Bullfinch
Bullfinch is a gold, lithium and nickel exploration project in the Shire of Yilgarn, Western Australia. Its 66 WAMEX reports were lodged by 20 companies between 1970 and 2025, most recently Golden Horse Minerals Limited in 2025.
Who has explored here
Companies that lodged reports over Bullfinch, most active first.
Who controls this ground today
Today 100 live and pending tenements sit over the Bullfinch ground, held under 20 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Bullfinch
- Local government
- Shire of Yilgarn
- Commodities targeted
- Gold 59 · Nickel 13 · Copper 6 · Lithium 4 · Iron 4 · Molybdenum 3 · Platinum Group Elements 2 · Tungsten 2
- Work on record
- Soil sampling 22 · Rock chip sampling 16 · Geological reconnaissance 12 · Geophysical interpretation 11 · Rotary drilling 11 · Geological mapping 9 · Auger drilling 7 · RC drilling 7
- Resource declared
- Never on this record
- Downloadable data
- 28 of 66 reports include a digital package
- Reports with no exploration
- 9 of 66 record no work done
- Report types
- Annual 49 · Final Surrender 14 · Non-statutory 2 · Partial Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A149742 | 2025 | Golden Horse Minerals Limited | Final SUrrender Report for E77/2251 for the period ending 6/6/2025 |
| A145325 | 2024 | Camel Driver Pty Ltd | Bullfinch E77/2650 Surrender Report 2024 For the Period 17/05/2022-01/07/2024 |
| A143378 | 2024 | Riversgold Pty Ltd | Bullfinch E77/2418 Annual Technical Report for the period ending 30/04/2024 |
| A143323 | 2024 | Riversgold (Australia) Pty Ltd | Marvel Loch E77/2418 Partial Surrender Report for the period ending 30/04/2024. |
| A138214 | 2024 | Camel Driver Pty Ltd | Annual and Surrender Report Exploration Licence 77 / 2672 “Bullfinch” Yilgarn Mineral Field, Western Austr |
| A125548 | 2020 | Bullseye Mining Limited | C163/2013 (P77/4128 & P77/4129) Bullfinch Project Annual Report for the period ending 04/10/2020 |
| A125243 | 2020 | Torque Metals Limited | Bullfinch C82/2015, E77/02222, E77/02251, E77/02350 Annual Report for the period ending 03/08/2020 |
| A121909 | 2019 | Bullseye Mining Limited | Bullfinch C163/2013 Annual Report for the period 5 October 2018 to 4 October 2019, P 77/04128,P 77/04129 |
| A121826 | 2019 | Torque Metals Limited | Final Surrender EL77/2139 Bullfinch Project for the period 21 February 2014 to 20 February 2019 |
| A121532 | 2019 | Talga Resources Ltd | Bullfinch Project C82/2015 Annual Report to the DMIRS for the period 4 August 2018to 3 August 2019, E77/02222, |
| A118216 | 2018 | Bullseye Mining Limited | C163/2013 Bullfinch Project for the period 5 October 2017 to 4 October 2018, P77/04128, P77/04129 |
| A118063 | 2018 | Talga Resources Ltd; Torque Metals Pty. Ltd. | Bullfinch Project C82/2015 Annual Report to the DMIRS for the period 4 August 2017 to 3 August 2018, E77/02139 |
| A115707 | 2018 | Bullseye Mining Limited | C163/2013 Bullfinch Project Final Surrender for the period 4 June 2015 to 11 November 2017 Tenements P774209, |
| A115414 | 2017 | Bullseye Mining Limited | Bullfinch Combined Report C163/2013 Annual Report for the period 5 October 2016 to 4 October 2017, P77/04128, |
| A114587 | 2017 | Talga Resources Ltd | Bullfinch Project C82/2015 Annual Report to the DMIRS for the period 4 August 2016 to 3 August 2017, E77/02139 |
| A111935 | 2017 | Talga Resources Ltd | Bullfinch Project C82/2015 Annual Report for the period 4 August 2015 to 3 August 2016, E77/02139, E77/02221, |
| A110381 | 2016 | Bullseye Mining Limited | Combined Annual Report C163/2013 Bullfinch Project for the period 5 October 2015 to 4 October 2016, P77/04128, |
| A107198 | 2015 | Talga Resources Ltd | Bullfinch Project 2015 Annual Report for the period 4th August 2014 to 3rd August 2015 Combined Reporting Grou |
| A105425 | 2015 | Bullseye Mining Limited | Annual Combined Report C163/2013 Bullfinch Project Reporting Period 5th October 2013 – 4th October 2014, P77/4 |
| A105126 | 2015 | Talga Resources Ltd | Bullfinch Project E77/2139 Annual Report for the period 21st February 2014 to 20th February 2015 |
All 66 report numbers over Bullfinch
Other projects in the Shire of Yilgarn
What does the exploration record say about Bullfinch?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.