Lake Mackay
Lake Mackay is an uranium, potash and gold exploration project in the Shire of East Pilbara, Western Australia. Its 47 WAMEX reports were lodged by 12 companies between 1998 and 2022, most recently Prodigy Gold Nl in 2022. Of those, 3 declare a resource.
Who has explored here
Companies that lodged reports over Lake Mackay, most active first.
Who controls this ground today
Today 46 live and pending tenements sit over the Lake Mackay ground, held under 13 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Lake Mackay
- Local government
- Shire of East Pilbara
- Commodities targeted
- Uranium 28 · Gold 22 · Copper 16 · Potash 16 · Base Metals 4 · Rare Earth Elements 2 · Nickel 1
- Work on record
- Aircore drilling 11 · Rock chip sampling 10 · Soil sampling 10 · Aerial EM surveys 9 · Aerial magnetic surveys 9 · Ground gravity surveys 7 · Aerial radioactivity surveys 6 · Surface geochemistry 6
- Resource declared
- Yes, in 3 reports: A108344 (2016), A102999 (2014), A94695 (2012)
- Downloadable data
- 27 of 47 reports include a digital package
- Reports with no exploration
- 9 of 47 record no work done
- Report types
- Annual 31 · Final Surrender 11 · Partial Surrender 4 · Co-Funded Drilling 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A131812 | 2022 | Prodigy Gold Nl | Partial Surrender Report E80/5001 Lake Mackay Project for the period ending 23/07/2022. |
| A131779 | 2022 | Prodigy Gold Nl | Annual Report E80/5001 Lake Mackay Project for Period ending 23 July 2022. |
| A128146 | 2021 | Igo Limited | E80/5001 Annual Report Lake Mackay Project for the period of 24 July 2020 to 23 July 2021 |
| A124912 | 2020 | Igo Limited | E80/5001 Lake Mackay Project Annual Technical Report for the period ending 23/07/2020 |
| A121164 | 2019 | Independence Group Nl | Annual Report Lake Mackay E80/5001 for the period 24 July 2018 to 23 July 2019 |
| A111931 | 2017 | Toro Energy Limited | E80/3484 & 3485 Partial Surrender Report for the period 16 May 2008 to 3 October 2016 |
| A111927 | 2017 | Toro Energy Limited | E80/3519 Final Surrender Report 16 May 2008 to 3 October 2016 |
| A109229 | 2016 | Toro Energy Ltd | Lake Mackay C20/2008 Annual Exploration Report for the period 1 May 2015 to 30 April 2016, E 80/03484, E 80/03 |
| A108600 | 2016 | Toro Energy Ltd | C203/2008 Lake Mackay Final Surrender Report For the Period 16 May 2008 to 1 February 2016, E80/03586, E80/035 |
| A108344 | 2016 | Agrimin Ltd | Annual Mineral Exploration Report C21/2015 Mackay Project Report Period 22nd January 2015 to 21st January 2016 |
| A106424 | 2015 | Toro Energy Limited | Lake Mackay E80/3584 Surrender Report for the period ended 15/05/2015 |
| A106260 | 2015 | Toro Energy Ltd | Combined Annual Technical Report For Period 1st May 2014 to 30th April 2015 Lake Mackay C203/2008. [E80/3484.. |
| A104162 | 2014 | Reward Minerals Ltd | Final Surrender Report (C101_2009) Lake Mackay Project E80/3748,3749,3750,3751 for the period ended 27/06/2014 |
| A103556 | 2014 | Toro Energy Ltd | Surrender Report E80/3582, E80/3585 and E80/3589. [Lake Mackay Project, for the period 16/05/2008 to 18/10/201 |
| A102999 | 2014 | Reward Minerals Ltd | Lake Mackay Project, Annual Report for the period 13/06/2014 to 27/06/2014, E80/3748-3751. [C101/2009] |
| A102605 | 2014 | Toro Energy Ltd | Combined Annual Technical Report For Period 1st May 2013 to 30th April 2014 Lake Mackay, C203/2008, E80/3483, |
| A102136 | 2014 | Toro Energy Ltd | Surrender Report for E80/3580, E80/3581, E80/3583 for the period 16 May 2008 to 12 March 2014 |
| A101181 | 2014 | State Resources Pty Ltd | Lake Mackay Project Combined Annual Technical Report for Exploration Licence 80/4444 for the period 5 January |
| A100935 | 2014 | State Resources Pty Ltd | Lake Mackay Project, Final Surrender Report for the period 13/10/2011 to 04/12/2014, E80/4547. |
| A100162 | 2013 | State Resources Pty Ltd | Lake Mackay Project Partial Combined Surrender Report for Exploration Licences 80/4273 & 80/4410 for the perio |
All 47 report numbers over Lake Mackay
Other projects in the Shire of East Pilbara
What does the exploration record say about Lake Mackay?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.