Barrabarra
Barrabarra is a nickel, platinum group elements and copper exploration project in the Shire of Morawa, Western Australia. Its 12 WAMEX reports were lodged by 2 companies between 2020 and 2026, most recently Cgm (West Yilgarn) Pty Ltd in 2026.
Who has explored here
Companies that lodged reports over Barrabarra, most active first.
Who controls this ground today
Today 20 live and pending tenements sit over the Barrabarra ground, held under 9 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Barrabarra
- Local government
- Shire of Morawa
- Commodities targeted
- Nickel 12 · Platinum Group Elements 11 · Copper 10 · Gold 4
- Work on record
- Aerial gravity gradiometer survey 9 · Aerial magnetic surveys 9 · Surface geochemistry 8 · Aerial EM surveys 7 · Soil sampling 6 · Rock chip sampling 5 · Moving loop EM surveys 3 · Aircore drilling 2
- Resource declared
- Never on this record
- Downloadable data
- 10 of 12 reports include a digital package
- Reports with no exploration
- 1 of 12 record no work done
- Report types
- Partial Surrender 10 · Final Surrender 1 · Annual 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A154937 | 2026 | Cgm (West Yilgarn) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E70/5263 for the period 9 July 2017 to 23 April 2026 |
| A154922 | 2026 | Cgm (West Yilgarn) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E 70/5667 for the period 08 January 2021 to 23 April 2026. |
| A154921 | 2026 | Cgm (Wa) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E70/5551 for the period 26 November 2020 to 23 April 2026 |
| A154920 | 2026 | Cgm (West Yilgarn) Pty Ltd | Partial Surrender Report on E70/5264 Barrabarra for the period 3 February 2020 to 13 April 2026 |
| A153770 | 2026 | Cgm (West Yilgarn) Pty Ltd | Partial Surrender Report on E70/5624 Barrabarra for the period 3 February 2020 to 02 February 2026. |
| A153494 | 2026 | Cgm (Wa) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E 70/5667 for the period 8th of January 2021 to 16th of De |
| A153493 | 2026 | Cgm (Wa) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E 70/5666 for the period 8th of January 2021 to 16th of De |
| A153490 | 2026 | Cgm (West Yilgarn) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E 70/5355 for the period 23rd of December 2020 to 16th of |
| A153287 | 2026 | Cgm (Wa) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E70/5551 for the period 26th of November 2020 to 20 of Oct |
| A150249 | 2025 | Cgm (Wa) Pty Ltd | Partial Surrender Report on the Barrabarra Project, E70/5263 for the period 9th of July 2019 to 08 of July 202 |
| A145739 | 2024 | Cgm (West Yilgarn) Pty Ltd | Final Technical Report on the Barrabarra Project, E70/6536 for the period 10th of November 2023 to 16th of Oct |
| A123781 | 2020 | Cgm (Wa) Pty Ltd | Annual Technical Report for the Barrabarra Project C25/2020 for the period ending 02/02/2020, E70/05263, E70/0 |
Other projects in the Shire of Morawa
What does the exploration record say about Barrabarra?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.