Metal Hawk Limited
Metal Hawk Limited holds 26 Western Australian tenements covering 85,511 ha. It has lodged 27 open-file WAMEX reports between 2019 and 2026, mostly for nickel, gold and lithium.
Who holds paper over Metal Hawk's ground?
2 of Metal Hawk's live titles carry a caveat or mortgage held by another party. It holds 4 live titles together with another holder.
Caveats and mortgages over its ground
Holds ground with
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Metal Hawk holds today
Metal Hawk holds 26 tenements across 85,511 ha. The register records 2 titles transferred in and 4 transferred out, the latest in June 2025.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Nickel 22 · Gold 21 · Lithium 4 · Rare Earth Elements 3 · Platinum Group Elements 2 · Base Metals 2 · Cobalt 1 · Copper 1
- Where they worked
- City of Kalgoorlie-Boulder 16, Shire of Dundas 4, Shire of Esperance 4, Shire of Coolgardie 1, Shire of Ashburton 1, Shire of Leonora 1
- Work on record
- Surface geochemistry 13 · Aircore drilling 8 · Rock chip sampling 8 · Soil sampling 8 · Heritage 6 · Moving loop EM surveys 5 · Auger drilling 4 · Diamond drilling 4
- Resource declared
- Never on this record
- Downloadable data
- 25 of 27 reports include a digital package
- Report types
- Annual 16 · Final Surrender 6 · Partial Surrender 3 · Co-Funded Drilling 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A155415 | 2026 | Blair North | Blair North Final Surrender Report P25/2716 for the period ending 25/05/2026. C178/2020 |
| A149739 | 2025 | Norseman East | Norseman East Final Surrender Report E63/02042 for the period ending 30/6/2025 |
| A146174 | 2025 | Yarmany | E 16/503 PArtial Surrender Report Yarmany for the period ending 11/12/2024. |
| A146096 | 2025 | Kanowna East | Kanowna East Project E27/596 Partial Surrender Report for the period ending 04/12/2024 |
| A144182 | 2024 | Norseman East | Norseman East Annual Report E63/02042 for the period 23 July 2023 to 22 July 2024 |
| A143186 | 2024 | Fraser South | Fraser South Project Combined Annual Report C112/2021 for the period ending 31/03/2024. E 63/1936,E 69/3809 |
| A143012 | 2024 | Fraser South | Fraser South Surrender Report E69/3809 for the period ending 15/04/2024. (C112/2021) |
| A136474 | 2023 | Norseman East | Norseman East Annual Report E63/2042 for the period ending 21/07/2023. |
| A135443 | 2023 | Clinker Hill | Clinker Hill P25/2290 Surrender Report for the period 15 May 2015 to 6 April 2023 |
| A135071 | 2023 | Clinker Hill | Clinker Hill Surrender Report P25/2335 for the period ending 02/03/2023. (C144/2019) |
| A134866 | 2023 | Onslow | Annual Report Onslow Project E08/3231 for the period ending 25/02/2023. |
| A134262 | 2023 | Clinker Hill | Clinker Hill Final Surrender Report P 25/2289 for the period ending 27/01/2023. |
| A134209 | 2023 | Clinker Hill | Clinker Hill Combined Report 2022 C144/2019 for the period ending 31/12/2022. |
| A132664 | 2022 | Emu Lake | Emu Lake Partial Surrender Report E27/562 for the period 7 September 2016 to 29 August 2022 |
| A132407 | 2022 | Norseman East | Norseman East Annual Report E63/02042 for the period ending 22/07/2022 |
| A131971 | 2022 | Kanowna East | Kanowna East Completion Report- EIS Co-Funded Agreement For the Period 9 February 2022 to 23 August 2022 (R23) |
| A131370 | 2022 | Fraser South | Annual Technical Report for C112/21 Fraser South Project for the Period 1 April 2021 to 31 March 2022. |
| A129824 | 2022 | Clinker Hill | Clinker Hill Combined Annual Report C144/2019 for the period ending 31/12/2021 |
| A126213 | 2021 | Clinker Hill | Clinker Hill Combined Annual Mineral Exploration Report C144/2019 for the period ending 31/12/2020 |
| A125166 | 2020 | Emu Lake | Emu Lake Project Combined Report C10/2019 Annual Report for the period ending 31/7/2020 |
Report numbers filed by Metal Hawk Limited
Named projects
Project names Metal Hawk Limited used in their reports, with the shire each sits in.
Watching what Metal Hawk Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.