Kintyre Rocks
Kintyre Rocks is an uranium, gold and copper exploration project in the Shire of East Pilbara, Western Australia. Its 10 WAMEX reports were lodged by 3 companies between 2008 and 2016, most recently Cameco Australia Pty Ltd in 2016.
Who has explored here
Companies that lodged reports over Kintyre Rocks, most active first.
Who controls this ground today
Today 17 live and pending tenements sit over the Kintyre Rocks ground, held under 5 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Kintyre Rocks
- Local government
- Shire of East Pilbara
- Commodities targeted
- Uranium 10 · Copper 5 · Gold 5 · Lead 5 · Zinc 5 · Silver 3
- Work on record
- Geological mapping 4 · RC drilling 4 · Diamond drilling 3 · Geophysical interpretation 3 · Gamma gamma logging 2 · Geophysical logging 2 · Rock chip sampling 2 · Aerial EM surveys 1
- Resource declared
- Never on this record
- Downloadable data
- 10 of 10 reports include a digital package
- Report types
- Annual 9 · Co-Funded Drilling 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A109205 | 2016 | Cameco Australia Pty Ltd | C219/2007 Annual Report - Kintyre Rocks Project for the period 18 June 2015 to 17 June 2016, E45/2690, E45/269 |
| A106257 | 2015 | Cameco Australia Pty Ltd | Annual Report - Kintyre Rocks Project C219/2007, E45/2690, E45/2691 and P45/2656 for the period 18 June 2014 t |
| A102987 | 2014 | Cameco Australia Pty Ltd | Kintyre Rocks Project, Annual Report for the period 18/06/2013 to 17/06/2014, E45/2690-2691; P45/2656 (C219/20 |
| A98838 | 2013 | Mega Redport Pty Ltd | Kintyre Rocks Project (C219/2007) E45/2690, E45/2691 Combined Annual Report for the period 18/06/2012-17/06/20 |
| A94571 | 2012 | Mega Redport Pty Ltd | Kintyre Rocks Project E45/2690, E45/2691 C219/2007 Combined Annual Report 2011-2012 for the period 01/04/2011- |
| A91525 | 2011 | Mega Uranium Ltd | Three Blind Uranium Targets at Kintyre Rocks, DAG2010/00000043, 2010 Diamond Core Drilling Program, Drilling R |
| A91026 | 2011 | Mega Redport Pty Ltd | Kintyre Rocks Project Combined Annual Report C219/2007, E45/2690, E45/2691, Report Period: 01/04/2010-01/05/20 |
| A88264 | 2010 | Mega Redport Pty Ltd | Kintyre Rocks Project 2010 Annual Report, C219/2007 |
| A84070 | 2009 | Mega Redport Pty Ltd | Kintyre Rocks Project C219/2007 E45/2690, E45/2691 Annual Report, Period: 18/6/08 to 18/6/09 |
| A79175 | 2008 | Mega Redport Pty Ltd | KINTYRE ROCKS 2007 ANNUAL REPORT, C219/2007, E45/2690 and E45/2691 |
Other projects in the Shire of East Pilbara
What does the exploration record say about Kintyre Rocks?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.