Onslow
Onslow is a base metals, sand and gold exploration project in the Shire of Ashburton, Western Australia, earlier explored for copper. Its 63 WAMEX reports were lodged by 20 companies between 1982 and 2025, most recently Skryne Hill Pty Ltd in 2025. Of those, 1 declares a resource.
Who has explored here
Companies that lodged reports over Onslow, most active first.
Who controls this ground today
Today 81 live and pending tenements sit over the Onslow ground, held under 15 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Onslow
- Local government
- Shire of Ashburton
- Commodities targeted
- Copper 25 · Gold 22 · Sand 16 · Base Metals 11 · Lead 6 · Silver 6 · Mineral Sands 6 · Salt 6
- Work on record
- Geological reconnaissance 13 · Geophysical interpretation 12 · RC drilling 11 · Aerial magnetic surveys 9 · Gravity surveys 9 · Soil sampling 9 · Aboriginal site surveys 8 · Diamond drilling 8
- Resource declared
- Yes, in 1 report: A22957 (1987)
- Downloadable data
- 35 of 63 reports include a digital package
- Reports with no exploration
- 5 of 63 record no work done
- Report types
- Annual 52 · Final Surrender 6 · Non-statutory 3 · Partial Surrender 2
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A147960 | 2025 | Skryne Hill Pty Ltd | Onslow Base Metals Project E08/3232 (Sailfish) Final Surrender for the period 18 January 2022 to 17 January 20 |
| A139497 | 2024 | Skryne Hill Pty Ltd | Project Lobster E08-3231 Annual Report for the period ending 25/02/2024 |
| A137334 | 2023 | Onslow Metals Group Pty Ltd | Onslow Annual Report E08/3216 for the period ending 10/08/2023. |
| A134866 | 2023 | Metal Hawk Limited | Annual Report Onslow Project E08/3231 for the period ending 25/02/2023. |
| A134053 | 2023 | Skryne Hill Pty Ltd | Onslow Project Annual Report E08/3232 for the period ending 17/01/2023. |
| A132355 | 2022 | Onslow Metals Group Pty Ltd | Onslow Base Metals E08/03216 Annual Report for the period ending 10/08/2022 |
| A125086 | 2020 | Quarry Park Pty Ltd; Yarri Mining Pty Ltd; Cauldron Energy L | Annual Technical Report E08/2329 Onslow Project for the period ending 10/06/2020 |
| A114668 | 2017 | Onslow Resources Ltd; Yarri Mining Pty Ltd | C138/2013 Ashburton River & Onslow Camp Dune Sands Annual Report 01 July 2016 - 30 June 2017, E08/01728, E08/0 |
| A114317 | 2017 | North Rossa Pty Ltd | Onslow Sand Project C12/2017 Combined Annual Report for the period ending 21/04/2017, E08/02618, E08/02837, E0 |
| A112078 | 2017 | Onslow Premium Sands Pty Ltd | Onslow Sands Project E08/2333 Annual Mineral Exploration Report for the period 5 August 2015 to 4 August 2016 |
| A110108 | 2016 | Yarri Mining Pty Ltd; Onslow Resources Ltd | Annual Report for the Onslow Project C138/2013 - Period 01/7/2015 to 30/6/2016, E08/01728, E08/01991, E08/0199 |
| A109085 | 2016 | Yarri Mining Pty Ltd | Annual Technical Report - Onslow Dune Sands Project M08/496 for the period 18/04/2015 to 17/04/2016 |
| A106223 | 2015 | Yarri Mining Pty Ltd; Onslow Resources | Onslow Project (C138/2013) Annual Report for the Period 01/7/2014 to 30/6/2015, E08/1728, E08/1991, E08/1995, |
| A105794 | 2015 | Yarri Mining Pty Ltd | Annual Report (18.04.2014 17.04.2015) Onslow Dune Sand Resources Mining Lease M08/496 EXPLORATION REPORT |
| A105757 | 2015 | Lewis J G | E08/2021 (Onslow) Annual Report for the period 18 May 2014 - 18 May 2015 |
| A105366 | 2015 | Yarri Mining Pty Ltd | Annual Report (13.01.2014 12.01.2015) Onslow Dune Sand Resources Mining Tenement M08/473 EXPLORATION REPORT |
| A102603 | 2014 | Regional Resources Nw Pty Ltd | Annual Report (16.03.2013 - 15.03.2014) Onslow Group 1 (C45/2014) Combined Reporting Timbuck Creek / Mt Stuart |
| A102465 | 2014 | Yarri Mining Pty Ltd | Onslow Dune Sand Project M08/496 Annual Report for the Period 18/04/2013 to 17/04/2014 |
| A101736 | 2014 | Yarri Mining Pty Ltd | Annual Report (18.02.2013 - 17.02.2014) Onslow Dune Sand Resources Exploration Licence E08/1991 Technical Rep |
| A98735 | 2013 | Yarri Mining Pty Ltd | Annual Report (10.07.2012 - 09.07.2013) Onslow Dune Sand Resources Project Mining Lease M08/488 Exploration Re |
All 63 report numbers over Onslow
Other projects in the Shire of Ashburton
What does the exploration record say about Onslow?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.