Kirkalocka
Kirkalocka is a gold, silver and iron ore exploration project in the Shire of Mount Magnet, Western Australia. Its 81 WAMEX reports were lodged by 20 companies between 1986 and 2025, most recently Tmb Nullagine Pty Ltd in 2025. Of those, 7 declare a resource.
Who has explored here
Companies that lodged reports over Kirkalocka, most active first.
Who controls this ground today
Today 100 live and pending tenements sit over the Kirkalocka ground, held under 41 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Kirkalocka
- Local government
- Shire of Mount Magnet
- Commodities targeted
- Gold 81 · Iron 14 · Base Metals 12 · Nickel 8 · Cobalt 7 · Silver 7 · Copper 6
- Work on record
- Soil sampling 30 · RC drilling 27 · Rock chip sampling 21 · Rotary drilling 18 · Geological mapping 16 · Geological reconnaissance 14 · Geophysical interpretation 13 · Surface geochemistry 13
- Resource declared
- Yes, in 7 reports: A100862 (2013), A96091 (2012), A92204 (2011), A88769 (2010), A73907 (2006), A52014 (1997) and 1 more
- Downloadable data
- 57 of 81 reports include a digital package
- Reports with no exploration
- 7 of 81 record no work done
- Report types
- Annual 52 · Final Surrender 16 · Partial Surrender 11 · Non-statutory 2
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A147864 | 2025 | Tmb Nullagine Pty Ltd | Final Surrender Report for Kirkalocka Project E59/2869 for the period ending 21/03/2025. |
| A144708 | 2024 | Kirkalocka Gold Spv Pty Ltd | Kirkalocka E59/02322 Partial Surrender Report for the period ending 25/07/2024 |
| A135740 | 2023 | Blaze Minerals Limited | Final Surrender Report E59/2310 Kirkalocka for the period ending 08/04/2023. |
| A135457 | 2023 | Kirkalocka Gold Spv Pty Ltd | Partial Surrender Exploration Report for Kirkalocka E59/2146 for the period ending 27/4/2023 |
| A129038 | 2021 | Blaze Minerals Limited | Annual Report for Kirkalocka Group C60/2018 2021 for the period ending 31/08/2021 |
| A125561 | 2020 | Kirkalocka Gold Spv Pty Ltd | Annual Report C189/1993 Kirkalocka project for the period 22 October 2019 to 21 October 2020.M 59/00232,E 59/0 |
| A125479 | 2020 | Blaze International Limited | Annual Report C60/2018 Kirkalocka Project for the period ending 31 August 2020, E 59/02237, E 59/02249, E 59/0 |
| A123183 | 2020 | Kirkalocka Gold Spv Pty Ltd | 2020 P59/1960 SURRENDER REPORT, 16 DECEMBER 2018 to 15 DECEMBER 2019 |
| A122391 | 2020 | Blaze International Limited | Kirkalocka Project E59/02280 Annual Report for the period 27 October 2018 to 26 October 2019 |
| A122012 | 2019 | Kirkalocka Gold Spv Pty Ltd | Annual Report C189/1993 Kirkalocka Project for the period 22 October 2018 to 21 October 2019 |
| A121673 | 2019 | Blaze International Limited | Kirkalocka E59/2330 Annual Report for the period 5 September 2018 to 4 September 2019 |
| A121072 | 2019 | Adaman Resources Pty Ltd | E 58/534 Annual Report for the period 26/07/2018 to 25/07/2019 |
| A120797 | 2019 | Kirkalocka Gold Spv Pty Ltd | E59/2318 Kirkalocka Project Annual Report or the period 18 July 2018 to 17 July 2019 |
| A118691 | 2019 | Blaze International Limited | Annual Technical Report for the Kirkalocka Project E59/02280 for the period 27/10/2017 - 26/10/2018 |
| A118555 | 2018 | Adaman Resources Pty Ltd | Kirkalocka Project C189/1993 Annual Report for the period 22 October 2017 to 21 October 2018, M59/00232, M59/0 |
| A117252 | 2018 | Minjar Gold Pty Ltd | Kirkalocka E59/1881 Final Report for the period 17 May 2008 to 15 May 2018 |
| A117200 | 2018 | Minjar Gold Pty Ltd | Kirkalocka Project E58/441 Final Report for the period 19/07/2013 - 15/05/2018 |
| A117147 | 2018 | Minjar Gold Pty Ltd | Kirkalocka E59/1775 Partial Surrender Report for the period 10 April 2012 to 9 April 2018 |
| A115520 | 2017 | Minjar Gold Pty Ltd | 2017 C189/1993 Annual Report, Kirkalocka Project for the period 22/10/2016-21/10/2017, E59/1775, E59/1881 E59/ |
| A112798 | 2017 | Minjar Gold Pty Ltd | Kirkalocka Gold Project E59/01775 Annual Report For the Period 15 March 2016 to 14 March 2017 |
All 81 report numbers over Kirkalocka
Other projects in the Shire of Mount Magnet
What does the exploration record say about Kirkalocka?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.