Angelo River
Angelo River is an iron ore exploration project in the Shire of East Pilbara, Western Australia. Its 38 WAMEX reports were lodged by 2 companies between 1990 and 2015, most recently Robe River Mining Co Pty Ltd in 2015. Of those, 8 declare a resource.
Who has explored here
Companies that lodged reports over Angelo River, most active first.
Who controls this ground today
Today 20 live and pending tenements sit over the Angelo River ground, held under 7 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Angelo River
- Local government
- Shire of East Pilbara
- Commodities targeted
- Iron 38
- Work on record
- RC drilling 27 · Geological mapping 16 · Geophysical logging 10 · Mineral resource estimate 8 · Aerial magnetic surveys 7 · Gamma gamma logging 7 · Geophysical interpretation 7 · Magnetic susceptibility 7
- Resource declared
- Yes, in 8 reports: A100727 (2014), A92476 (2012), A85519 (2010), A80690 (2009), A61194 (2000), A59436 (1999) and 2 more
- Downloadable data
- 14 of 38 reports include a digital package
- Report types
- Annual 33 · Partial Surrender 2 · Final Surrender 2 · Non-statutory 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A104557 | 2015 | Robe River Mining Co Pty Ltd | Angelo River Project Area Combined Annual Report Exploration Licences 47/754, 47/1050, 47/1795, 47/2086 & 52/1 |
| A102802 | 2014 | Rio Tinto Iron Ore | Angelo River Project,Partial Surrender Report for the period 06 July 2008 – 17 June 2014, E52/2044. |
| A100727 | 2014 | Rio Tinto Iron Ore | Angelo River Project, Annual Report for the period 22nd December 2012 to 21/12/2013, E47/754, 1050, 1795 & 20 |
| A96390 | 2013 | Rio Tinto Iron Ore | Angelo River Project, Annual Report for the period 22nd Ecember 2011 to 21st December 2012, E47/754, 1050, 179 |
| A92476 | 2012 | Rio Tinto Iron Ore | Angelo River Project Combined Annual Report (C146/2002) E47/754, E47/1050, E47/1795 and E52/1459 for the perio |
| A88947 | 2011 | Rio Tinto Iron Ore | Angelo River Project E47/754, E47/1050, E47/1795 and E52/1459 (C146/2002) Annual Technical Report for the Peri |
| A85519 | 2010 | Rio Tinto Iron Ore | Angelo River project E47/754, E47/1050, E47/1795 and E52/1459 (C146/2002) Annual Technical Report for the Peri |
| A80690 | 2009 | Rio Tinto Iron Ore | ANGELO RIVER PROJECT AREA (COMBINED) ANNUAL TECHNICAL REPORT EXPLORATION LICENCES E47/754, E47/1050, E47/1795 |
| A77021 | 2008 | Robe River Mining Co Pty Ltd | Angelo River Project Area Combined Annual Report for E47/754 , E47/1050, E52/1459 and E52/1512 for 22 December |
| A74078 | 2007 | Robe River Mining Co Pty Ltd | Angelo River E47/754,1050,1459,E52/1512, Combined Annual Report C146/2002 for the Period 22/12/2005 to 21/12/2 |
| A71659 | 2006 | Robe River Mining Co Pty Ltd | Angelo River, Combined Annual Report for E47/754,E47/1050 E52/1459 and E52/1512, for the period 22/12/2004 to |
| A70019 | 2005 | Robe River Mining Co Pty Ltd | Angelo River - Combined annual report for E47/754, E47/1050, E52/1459 and E52/1512 for the period 22/12/2003 t |
| A67970 | 2004 | Robe River Mining Co Pty Ltd | Angelo River Combined annual report for E47/754, E47/1050, E 52/1459 and E52/1512 for the period 22/12/2002 to |
| A66510 | 2003 | Robe River Mining Co Pty Ltd | Combined Annual Report period 22/12/01 - 21/12/02 Angelo River Project E47/1050 and E52/1512 Report No 1938 |
| A65539 | 2002 | Robe River Mining Co Pty Ltd | Angelo River Project Annual Report For E47/754 Period 27/09/01-26/09/02 Ref: 1772 |
| A65448 | 2002 | Robe River Mining Co Pty Ltd | Angelo River Project Annual Report For E52/1459 Period 23/08/01 - 22/08/02 |
| A63650 | 2001 | Robe River Mining Co Pty Ltd | Angelo River Project Annual Report for E47/754 period 27/09/00 - 26/09/01. Robe River Reference 1691. |
| A63486 | 2001 | Robe River Mining Co Pty Ltd | Angelo River Project Annual Report for E52/1459. |
| A61194 | 2000 | Robe River Mining Co Pty Ltd | Angelo River Annual Report for E47/754 for the period 27/09/99-26/09/00. Report Ref: 1491. |
| A59436 | 1999 | Robe River Mining Co Pty Ltd | Angelo River, Annual Report for E47/754, for the Period 27/09/1998 to 26/09/1999. |
All 38 report numbers over Angelo River
Other projects in the Shire of East Pilbara
What does the exploration record say about Angelo River?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.