Balmoral
Balmoral is an iron ore, gold and nickel exploration project in the Shire of Ashburton, Western Australia, earlier explored for diamond and base metals. Its 47 WAMEX reports were lodged by 8 companies between 2000 and 2020, most recently Artemis Resources Limited in 2020.
Who has explored here
Companies that lodged reports over Balmoral, most active first.
Who controls this ground today
Today 51 live and pending tenements sit over the Balmoral ground, held under 16 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Balmoral
- Local government
- Shire of Ashburton
- Commodities targeted
- Diamond 26 · Iron 15 · Gold 13 · Base Metals 7 · Nickel 6 · Platinum Group Elements 5 · Copper 3 · Lead 3
- Work on record
- Stream sediment sampling 24 · Indicator minerals 21 · Geophysical interpretation 19 · Rock chip sampling 16 · Loam sampling 13 · Aerial magnetic surveys 12 · Heavy minerals (%) 7 · Aerial EM surveys 6
- Resource declared
- Never on this record
- Downloadable data
- 36 of 47 reports include a digital package
- Reports with no exploration
- 2 of 47 record no work done
- Report types
- Annual 39 · Final Surrender 4 · Core Library Drilling 1 · Co-Funded Drilling 1 · Partial Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A123848 | 2020 | Artemis Resources Limited | Combined Annual Report for the Balmoral Project, C124/2018 (E47/3707–3709), for the period 21 March 2019 to 20 |
| A121479 | 2019 | Artemis Resources Limited | Donated Drillcore from Artemis Resources Ltd, Drillhole 18ABAD01 |
| A120097 | 2019 | Karratha Gold Pty Ltd | Combined Annual Report for C124/2018 Balmoral Project for the period 21 March 2018 to 20 March 2019, E47/03707 |
| A118065 | 2018 | Artemis Resources Limited | Report on Co-Funded Drilling of Diamond Drillhole 18ABAD01 at Balmoral, West Pilbara (R#17) |
| A100072 | 2013 | Mineralogy Pty Ltd | Annual report for the period 5 September 2011 to 4 September 2013, P47/1496 Balmoral Magnetite Iron Ore Projec |
| A100071 | 2013 | Mineralogy Pty Ltd | Annual report for the period 5 September 2011 to 4 September 2012, P47/1495 Balmoral Magnetite Iron Ore Projec |
| A100070 | 2013 | Mineralogy Pty Ltd | Annual report for the period 5 September 2012 to 4 September 2013, P47/1494 Balmoral Magnetite Iron Ore Projec |
| A100069 | 2013 | Mineralogy Pty Ltd | Annual report for the period 4 September 2011 to 3rd September 2012, P47/1493 Balmoral Magnetite Iron Ore Proj |
| A99162 | 2013 | Api Management Pty Ltd | Annual Technical Report for the period 2 August 2012 to 1 Ausgust 2013, Balmoral Project E47/1255 |
| A95516 | 2012 | Mineralogy Pty Ltd | Balmoral Project, Annual report for the period 4 September 2011 to 3rd September 2012, P47/1496 |
| A95515 | 2012 | Mineralogy Pty Ltd | Balmoral Project, Annual report for the period 4 September 2011 to 3rd September 2012, P47/1495 |
| A95514 | 2012 | Mineralogy Pty Ltd | Balmoral Project, Annual report for the period 4 September 2011 to 3rd September 2012, P47/1494 |
| A95513 | 2012 | Mineralogy Pty Ltd | Balmoral Project, Annual report for the period 4 September 2011 to 3rd September 2012, P47/1493 |
| A90573 | 2011 | Fox Resources Ltd | Balmoral Project C192/2006 Final Report For Period Ending April / May 2011, E47/1125, E47/1126, E47/1834, E47/ |
| A87267 | 2010 | Fox Radio Hill Pty Ltd | Balmoral Project - Annual Combined Report For the Period 30 May 2009 to 29 May 2010, C192/2010. |
| A86964 | 2010 | Api Management Pty Ltd | Annual Technical Report for the period 16 April 2009 to 15 April 2010, Balmoral Project, E47/1129 |
| A86963 | 2010 | Api Management Pty Ltd | Annual Technical Report for the period 24 April 2009 to 23 April 2010, Balmoral Project, E47/1130 |
| A82902 | 2009 | Fox Resources Ltd | Balmoral Project - C192/2009 Combined Annual E47/1125, E47/1126, E47/1834, E47/1835, E47/1836, E47/1867, For t |
| A82496 | 2009 | Api Management Pty Ltd | Annual Technical Report for the period 23 April 2008 to 22 April 2009, Balmoral Project, E47/1130 |
| A82495 | 2009 | Api Management Pty Ltd | ANNUAL TECHNICAL REPORT FOR THE PERIOD 16 APRIL 2008 to 15 APRIL 2009 BALMORAL PROJECT EXPLORATION LICENCE E47 |
All 47 report numbers over Balmoral
Other projects in the Shire of Ashburton
What does the exploration record say about Balmoral?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.