RAV8
RAV8 is a nickel exploration project in the Shire of Ravensthorpe, Western Australia. Its 7 WAMEX reports were lodged by 3 companies between 2001 and 2012, most recently Phillips River Mining Ltd in 2012.
Who has explored here
Companies that lodged reports over RAV8, most active first.
Who controls this ground today
Today 4 live and pending tenements sit over the RAV8 ground, held under 3 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on RAV8
- Local government
- Shire of Ravensthorpe
- Commodities targeted
- Nickel 7 · Copper 2
- Work on record
- RC drilling 3 · Rehabilitation 3 · Diamond drilling 1 · Feasibility studies 1 · Ground EM surveys 1 · Hydrogeology 1 · IP surveys 1 · Resistivity surveys 1
- Resource declared
- Never on this record
- Downloadable data
- 5 of 7 reports include a digital package
- Report types
- Annual 7
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A93460 | 2012 | Phillips River Mining Ltd | Annual Mineral Exploration Report for the Rav8 Project M74/13 for the period 6 March 2011 to 5 March 2012 |
| A90490 | 2011 | Tectonic Resources Nl | ANNUAL MINERAL EXPLORATION REPORT FOR THE RAV8 PROJECT For the period 06.03.2010 to 05.03.2011 M74/13 |
| A87172 | 2010 | Tectonic Resources Nl | Annual Mineral Exploration Report for the RAV8 Project For the period 06.03.2009 to 05.03.2010 M74/13 |
| A74846 | 2007 | Tectonic Resources Nl | Annual Report for the Rav8 Project For the period 6/3/06 to 5/3/07, M74/13 Report No.RAV8_2006 |
| A65017 | 2002 | Tectonic Resources Nl | 2001 Annual Report on the Mining Lease M74/13 (Rav 8) Annual Report for the Period 27th March 2001 to 26th Mar |
| A62499 | 2001 | Tectonic Resources Ltd | 2000 Annual Report On The Mining Lease M74/13 (RAV 8) Annual Report for the Period 27th March 2000 to 26th Mar |
| A82535 | Mincor Resources Nl | RAV8, M74/013, Annual Technical Report For the Period 7 March 2008 to 6 March 2009 |
Other projects in the Shire of Ravensthorpe
What does the exploration record say about RAV8?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.