CGM (WA) Pty Ltd
CGM (WA) Pty Ltd holds 21 Western Australian tenements covering 144,648 ha. It is a subsidiary of Chalice Mining (ASX:CHN). It has lodged 60 open-file WAMEX reports between 2017 and 2026, mostly for nickel, platinum group elements and copper.
Who owns CGM (WA)?
CGM (WA) is a subsidiary of Chalice Mining (ASX:CHN). The group is named as a holder on 63 live Western Australian tenements.
The other companies Chalice Mining holds ground through, with the live tenements each is named on:
From Chalice Mining's consolidated entity disclosure statement, as at 2025-06-30.
Who holds paper over Chalice Mining's ground?
CGM (WA) is part of the Chalice Mining group, so these are the group's connections.
2 of Chalice Mining's live titles carry a caveat or mortgage held by another party. Chalice Mining holds caveats or mortgages over 5 live titles of other companies. It holds 2 live titles together with another holder.
Caveats and mortgages over its ground
It holds caveats and mortgages over
Holds ground with
See Chalice Mining's whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What CGM (WA) holds today
CGM (WA) holds 21 tenements across 144,648 ha. The register records 2 titles transferred out, the latest in August 2021.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Nickel 44 · Platinum Group Elements 41 · Copper 35 · Gold 25 · Lithium 2
- Where they worked
- Shire of Toodyay 11, Shire of Morawa 6, Shire of Northam 6, Shire of Menzies 5, Shire of Leonora 5, Shire of Yilgarn 4, Shire of Derby-West Kimberley 4, Shire of York 3, City of Kalgoorlie-Boulder 3, City of Greater Geraldton 2
- Also filed as
- Cgm (Wa) Pty Ltd · Cgm (Wa)
- Work on record
- Surface geochemistry 32 · Soil sampling 30 · Rock chip sampling 20 · Aerial EM surveys 16 · Aerial magnetic surveys 15 · Auger drilling 14 · Moving loop EM surveys 9 · Aircore drilling 8
- Resource declared
- Never on this record
- Downloadable data
- 50 of 60 reports include a digital package
- Reports with no exploration
- 6 of 60 record no work done
- Report types
- Annual 31 · Partial Surrender 22 · Final Surrender 6 · Co-Funded Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A154921 | 2026 | Barrabarra | Partial Surrender Report on the Barrabarra Project, E70/5551 for the period 26 November 2020 to 23 April 2026 |
| A153494 | 2026 | Barrabarra | Partial Surrender Report on the Barrabarra Project, E 70/5667 for the period 8th of January 2021 to 16th of De |
| A153493 | 2026 | Barrabarra | Partial Surrender Report on the Barrabarra Project, E 70/5666 for the period 8th of January 2021 to 16th of De |
| A153292 | 2026 | Barrabarra | Partial Surrender Report on the Barrabarra Project, E70/5550 for the period 26th of November 2020 to 20 of Oct |
| A153287 | 2026 | Barrabarra | Partial Surrender Report on the Barrabarra Project, E70/5551 for the period 26th of November 2020 to 20 of Oct |
| A152941 | 2025 | Barrabarra | Partial Surrender Report on the Barrabarra Project, E70/5535 for the period 12th of November 2020 to 20 of Oct |
| A150382 | 2025 | Kings | Partial Surrender Report for Kings, E 70/5361 for the period 11 December 2020 to 27 June 2025 |
| A150336 | 2025 | Kings | Final Surrender Report for Kings Project, E 70/5354 for the period 04 October 2021 to 27 June 2025 |
| A150249 | 2025 | Barrabarra | Partial Surrender Report on the Barrabarra Project, E70/5263 for the period 9th of July 2019 to 08 of July 202 |
| A150241 | 2025 | Julimar | Partial Surrender Report for Julimar Project, C143/2019 for the period 30 August 2019 to 29 August 2025. E 70/ |
| A150240 | 2025 | Julimar | Partial Surrender Report for Julimar Project, E70/5353 for the period 04 October 2021 to 27 June 2025 |
| A150093 | 2025 | Kings | Partial Surrender Report for Kings, E 70/5351 for the reporting period 04 October 2021 to 27 June 2025 |
| A149717 | 2025 | Julimar | Partial Surrender Report for Julimar Project E70/5353 for the period 04 October 2021 to 27 June 2025 |
| A149617 | 2025 | Kings | Partial Surrender Report for Kings, E 70/5361 for the period 11 December 2020 to 27 June 2025 |
| A148401 | 2025 | Kings - Julimar Regional | Partial Surrender Report for Kings, E 70/5360 for the reporting period 22 April 2021 to 20 March 2025 |
| A147970 | 2025 | Ragged Rock | Partial Surrender Report for Ragged Rock, E 70/5139 for the period 11th of February 2019 to 10th of February 2 |
| A146005 | 2025 | Kings - Julimar Regional | Final Technical Report for E 70/5352 Kings (formerly Julimar Regional) for the period 4 October 2021 to 21 Nov |
| A146004 | 2025 | Kings - Julimar Regional | Final Technical Report for Kings, E 70/5359 for the period 11 December 2020 to 21 November 2024 |
| A144807 | 2024 | Mount Joy | Partial Surrender Report for Mount Joy, E70/5125 for the period 12 September 2018 to 11 September 2024 |
| A144806 | 2024 | Ragged Rock | Partial Surrender Report for Ragged Rock, E70/5140 for the period 19 September 2018 to 10 September 2024 |
Report numbers filed by CGM (WA) Pty Ltd
Named projects
Project names CGM (WA) Pty Ltd used in their reports, with the shire each sits in.
Watching what CGM (WA) Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.