted on 28 Aug 2025 for 4 years, it expires on 27 Aug 2029. The ground is covered by 76 historical WAMEX reports.

Area
159.463ha
Expires
Aug 2029
in 3 years
WAMEX reports
76
WA median is 53
Report drilling
29
of 76 reports
Free Tenure Pack for P 52/1710
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For P 52/1710 that covers 76 WAMEX reports · 16 earlier titles on the ground since 1958 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Meekatharra Explore on the live map

Register summary

Holder
Obsidian Mining Corporation Pty Ltd
Local government
Shire of Meekatharra
Application received
20 May 2025
Commenced
28 Aug 2025
Expiry
27 Aug 2029
Term
4 Years

The full record on P 52/1710

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares (no change of holder on record)
  • The full record: 2 years of expenditure, 11 conditions and 17 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (3 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

76 historical WAMEX exploration reports intersect P 52/1710: 40 report geochemistry or sampling, 43 include a digital data package.
Work on record: Rock chip sampling 22 · Soil sampling 21 · RC drilling 19 · Geological mapping 18 · Surface geochemistry 14 · Geological reconnaissance 12. Resource declared in A119243 (2019), A116042 (2018), A108432 (2016), A96988 (2013) and 3 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on P 52/1710, free for new accounts.
When this ground was worked · 75 of 76 reports dated
21960s
1970s
41980s
81990s
72000s
482010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A144318 2024 Alchemy Resources (Three Rivers) Pty Ltd Horseshoe <1% Final Surrender Report for Horseshoe Project Tenement E 52/3292 For the Period 8 May 2015 to 11 July 2024
A138313 2024 Sandfire Resources Limited Horseshoe <1% E 52/3046, E 52/3047, E 52/3870 and E 52/3926 Horseshoe Project Final Surrender Report 2023
A133969 2023 Bryah Resources Limited Bryah Basin 6.4% EIS Co-funded drilling final report (R24) Olympus RC
A124043 2020 Bryah Resources Limited Bryah Basin <1% Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020
A124183 2020 Paterson Resources Ltd Horseshoe South <1% Horseshoe South Annual Technical Report E52/02569 for the period ending 17 June 2020
71 more reports
A123395 2020 Sandfire Resources Limited Horseshoe <1% C36/2015 Horseshoe Project Combined Annual Report for the period ending 15/02/2020
A119243 2019 Billabong Gold Pty Ltd Three Rivers <1% Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec
A119276 2019 Bryah Resources Limited Aquarius <1% EIS Co-Funded Drilling Final Report (R#17) Aquarius Project C205/2017, Report Period: 1 January 2018 to 31 Dec
A120075 2019 Horseshoe Metals Limited Horseshoe Lights <1% Horseshoe Lights Annual Report C124/2009 for the period 14 January 2018 to 13 January 2019, M52/00743, E52/020
A120357 2019 Bryah Resources Limited Bryah Basin <1% Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03
A116042 2018 Billabong Gold Pty Ltd; Independence Group Nl Three Rivers <1% Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec
A118246 2018 Hardey Resources Limited Horseshoe South <1% Annual Technical Report for Horseshoe South Project E52/2569, Period Ending 17 June 2018
A116163 2018 Horseshoe Metals Limited Horseshoe Lights <1% Annual Report Horseshoe Lights Project C4/2005 For the Period 14 January 2017 to 13 January 2018, E52/02042, M
A117043 2018 Bryah Resources Limited Bryah Basin <1% Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323
A117205 2018 Horseshoe Metals Limited Horseshoe Lights 20% Annual Report for P52/1546 Horseshoe Lights for the period 17/05/2017 - 16/05/2018
A117206 2018 Horseshoe Metals Limited Horseshoe Lights 61% Annual Report for P52/1547 Horseshoe Lights for the period 17 May 2017 to 16 May 2018
A110691 2017 Horseshoe Metals Limited Horseshoe Lights 9.3% Final Surrender Report For the Period 14 January 2009 to 13 January 2017 Horsehoe Lights Project P 52/01203, P
A112081 2017 Billabong Gold Pty Ltd Three Rivers <1% Annual Mineral Exploration Report for the Three Rivers Project C183/2009 For the Period 1 January 2016 to 31 D
A114931 2017 Jalein Pty Ltd Peak Hill 6.4% Annual Report E52/3454 Peak Hill Project for the period 5 August 2016 to 4 August 2017
A115400 2017 Horseshoe Metals Limited Horseshoe South <1% Annual Report - Horseshoe South E52/02569 For the Period 18 June 2016 to 17 June 2017
A110797 2017 Horseshoe Metals Limited Horseshoe Lights <1% Annual Technical Report - Horseshoe Lights C124/2009 13 January 2016 to 13 January 2017
A108432 2016 Horseshoe Metals Limited Horseshoe Lights 2% C124/2009 Horseshoe Lights E52/2042, M52/743, P52/1203-P52/1211 Annual Report for the period 14th January 2015
A109217 2016 Independence Group Nl Bryah - Three Rivers <1% BRYAH (THREE RIVERS) PROJECT E52/3292 PEAK HILL MINERAL FIELD, WA, ANNUAL TECHNICAL REPORT FOR THE PERIOD 15 J
A110485 2016 Horseshoe Metals Limited Horseshoe South <1% Annual Report - Horseshoe South Project E52/02569 for the period 17 June 2015 to 17 June 2016
A109854 2016 Allkarri Holdings Pty Ltd Milgun 6.4% Final Surrender Report for Milgun Project E52/02775 For the Period 31 May 2012 to 30 May 2016
A105044 2015 Horseshoe Metals Limited Horseshoe Lights 2% Annual Report Horseshoe Lights (C124/2009) E52/2042, M52/743, P52/1203 - P52/1211 for the period 14th January
A105045 2015 Horseshoe Metals Limited Horseshoe Lights <1% Partial Surrender E52/2042 Horseshoe Lights for the period 27 November 2008 to 13 January 2015
A106047 2015 Horseshoe Metals Limited Horseshoe South <1% Horseshoe South E52/2569 Annual Exploration Report for the Twelve Month Period 18 June 2014 to 17 June 2015
A106052 2015 Allkarri Holdings Pty Ltd Peak Hill 6.4% Peak Hill E52/2775 Annual Report for the period ending 30/05/2015
A106580 2015 Independence Group Nl Fiddler <1% Fiddler Project E52/1881 Final Surrender Report 20th February 2006 to 19th February 2015
A105246 2015 Alchemy Resources (Three Rivers) Pty Ltd; Independence Group Three Rivers <1% COMBINED ANNUAL REPORT ON C183/2009, BRYAH (THREE RIVERS) PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBE
A101219 2014 Alchemy Resources (Three Rivers) Pty Ltd Three Rivers <1% Three Rivers Project Combined Annual Report for the Period 1st January 2013 to 31st December 2013, C183/2009,
A101240 2014 Horseshoe Metals Limited Horseshoe Lights 2% Horseshoe Lights (C124/2009) E52/2042, M52/743, P52/1203-P52/1211 annual Report for the period 14th January 20
A102422 2014 Elysium Resources Ltd Horseshoe South <1% Horseshoe South E52/2569 Annual Exploration Report for the Twelve Month Period 18 June 2013 to 17 June 2014
A102854 2014 Allkarri Holdings Pty Ltd Peak Hill 6.4% Peak Hill Project, Annual Report for the period 01/06/2012 to 31/05/2014, E52/2775.
A98693 2013 Alchemy Resources Ltd Three Rivers <1% Exploration Incentive Scheme: Final Report Bryah Basin Copper-Gold Project for the period 1st of July 2012 to
A98989 2013 United Orogen Ltd Horseshoe South <1% Annual report for the period 18 June 2012 to 17 June 2013, Horseshoe South, E52/2569
A96614 2013 Alchemy Resources (Three Rivers) Pty Ltd Three Rivers <1% Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M5
A96988 2013 Padbury Mining Ltd Peak Hill <1% Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557,
A97357 2013 Horseshoe Metals Limited Horseshoe Lights 2% Horseshoe Lights Project, Annual Report for the period 14th January 2012 to 13th January 2013, E52/2042; M52/7
A98813 2013 Allkarri Holdings Pty Ltd Peak Hill 6.4% Annual Report E52/2775 Peak Hill Project for the period 1 June 2012 to 31 May 2013
A93401 2012 Horseshoe Metals Limited Horseshoe Lights 2% Horseshoe Lights Project, Annual Report for the period 14th January 2011 to 13th January 2012, E52/2042; M52/7
A93081 2012 Padbury Mining Ltd Peak Hill - Telecom Hill <1% 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011
A93998 2012 Padbury Mining Ltd Peak Hill <1% Final Surrender Report E52/1481 Peak Hill Project Western Australia
A94110 2012 Alchemy Resources (Three Rivers) Pty Ltd Peak Hill <1% Peak Hill NWN Project Combined Annual Report for the Period 1st July 2011 to 30th June 2012
A94435 2012 United Orogen Ltd Horseshoe South <1% Annual Technical Report for Horseshoe South Project E52/2569, Period Ending 17 June 2012
A95586 2012 Naracoota Resources Ltd Horseshoe 27% P52/1398 Horseshoe Project Annual Report for the period 14th September 2011 to 13th September 2012
A89074 2011 Grosvenor Gold Pty Ltd Peak Hill <1% Peak Hill NWN Project 2010 Annual Report C17/2008, Report Period: 1 July 2009 – 30 June 2010, E52/1668, E52/16
A89335 2011 Padbury Mining Ltd Peak Hill <1% Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010
A89795 2011 Horseshoe Metals Limited Horseshoe 2% Annual Report C124/2009 Annual Report for the period 14th January 2010 - 13th January 2011, E52/2042, M52/743,
A90990 2011 United Orogen Ltd Horseshoe South <1% Annual Technical Report for Horseshoe South Project E52/2569, Period Ending 17 June 2011
A91724 2011 Grosvenor Gold Pty Ltd Peak Hill NWN <1% Peak Hill NWN Project CR17/2008 2010 Annual Report Report Period: 1 July 2010 – 30 June 2011
A85953 2010 Aurium Resources Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on
A86299 2010 Murchison Copper Mines Pty Ltd Horseshoe Lights 2% Horseshoe Lights Combined Annual Report (C124/2009) Tenements E52/02042, M52/00743, P52/01203, P52/01204, P52
A81263 2009 Aurium Resources Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52
A84328 2009 Aurium Resources Ltd PEAK HILL <1% FINAL SURRENDER REPORT E52/1587 PEAK HILL FOR THE PERIOD - 13th September 2007 to 12th September 2008
A84440 2009 Grosvenor Gold Pty Ltd Peak Hill NWN <1% Peak Hill NWN Project 2009 Annual Report, 1 July 2008 – 30 June 2009
A79777 2008 Eagle Gold Mines Pty Ltd Peak Hill <1% PEAK HILL NWN PROJECT E52/1668, E52/1678, E52/1722, E52/1723, E52/1730, E52/1810, E52/1852, E52/1881 Combined
A80081 2008 Aurium Resources Ltd Peak Hill <1% ANNUAL REPORT E52/1587 PEAK HILL FOR THE PERIOD, 13th September 2007 to 12th September 2008
A77729 2008 Greater Pacific Gold Ltd Peak Hill <1% ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1481 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series
A71687 2006 Greater Pacific Gold Ltd Peak Hill <1% Annual Technical report on Exploration Licence E52/1481 on the Peak Hill Sheet, For the year ending November 2
A55241 1998 Plutonic Operations Ltd Twin Rivers 20% Twin Rivers Joint Venture, Project 570 Horseshoe Mine Region P52/773-777 Annual Report 12/05/97 - 11/05/98
A53041 1997 Plutonic Operations Ltd Horseshoe Mine 13% Horseshoe Mine Project, Annual Report for the period 02/08/1996 to 01/08/1997, E52/761.(Twin Rivers J.V.)
A51574 1997 Plutonic Operations Ltd Twin Rivers 20% Twin Rivers (JV) Project, Annual Report for the period 12/05/96 to 11/05/97, P52/773-777
A48269 1996 Plutonic Operations Ltd Twin Rivers 12% Twin Rivers (JV) Project, Annual Report for the period 12/05/95 to 11/05/96 , P52/770-777.
A48899 1996 Plutonic Operations Ltd Horseshoe Mine 13% Horseshoe Mine Project,Annual Report for the period 02/08/1995 to 01/08/1996, E52/761. (Twin Rivers Joint Vent
A46705 1995 Sabminco Nl Jupiter - Horseshoe - Saturn - Pluto - M 1.4% Review of Compilation of Technical Data, Jupiter Project, E52/760, Horseshoe South Project, P52/770-777, E52/7
A41870 1994 Sabminco Nl Saturn - Horseshoe <1% Preliminary Comments on Regolith Geology, Saturn Project, Peak Hill, WA. Report to Sabminco NL, Horseshoe Mine
A32751 1991 Commercial Minerals Ltd Mount Fraser <1% Mount Fraser Project, Annual Report for the period ending 31/12/1990, M52/65.
A31103 1989 Barrack Exploration Pty Ltd Aquarius - Horseshoe Lights 1.7% Progress Report on Results of BLEG Soil Programmes, Aquarius Prospect, Horseshoe Lights Area, WA
A31105 1989 Barrack Exploration Pty Ltd Saturn - Mars - Venus - Aquarius <1% Report to the Department of Mines on the RAB Drilling Programmes Carried Out on M52/64, 108, 146, 147, P52/442
A31106 1989 Barrack Exploration Pty Ltd Aquarius 1.7% Aquarius Project, Progress Report on Geological Mapping, 1989
A31606 1989 Barrack Exploration Pty Ltd Horseshoe Lights 2.4% Progress Report on Results of Bleg Stream Aquarius and Fiddlers Prospect (E52/50,90; M52/08,64-67,76,86,124) (
A912 1967 Electrolytic Zinc Company Of Australasia Ltd Horseshoe Lights <1% Horseshoe Lights Project, Non-statutory Report: Geological Report, August 1967, TR70/3528H.
A911 1966 Electrolytic Zinc Company Of Australasia Ltd Horseshoe Lights <1% Horseshoe Lights Project, Non-statutory Report: Brief Exploration Report. March 1966, TR70/3528H.
A24603 1753 Barrack Exploration Pty Ltd Aquarius <1% Report to the Department of Mines on Exploration Completed on M52/64-67, E52/50, P52/136, 183, 184, (Aquarius

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over P 52/1710 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold P 52/1710? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-09. Compiled by NextMaps. Verify against primary sources before reliance.