Barrabarra
Barrabarra is a nickel, copper and platinum group elements exploration project in the City of Greater Geraldton, Western Australia. Its 7 WAMEX reports were lodged by 3 companies between 2023 and 2026, most recently Chalice Mining Limited in 2026.
Who has explored here
Companies that lodged reports over Barrabarra, most active first.
Who controls this ground today
Today 11 live and pending tenements sit over the Barrabarra ground, held under 4 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Barrabarra
- Local government
- City of Greater Geraldton
- Commodities targeted
- Copper 7 · Nickel 7 · Platinum Group Elements 7 · Gold 4
- Work on record
- Aerial magnetic surveys 7 · Soil sampling 7 · Surface geochemistry 7 · Rock chip sampling 5 · Aerial EM surveys 4 · Aerial gravity gradiometer survey 4 · Ground EM surveys 3 · Moving loop EM surveys 3
- Resource declared
- Never on this record
- Downloadable data
- 7 of 7 reports include a digital package
- Report types
- Final Surrender 3 · Partial Surrender 3 · Annual 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A154942 | 2026 | Chalice Mining Limited | Final Surrender Report on E 70/5561, for the period 11 October 2022 to 23 April 2026. |
| A154938 | 2026 | Chalice Mining Limited | Final Surrender Report on the Barrabarra Project, E 70/5550 for the period 26 November 2020 to 23 April 2026 |
| A153997 | 2026 | Cgm (West Yilgarn) Pty Ltd | Final Technical Report on the Barrabarra Project, E 70/5705 for the period 24 of January 2022 to 31st of 13 Ma |
| A153470 | 2026 | Chalice Mining Ltd | Partial Surrender Report on the Barrabarra Project, E 70/5695 for the period 19th of March 2021 to 15th of Jan |
| A153292 | 2026 | Cgm (Wa) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E70/5550 for the period 26th of November 2020 to 20 of Oct |
| A152941 | 2025 | Cgm (Wa) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E70/5535 for the period 12th of November 2020 to 20 of Oct |
| A137777 | 2023 | Cgm (West Yilgarn) Pty Ltd | Annual Technical Report on the Barrabarra Project, E 70/5561 for the period 11th of October 2022 to 10th of Oc |
Other projects in the City of Greater Geraldton
What does the exploration record say about Barrabarra?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.