Barra Resources Ltd
Barra Resources Ltd holds no tenure on the current Western Australian register. It has lodged 121 open-file WAMEX reports between 2000 and 2020, mostly for gold, nickel and cobalt.
Whose ground Barra Resources holds paper over
Barra Resources holds caveats or mortgages over 1 live title of other companies.
It holds caveats and mortgages over
See Barra Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
Exploration record
- Commodities targeted
- Gold 119 · Nickel 18 · Cobalt 6 · Manganese 3 · Base Metals 2 · Copper 1 · Lead 1 · Silver 1
- Where they worked
- Shire of Coolgardie 68, Shire of Menzies 44, Shire of Dundas 9
- Also filed as
- Barra Resources Limited · Barra Resources Ltd
- Work on record
- RC drilling 37 · Geological reconnaissance 30 · Soil sampling 29 · Geophysical interpretation 25 · Auger drilling 21 · Mineral resource estimate 19 · Geological mapping 18 · Rock chip sampling 18
- Resource declared
- Yes, in 19 reports: A121034 (2019), A115680 (2018), A104310 (2015), A103900 (2014), A103649 (2014), A101247 (2014) and 13 more
- Downloadable data
- 86 of 121 reports include a digital package
- Reports with no exploration
- 2 of 121 record no work done
- Report types
- Annual 109 · Partial Surrender 7 · Final Surrender 5
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A125121 | 2020 | Kangaroo Hills | Annual Report for the Kangaroo Hills Project C94/2015 for the period 1 July 2019 to 30 June 2020. P 15/05249,P |
| A124661 | 2020 | Phillips Find | Technical Report for the Phillips Find Project CR163/2006 for the period ending 30/06/2020 |
| A121059 | 2019 | Phillips Find | Annual Technical Report for the Phillips Find Project C163/2006 for the period 1 July 2018 to 30 June 2019 |
| A121034 | 2019 | Kangaroo Hills | Technical Report for the Kangaroo Hills Project C94/2015 For the Period 1 July 2018 to 30 June 2019 |
| A117681 | 2018 | Kangaroo Hills | Combined Annual Report for Kangaroo Hills Group (C94/2015)) 01 July 2017 - 30 June 2018 |
| A117508 | 2018 | Phillips Find | Combined Annual Report for Phillips Find Project (CR163/2006), 01 July 2017 - 30 June 2018 |
| A117268 | 2018 | Jaurdi Hills | C119/2017 Combined Annual Report for Jaurdi Hills Project for the period 1 July 2017 to 30 June 2018, P16/0299 |
| A115680 | 2018 | Burbanks | Burbanks M15/161 Annual Report for the period 5th November 2016 to 4th November 2017 |
| A115517 | 2017 | Carbine South | Final Report for Carbine South Project (C24/2009) for the period 24/09/2016-23/09/2017, P16/02422, P16/02423, |
| A114966 | 2017 | Phillips Find | Annual Technical Report for the Phillips Find Gold Project (C163/2006) for the period 1 July 2016 to 30 June 2 |
| A114637 | 2017 | Kangaroo Hills | Kangaroo Hills Annual Technical Report, C94/2015, 2017 for the period 1 July 2016 to 30 June 2017, P15/05249, |
| A110188 | 2016 | Carbine South | Combined Annual Technical Report for the Carbine South Project For the Period 24 September 2015 to 23 Septembe |
| A110115 | 2016 | Kangaroo Hills | Kangaroo Hills Annual Technical Report (C94/2015) P15/5249, and P15/5412 For the period 01 July 2015 – 30 June |
| A110100 | 2016 | Phillips Find | Annual Technical Report for the Phillips Find Project (C163/2006) For the Period 1 July 2015 to 30 June 2016 |
| A106981 | 2015 | Carbine South | Carbine South Project Annual Report (C24/2009) P16/2422, P16/2423, P16/2424 and P16/2425 For the period 24 Sep |
| A106869 | 2015 | Phillips Find | Annual Technical Report for the Phillips Find Project (C163/2006) for the period 01 July 2014 – 30 June 2015 |
| A106537 | 2015 | Kangaroo Hills | Kangaroo Hills Annual Technical Report (C94/2015) P15/5249, and P15/5412 For the period 01 July 2014 – 30 June |
| A104310 | 2015 | Burbanks | Burbanks Project, Annual Technical Report (C117/2008) M15/161; P15/5249 & 5412. For the period 05 November 201 |
| A103900 | 2014 | Carbine South | Carbine South Project C24/2009 Annual Report for the period 24/09/2013 to 23/09/2014, P16/2422, P16/2423, P16/ |
| A103649 | 2014 | Phillips Find | Phillips Find Project, Annual Report for the period 01/07/2013 to 30/06/2014, M16/130, 133, 168, 171, 242, & 2 |
Report numbers filed by Barra Resources Ltd
Named projects
Project names Barra Resources Ltd used in their reports, with the shire each sits in.
Watching what Barra Resources Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.