Tambina
Tambina is a gold and iron ore exploration project in the Shire of East Pilbara, Western Australia. Its 9 WAMEX reports were lodged by 6 companies between 1989 and 2020, most recently First Au Limited in 2020.
Who has explored here
Companies that lodged reports over Tambina, most active first.
Who controls this ground today
Today 19 live and pending tenements sit over the Tambina ground, held under 15 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Tambina
- Local government
- Shire of East Pilbara
- Commodities targeted
- Gold 8 · Iron 2 · Platinum 1
- Work on record
- Geological reconnaissance 3 · Rock chip sampling 3 · Soil sampling 3 · RC drilling 2 · Surface geochemistry 2 · Chromite 1 · Co-funded drilling 1 · Costeaning 1
- Resource declared
- Never on this record
- Downloadable data
- 7 of 9 reports include a digital package
- Report types
- Annual 6 · Final Surrender 1 · Co-Funded Drilling 1 · Non-statutory 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A125060 | 2020 | First Au Limited | Annual Mineral Exploration Report for Combined Reporting Group C83/2018 — Tambina Project for the period endin |
| A116790 | 2018 | Tambina Gold Pty Ltd; West Wits Mining Limited | Tambina Project M45/990 Annual Report for the period ending 21/03/2018 |
| A104072 | 2014 | Sheffield Resources Ltd | Tambina Project, Annual Report for the period 08/10/2013 to 07/10/2014, E45/3822. |
| A100016 | 2013 | Sheffield Resources Ltd | “Tambina” Annual Report Tenement E45/3822 For the Period 8th October 2012 to 7th October 2013 |
| A99986 | 2013 | Talga Resources Ltd | Tambina Project Final Surrender Report P45/2812 For the period 25th September 2012 to 11th October 2013 (C239/ |
| A98638 | 2013 | Talga Resources Ltd | Tambina Project 2013 Annual Report For the period 4th June 2012 to 3rd June 2013 Combined Reporting Group C239 |
| A98274 | 2013 | Talga Resources Ltd | Tambina Project – Co-funded RC Drilling 2012 - Final Report, M45/988, M45/990, M45/991, P45/2812 Report Perio |
| A94688 | 2012 | Talga Gold Ltd | Tambina Project 2012 Annual Report for the period 4th June 2011 to 3rd June 2012 Combined Reporting Group C239 |
| A26921 | 1989 | Auridiam Nl | Tambina, Evaluation Report, Prospecting Licences P45/1263-1275, P45/1279, P45/1281-1282, P45/1284, 45/1286-128 |
Other projects in the Shire of East Pilbara
What does the exploration record say about Tambina?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.