Rio Tinto Iron Ore
Rio Tinto Iron Ore holds no tenure on the current Western Australian register. It has lodged 375 open-file WAMEX reports between 2008 and 2016, mostly for iron ore, gravel and sand.
Exploration record
- Commodities targeted
- Iron 364 · Gravel 10 · Sand 7 · Construction Materials 5 · Base Metals 1 · Copper 1 · Uranium 1 · Aluminium 1
- Where they worked
- Shire of Ashburton 258, Shire of East Pilbara 102, City of Karratha 7, Shire of Meekatharra 5, Shire of Upper Gascoyne 1, Shire of Derby-West Kimberley 1, Shire of Wiluna 1
- Work on record
- RC drilling 130 · Geophysical logging 92 · Mineral resource estimate 79 · Geological reconnaissance 70 · Heritage survey 61 · Geological mapping 45 · Flora 42 · Ground gravity surveys 40
- Resource declared
- Yes, in 79 reports: A108205 (2016), A107003 (2015), A106795 (2015), A106678 (2015), A106677 (2015), A106199 (2015) and 73 more
- Downloadable data
- 177 of 375 reports include a digital package
- Reports with no exploration
- 44 of 375 record no work done
- Report types
- Annual 330 · Final Surrender 30 · Partial Surrender 15
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A108886 | 2016 | Caliwingina Gap 2 - Mount Pyrton South - | Caliwingina Gap 2, Mt Pyrton South, Caliwingina Pool, Mt Pyrton Gap 1 and Mt Pyrton Final Surrender Report Exp |
| A108544 | 2016 | Turner 2 | Turner 2 Final Surrender Report Prospecting Licence 47/1709 for the period 30 April 2014 - 9 March 2016 |
| A108452 | 2016 | Mount Elvire | Mt Elvire Final Surrender Report Exploration Licence 47/2998 for the period 8 October 2014 – 26 February 2016 |
| A108356 | 2016 | Mount Pyrton Gap 2 | Mt Pyrton Gap 2 Annual Report Prospecting Licence 47/1601 Period ending 16 February 2016 |
| A108263 | 2016 | Mount Pyrton | Mt Pyrton Project Area Combined Annual Report Exploration Licences 47/2770, 47/2771, 47/2773, 47/2947, 47/2949 |
| A108205 | 2016 | Railway | Railway Annual Report E47/753 West Pilbara Mineral Field Western Australia Annual Report for the Period 3 Febr |
| A108054 | 2016 | Mount Wall West | MT WALL WEST PROJECT COMBINED ANNUAL TECHNICAL REPORT EXPLORATION LICENCE 47/1787 & PROSPECTING LICENCE 47/133 |
| A108050 | 2016 | Congo Bore | CONGO BORE ANNUAL REPORT EXPLORATION LICENCE 08/1771 Ashburton Mineral Field Western Australia Annual Report f |
| A107899 | 2015 | Capricorn Gap 6 - Capricorn Gap 8 - Ange | Capricorn Gap 6, Capricorn Gap 8 and Angelo River Gap Surrender Report Prospecting Licences 52/1186, 52/1188 a |
| A107763 | 2015 | Duck Creek North Gap 5 | Duck Creek North Gap 5 Partial Surrender Report Prospecting Licence 47/1332 for the period 18th December 2007 |
| A107761 | 2015 | Duck Creek North Gap 7 | Duck Creek North Gap 7 Surrender Report Prospecting Licence 47/1334 for the period 18th December 2007 – 17th D |
| A107568 | 2015 | Duck Creek North Gap 1 and 3 | Duck Creek North Gap 1 and 3 Final Surrender Report Prospecting Licences 47/1328 and 47/1330 for the period 18 |
| A107567 | 2015 | Mount Wall West Gap 4 | Mt Wall West Gap 4 Project P47/1336 Partial Surrender Report for the period 18 December 2007 – 23 November 201 |
| A107481 | 2015 | Weelamurra | Weelamurra Project Area Combined Annual Report, Exploration Licence 47/1311 and Prospecting Licence 47/1702 (C |
| A107028 | 2015 | Rockridge | Rockridge Project Annual Report Exploration Licence 47/1495 for the period 18 September 2014 – 17 September 20 |
| A107003 | 2015 | Ophthalmia Dam | Ophthalmia Dam Annual Report Exploration Licence 52/1894 for the period 10 September 2014 – 09 September 2015 |
| A106798 | 2015 | Mount Farquhar | Mt Farquhar Project Combined Annual Report Exploration Licences 47/45, 47/468, 47/469, 47/470 & 47/892 (C86/19 |
| A106797 | 2015 | Caliwingina | Caliwingina Project Area Combined Annual Report Exploration Licences 47/54, 47/473, 47/474, 47/1322 & 47/2950 |
| A106795 | 2015 | Mount Margaret | Mt Margaret Project Combined Annual Report Exploration Licences 47/475 & 47/585 (C43/1997) for the period 21 A |
| A106678 | 2015 | Texas East | Annual Report on Texas East Project C157/2006 Exploration Licences 47/1522, 47/1228 and 47/1922 for the period |
Report numbers filed by Rio Tinto Iron Ore
Named projects
Project names Rio Tinto Iron Ore used in their reports, with the shire each sits in.
Watching what Rio Tinto Iron Ore does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.