Cheroona
Cheroona is a gold, copper and silver exploration project in the Shire of Meekatharra, Western Australia. Its 14 WAMEX reports were lodged by 6 companies between 2011 and 2023, most recently Auris Minerals Limited in 2023.
Who has explored here
Companies that lodged reports over Cheroona, most active first.
Who controls this ground today
Today 22 live and pending tenements sit over the Cheroona ground, held under 13 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Cheroona
- Local government
- Shire of Meekatharra
- Commodities targeted
- Gold 14 · Copper 9 · Silver 3 · Base Metals 2 · Zinc 1 · Palladium 1 · Platinum 1
- Work on record
- Ground EM surveys 6 · RC drilling 6 · Aircore drilling 5 · EM logging 5 · Rock chip sampling 4 · Aerial EM surveys 3 · Geophysical interpretation 3 · Ground gravity surveys 3
- Resource declared
- Never on this record
- Downloadable data
- 13 of 14 reports include a digital package
- Report types
- Annual 11 · Final Surrender 2 · Partial Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A137021 | 2023 | Auris Minerals Limited | Final Report Cheroona Project E51/1053 and E51/1391 for the period 1 March 2023 to 27 September 2023 |
| A134942 | 2023 | Auris Minerals Limited; Sandfire Resources Limited | Annual report for the Cheroona project, C22/2020 (E 51/1053, E 51/1120, E 51/1391 and E 51/1837), for the peri |
| A133736 | 2023 | Auris Minerals Limited; Sandfire Resources Limited | Final Surrender Report Cheroona E51/1838 for the period 19 January 2018 to 28 November 2022 |
| A130472 | 2022 | Sandfire Resources Limited | C22-2020 Cheroona Project Combined Annual Mineral Exploration Report for the period ending 28/02/2022. |
| A126871 | 2021 | Sandfire Resources Ltd | C22/2020 Cheroona Project Combined Annual Report for the period ending 1 March 2020 to 28 February 2021 |
| A123583 | 2020 | Sandfire Resources Limited | C22/2020 Cheroona Project Combined Annual Report for the period ending 28/2/2020 |
| A115827 | 2018 | Auris Exploration Pty Ltd | Annual Report for the Cheroona Project E51/1391 for the period 11 November 2016 to 10 November 2017 |
| A110586 | 2016 | Grosvenor Gold Pty Limited | E51/1391 Partial Surrender 2016 |
| A110328 | 2016 | Grosvenor Gold Pty Limited | Annual Technical Report Cheroona Project E51/1391 For the Period 11 November 2015 to 10 November 2016 |
| A107635 | 2016 | Grosvenor Gold Pty Ltd | Cheroona Project E51/1391 Annual Technical Report for the period 11 November 2014 to 10 November 2015 |
| A104325 | 2014 | Grosvenor Gold Pty Ltd | Cheroona Project, Annual Report for the period 11/11/2013 to 10/11/2014, E51/1391. |
| A100530 | 2014 | Northern Star Resources Ltd | Annual Report to the Department of Mines and Petroleum for the period 11/11/12 to 10/11/13 for E51/1391 Cheroo |
| A95854 | 2012 | Northern Star Resources Ltd | Cheroona Project, Annual Report for the period 11/11/2011 to 10/11/2012, E51/1391. |
| A92353 | 2011 | Northern Star Resources Ltd | CHEROONA PROJECT Murchison Mineral Field -Western Australia Annual Report For the reporting period 11/11/2010 |
Other projects in the Shire of Meekatharra
What does the exploration record say about Cheroona?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.