Mount Thirsty
Mount Thirsty is a nickel, cobalt and lithium exploration project in the Shire of Dundas, Western Australia. Its 86 WAMEX reports were lodged by 20 companies between 1981 and 2025, most recently Ndalamo Platinum Pty Ltd in 2025. Of those, 11 declare a resource.
Who has explored here
Companies that lodged reports over Mount Thirsty, most active first.
Who controls this ground today
Today 51 live and pending tenements sit over the Mount Thirsty ground, held under 9 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Mount Thirsty
- Local government
- Shire of Dundas
- Commodities targeted
- Nickel 64 · Gold 52 · Cobalt 44 · Manganese 11 · Base Metals 9 · Copper 5 · Lithium 5 · Palladium 4
- Work on record
- Soil sampling 22 · RC drilling 19 · Rock chip sampling 18 · Geological reconnaissance 16 · Geophysical interpretation 16 · Geological mapping 14 · Metallurgy 11 · Mineral resource estimate 11
- Resource declared
- Yes, in 11 reports: A125270 (2020), A122129 (2019), A115375 (2017), A91756 (2011), A91101 (2011), A84162 (2009) and 5 more
- Downloadable data
- 50 of 86 reports include a digital package
- Reports with no exploration
- 5 of 86 record no work done
- Report types
- Annual 63 · Final Surrender 14 · Partial Surrender 7 · Core Library Drilling 1 · Non-statutory 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A146136 | 2025 | Ndalamo Platinum Pty Ltd | Mt Thirsty P63/2265 Annual Report for the period ending 09/01/2025 |
| A125270 | 2020 | Mt Thirsty Joint Venture | C28/1997 Annual Report for the Period 01 November 2019 to 31 October 2020, Mount Thirsty Project, R63/4, E63/1 |
| A124713 | 2020 | Norseman Resources Pty Ltd | Annual Technical Report for the Period 1/07/19 to 30/06/20 - Combined Report No: C122/2001 Mount Thirsty Proje |
| A122661 | 2020 | Liontown Resources Limited | First Annual Report for P63/2127 Mt Thirsty for the period 29 January 2019 to 28 January 2020 |
| A122129 | 2019 | Conico Ltd | Annual Report for the Period 01 November 2018 to 31 October 2019, Mount Thirsty Project C28/1997, E63/01267, E |
| A119173 | 2018 | Neometals Ltd | Core Library Sampling Results for Drillcore MTDD011 (K891) |
| A118474 | 2018 | Mt Thirsty Joint Venture | Annual Report for the Period 01 November 2017 to 31 October 2018, Mount Thirsty Project C28/1997, E63/01267, E |
| A115617 | 2018 | Galileo Mining Ltd | Final Surrender Report P63/01693 Mt Thirsty for the period 3 December 2009 to 30 November 2017 |
| A115616 | 2018 | Platx Pty Ltd | Final Surrender Report P63/01900 [C122/2001] Mount Thirsty Project for the period 25/07/2013 - 03/11/2017 |
| A115375 | 2017 | Meteore Metals Pty Ltd | C28/1997 Annual Report for the Period 01 November 2016 to 31 October 2017, Mount Thirsty Project, R63/4 (E63/3 |
| A114619 | 2017 | Platx Pty Ltd | Combined Annual Report - Mt Thirsty Project C122/2001 for the period 1 July 2016 to 30 June 2017, E63/01041, P |
| A110445 | 2016 | Meteore Metals Limited | Annual Report for the Period 01 November 2015 to 30 October 2016, Mount Thirsty Project, R63/4 (E63/373) & E63 |
| A109674 | 2016 | Platx Pty Ltd | Combined Annual Report Mt Thirsty Project C122/2001, E63/01041, P63/01693, P63/01900 for the period 1 July 201 |
| A107238 | 2015 | Mt Thirsty Joint Venture | Annual Report for the Period 01 November 2014 to 30 October 2015, Mount Thirsty Project, E63/373 & E63/1267 |
| A106531 | 2015 | Platx Pty Ltd | E 63/1041, P63/1693 & P63/1900 MT THIRSTY Annual Technical Report for the Period 1/07/14 to 30/06/15 Combined |
| A104386 | 2015 | Matsa Resources Ltd | Surrender Report Mt Thirsty E63/1348 for the period 23 April 2012 –24 July 2014 |
| A103462 | 2014 | Pioneer Resources Ltd | Combined Annual report for the Mount Thirsty Project, C220/2011 (E63/1182), Dundas Mineral Field, for the peri |
| A103280 | 2014 | Mt Thirsty Joint Venture | Mount Thirsty Project E63/1113 & E63/1268 (C28/1997) Surrender Report for the period 07/12/2009 to 29/10/2013 |
| A100121 | 2013 | Mt Thirsty Joint Venture | Annual Report for the Period 01 November 2012 to 30 October 2013, Mount Thirsty Project, E63/373, E63/1113, E6 |
| A99461 | 2013 | Platx Pty Ltd | Mt Thirsty Project, Partial Surrender Report for the period 25/06/2007 to 24/06/2013, E63/1041. [C122/200 |
All 86 report numbers over Mount Thirsty
Other projects in the Shire of Dundas
What does the exploration record say about Mount Thirsty?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.