Blaze International Ltd
Blaze International Ltd holds no tenure on the current Western Australian register. It has lodged 51 open-file WAMEX reports between 2008 and 2021, mostly for uranium, gold and copper.
Exploration record
- Commodities targeted
- Uranium 26 · Gold 25 · Copper 2 · Base Metals 1
- Where they worked
- Shire of Wiluna 25, Shire of Leonora 14, Shire of Yalgoo 7, Shire of Mount Magnet 4, Shire of Sandstone 1
- Also filed as
- Blaze International Ltd · Blaze International Limited
- Work on record
- Rock chip sampling 13 · Soil sampling 10 · Auger drilling 9 · Geological reconnaissance 9 · Multielement analysis 8 · Scat sampling 7 · Surface geochemistry 7 · Aircore drilling 6
- Resource declared
- Never on this record
- Downloadable data
- 38 of 51 reports include a digital package
- Reports with no exploration
- 2 of 51 record no work done
- Report types
- Annual 39 · Final Surrender 12
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A127644 | 2021 | Leonora | Combined Annual Report Leonora C104/2020 for the period ending 01/04/2021 |
| A127631 | 2021 | Kirkalocka South | C54/2018 Kirkalocka South Annual Report for the period eding 08/04/2021 |
| A125794 | 2021 | Pig Bore | Annual Report P37/8728 Pig Bore project for the period 7 July 2019 to 7 July 2020 |
| A125793 | 2021 | Pig Bore | Annual report P37/8727 Pig Bore project for the period 7 July 2019 to 6 July 2020 |
| A125611 | 2020 | Thundelarra | Surrender Report E59/02120 Thundelarra Project for the period ending 10/09/2020 |
| A125479 | 2020 | Kirkalocka | Annual Report C60/2018 Kirkalocka Project for the period ending 31 August 2020, E 59/02237, E 59/02249, E 59/0 |
| A124382 | 2020 | Kirkalocka | C54/2018 Kirkalocka South Annual Report for the period ending 08/04/2020 |
| A124347 | 2020 | Two Mile Dam | Annual Report P37/8474 Two Mile Dam for the period ending 04/06/2020 |
| A124346 | 2020 | Two Mile Dam Andy Well | Annual Report: P37/8472 Two Mile Dam Andy Well for the period ending 04/06/2020 |
| A124342 | 2020 | Malcolm Dam | Annual Report E37/1165 Malcolm Dam Project for the period ending 28/05/2020 |
| A124318 | 2020 | Malcolm Dam | Annual Report E37/1164 Malcolm Dam Project for the period ending 1/5/2020 |
| A124317 | 2020 | Harriston | Harriston P37/08726 Annual Report for the period ending 31/01/2020 |
| A124312 | 2020 | Two Mile Dam | Annual Report Two Mile Dam P37/8725 for the period ending 31 January 2020 |
| A122391 | 2020 | Kirkalocka | Kirkalocka Project E59/02280 Annual Report for the period 27 October 2018 to 26 October 2019 |
| A122382 | 2020 | Thundelarra | E 59/02120 Thundelarra Annual Report for the period 1 December 2019 to 30 November 2020 |
| A121673 | 2019 | Kirkalocka | Kirkalocka E59/2330 Annual Report for the period 5 September 2018 to 4 September 2019 |
| A121539 | 2019 | Kirkalocka | 2019 Annual Technical Report Kirkalocka Project C60/2018 For the Period 30 August 2018 to 31 August 2019, E59/ |
| A121166 | 2019 | Pig Bore | Annual Report Pig Bore P37/8728 for the period 7 July 2018 to 6 July 2019 |
| A121165 | 2019 | Pig Bore | Annual Report P37/8727 Pig Bore Project For the Period 7 July 2018 to 6 July 2019 |
| A121152 | 2019 | Two Mile Dam | Annual Report P37/8474 Two Mile Dam Project for the period 5 June 2018 to 4 June 2019 |
Report numbers filed by Blaze International Ltd
Named projects
Project names Blaze International Ltd used in their reports, with the shire each sits in.
Watching what Blaze International Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.