Julimar
Julimar is a platinum group elements, nickel and copper exploration project in the Shire of Toodyay, Western Australia. Its 6 WAMEX reports were lodged by Cgm (Wa) Pty Ltd between 2019 and 2025.
Who has explored here
Companies that lodged reports over Julimar, most active first.
Who controls this ground today
Today 41 live and pending tenements sit over the Julimar ground, held under 14 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Julimar
- Local government
- Shire of Toodyay
- Commodities targeted
- Platinum Group Elements 6 · Copper 5 · Nickel 5
- Work on record
- Soil sampling 6 · Surface geochemistry 6 · Auger drilling 3 · Moving loop EM surveys 3 · Rock chip sampling 3 · Aerial EM surveys 2 · Aerial magnetic surveys 2 · Diamond drilling 2
- Resource declared
- Never on this record
- Downloadable data
- 5 of 6 reports include a digital package
- Report types
- Partial Surrender 3 · Annual 3
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A150241 | 2025 | Cgm (Wa) Pty Ltd | Partial Surrender Report for Julimar Project, C143/2019 for the period 30 August 2019 to 29 August 2025. E 70/ |
| A150240 | 2025 | Cgm (Wa) Pty Ltd | Partial Surrender Report for Julimar Project, E70/5353 for the period 04 October 2021 to 27 June 2025 |
| A149717 | 2025 | Cgm (Wa) Pty Ltd | Partial Surrender Report for Julimar Project E70/5353 for the period 04 October 2021 to 27 June 2025 |
| A132953 | 2022 | Cgm (Wa) Pty Ltd | Annual Technical Report for Julimar Project, E 70/5354 for the period 04 October 2021 to 03 October 2022 |
| A125108 | 2020 | Cgm (Wa) Pty Ltd | Annual Technical Report for Julimar Nickel Copper PGE Project C143/2019 for the period 30 August 2019 to 29 Au |
| A121462 | 2019 | Cgm (Wa) Pty Ltd | Annual Technical Report for the Julimar Nickel Project E70/05118 for the period 3 September 2018 to 2 Septembe |
Other projects in the Shire of Toodyay
What does the exploration record say about Julimar?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.