First Au Limited
First Au Limited holds 11 Western Australian tenements covering 7,841 ha. It has lodged 14 open-file WAMEX reports between 2018 and 2022, mostly for gold, base metals and iron ore.
What First Au holds today
First Au holds 11 tenements across 7,841 ha. The register records 3 titles transferred in, the latest in August 2026.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 14 · Base Metals 3 · Iron 1 · Copper 1 · Lithium 1
- Where they worked
- City of Kalgoorlie-Boulder 7, Shire of East Pilbara 7
- Work on record
- Surface geochemistry 7 · Soil sampling 6 · Rock chip sampling 5 · Diamond drilling 4 · Geological reconnaissance 4 · Aerial geophysical surveys 3 · Aerial magnetic surveys 3 · Core library 3
- Resource declared
- Yes, in 1 report: A122545 (2020)
- Downloadable data
- 12 of 14 reports include a digital package
- Reports with no exploration
- 1 of 14 record no work done
- Report types
- Annual 9 · Partial Surrender 2 · Co-Funded Drilling 1 · Core Library Drilling 1 · Final Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A131204 | 2022 | White Flag | C119/2020 White Flag Combined Reporting, Annual Report for the period ending 7 February 2022 |
| A127075 | 2021 | White Flag | White Flag Combined Reporting C119/2020 Annual Report for the period 8 February 2020 to 9 February 2021 |
| A126561 | 2021 | Gimlet | Report on the Gimlet Project - Cofunded drillhole - 20GDD004 - Round 20 - DAG2020/00111601 |
| A125800 | 2021 | Talga | Annual Mineral Exploration Report for Combined Reporting Group C92/2015 — Talga Project for the period ending |
| A125060 | 2020 | Tambina | Annual Mineral Exploration Report for Combined Reporting Group C83/2018 — Tambina Project for the period endin |
| A123271 | 2020 | White Flag | 2019 E 24 / 215 Annual Report, White Flag, 8 February 2019 to 9 February 2020 |
| A122545 | 2020 | Gimlet | Gimlet E26/174 Annual Report for the period 7 November 2018 to 6 November 2019 |
| A122141 | 2019 | Talga | Talga C92/2015 Annual Report for the period ending 15/09/2019, E45/03679, E45/03857, E45/04137, E45/04615 |
| A121477 | 2019 | Gimlet | Donated Drillcore from First Au Ltd, Drillhole 18GDD001 |
| A121416 | 2019 | Talga | Talga E45/4137 Partial Surrender for the period ending 16/08/2019 |
| A119052 | 2019 | Talga | Talga E45/4136 Final Surrender for the period 16/09/2013 to 07/01/2019 |
| A118659 | 2019 | Gimlet | Gimlet E26/174 Annual Report For the Period 7 November 2017 to 6 November 2018 |
| A118549 | 2018 | Talga | Talga Project C92/2015 Annual Report for the period ending 15/09/2018, E45/03679, E45/04615, E45/03857, E45/04 |
| A117365 | 2018 | Talga | Talga E45/3679 Partial Surrender Report for the period 12/06/2012 to 06/6/2018 |
Named projects
Project names First Au Limited used in their reports, with the shire each sits in.
Watching what First Au Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.