Clinker Hill
Clinker Hill is a gold, nickel and platinum group elements exploration project in the City of Kalgoorlie-Boulder, Western Australia. Its 73 WAMEX reports were lodged by 12 companies between 2002 and 2023, most recently Black Cat (Kal East) Pty Ltd in 2023.
Who has explored here
Companies that lodged reports over Clinker Hill, most active first.
Who controls this ground today
Today 63 live and pending tenements sit over the Clinker Hill ground, held under 15 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Clinker Hill
- Local government
- City of Kalgoorlie-Boulder
- Commodities targeted
- Gold 69 · Nickel 33 · Platinum Group Elements 6
- Work on record
- Soil sampling 27 · Auger drilling 22 · Geological mapping 14 · Geological reconnaissance 14 · Surface geochemistry 10 · Ground EM surveys 7 · Rock chip sampling 7 · Geophysical interpretation 4
- Resource declared
- Never on this record
- Downloadable data
- 28 of 73 reports include a digital package
- Reports with no exploration
- 7 of 73 record no work done
- Report types
- Annual 64 · Final Surrender 9
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A137750 | 2023 | Black Cat (Kal East) Pty Ltd | Final Surrender for the Clinker Hill Project P25/2320 for the period ending 14/10/2023 |
| A135443 | 2023 | Metal Hawk Limited | Clinker Hill P25/2290 Surrender Report for the period 15 May 2015 to 6 April 2023 |
| A135071 | 2023 | Metal Hawk Limited | Clinker Hill Surrender Report P25/2335 for the period ending 02/03/2023. (C144/2019) |
| A134262 | 2023 | Metal Hawk Limited | Clinker Hill Final Surrender Report P 25/2289 for the period ending 27/01/2023. |
| A134209 | 2023 | Metal Hawk Limited | Clinker Hill Combined Report 2022 C144/2019 for the period ending 31/12/2022. |
| A129824 | 2022 | Metal Hawk Limited | Clinker Hill Combined Annual Report C144/2019 for the period ending 31/12/2021 |
| A126213 | 2021 | Metal Hawk Limited | Clinker Hill Combined Annual Mineral Exploration Report C144/2019 for the period ending 31/12/2020 |
| A125102 | 2020 | Aruma Exploration Pty Ltd | Annual Report for C140/2015 Clinker Hill project for the period 21 July 2019 to 20 July 2020, P 25/02320,E 25/ |
| A123089 | 2020 | Metal Hawk Limited | Clinker Hill C144/2019 Combined Annual Report for the period ending 31 December 2019, P25/02290, P25/02289, P2 |
| A121389 | 2019 | Aruma Resources Limited | Annual Report for C140/2015 Clinker Hill Project for the period 21 July 2018 to 20 July 2019, P25/02320, E25/0 |
| A120223 | 2019 | Spartan Exploration Pty Ltd | Annual Report for P25/2290 Clinker Hill Project for the period 15th April 2018 to 14th April 2019 |
| A120121 | 2019 | Spartan Exploration Pty Ltd | Annual Report for Clinker Hill P25/2371 for the Period 03/04/2018 to 02/04/2019 |
| A119889 | 2019 | Spartan Exploration Pty Ltd | Annual Report for Clinker Hill P25/2335 for the Period 08/03/2018 to 07/03/2019 |
| A119528 | 2019 | Spartan Exploration Pty Ltd | Annual Report for Clinker Hill, P25/2289, for the Period 30/01/2018 to 29/01/2019 |
| A118712 | 2019 | Spartan Exploration Pty Ltd | Annual Report for Clinker Hill, P25/2370, for the Period 16/11/2017 to 15/11/2018 |
| A117963 | 2018 | Aruma Resources Limited | Annual Report for C140/2015 Clinker Hill Project for the period 21 July 2017 to 20 July 2018, P25/02201, P25/0 |
| A116940 | 2018 | Spartan Exploration Pty Ltd | Annual Report for P25/2290 Clinker Hill Project for the period 15th April 2017 to 14th April 2018 |
| A116872 | 2018 | Spartan Exploration Pty Ltd | Annual Report for Clinker Hill P25/2371 for the Period 03/04/2017 to 02/04/2018 |
| A116653 | 2018 | Spartan Exploration Pty Ltd | Annual Report for Clinker Hill P25/2335 for the Period 08/03/2017 to 07/03/2018 |
| A116291 | 2018 | Spartan Exploration Pty Ltd | Annual Report for the Clinker Hill Project P25/2289, for the period 30th January 2017 to 29th January 2018 |
All 73 report numbers over Clinker Hill
Other projects in the City of Kalgoorlie-Boulder
What does the exploration record say about Clinker Hill?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.