Riversgold Ltd
Riversgold Ltd holds 22 Western Australian tenements covering 42,700 ha through 3 registered companies. It has lodged 20 open-file WAMEX reports between 2017 and 2024, mostly for gold and lithium.
Companies Riversgold holds ground through
Riversgold (ASX:RGL) holds Western Australian ground through 3 registered companies, with the live tenements each is named on:
From Riversgold's consolidated entity disclosure statement, as at 2025-06-30.
Who Riversgold holds ground with
It holds 1 live title together with another holder.
Holds ground with
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Riversgold holds today
Riversgold holds 22 tenements across 42,700 ha through its companies. The register records 8 titles transferred in, the latest in August 2026.
- Which tenements its companies hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 19 · Lithium 9
- Where they worked
- City of Kalgoorlie-Boulder 13, Shire of Yilgarn 4, Shire of East Pilbara 2, Shire of Narembeen 1
- Also filed as
- Riversgold Pty Ltd · Riversgold Ltd
- Work on record
- Geological reconnaissance 7 · Geophysical interpretation 5 · Historical drilling data 4 · Soil sampling 4 · Structural interpretation 4 · Auger drilling 3 · Rock chip sampling 3 · Surface geochemistry 3
- Resource declared
- Never on this record
- Downloadable data
- 16 of 20 reports include a digital package
- Reports with no exploration
- 9 of 20 record no work done
- Report types
- Annual 20
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A143378 | 2024 | Bullfinch | Bullfinch E77/2418 Annual Technical Report for the period ending 30/04/2024 |
| A142856 | 2024 | Alloy | C201/2020 Annual Technical Report-Alloy JV for the period 5 October 2022 to 4 October 2023 |
| A142854 | 2024 | Kurnalpi South | Kurnalpi South C200/2020 Annual Technical Report for the period ending 30/04/2024 |
| A139374 | 2024 | Bull Finch | Annual Report for Bullfinch E77/2418 for the period ending 30/04/2023 |
| A139234 | 2024 | Kurnalpi South | Annual Report 2023 for Kurnalpi South for the period ending 30/04/2023 |
| A137800 | 2023 | Kurnalpi | Kurnalpi E28/3060 Annual Report for the period ending 15/09/2023 |
| A137250 | 2023 | Miracle | Miracle Creek Annual Report E45/5983 for the period ending 14/03/2023 |
| A137244 | 2023 | Five Mile Creek | Five Mile Creek Annual Report E46/1411 for the period ending 9/3/2023 |
| A135768 | 2023 | Kurnalpi | Annual Report for C202/2020 Kurnalpi for the period ending 20/09/2022. E 25/0538,E 25/0540,E 28/2580 |
| A135716 | 2023 | Nevoria North | Nevoria North Annual Tenement Report E77/2588 for the period ending 26/11/2022. |
| A135367 | 2023 | Mount Hampton | Annual Report for the Mount Hampton Project (E70/6022) from 24/03/2022 to 23/03/2023 |
| A135366 | 2023 | Marvel Loch | Annual Report for the Marvel Loch Project (E77/2588) from 27/11/2022 to 28/11/2023 |
| A129190 | 2022 | Kurnalpi | Annual Report for C201/2020 Kurnalpi Project for the period 5 October 2020 to 4 October 2021. E 28/02599,E 28/ |
| A128938 | 2021 | Kurnalpi | Annual Report for C202/2020 Kurnalpi Project for the period ending 20/09/2021 |
| A116868 | 2018 | Kurnalpi | Annual Report for E2802582 Kurnalpi Project for the period 09/03/2017 - 09/03/2018 |
| A116866 | 2018 | Kurnalpi | Annual Report for E2802581 Kurnalpi For the Period 9 March 2017 to 8 March 2018 |
| A115201 | 2017 | Kurnalpi | Annual Technical Report for: E28/2583-I Kurnalpi Project for the period 21 September 2016 to 20 September 2017 |
| A115200 | 2017 | Kurnalpi | Annual Technical Report for E25/540-I Kurnalpi For the Period 21 September 2016 to 20 September 2017 |
| A115198 | 2017 | Kurnalpi | Annual Technical Report for: E28/2580-I Kurnalpi Project for the period 21 September 2016 to 20 September 2017 |
| A115196 | 2017 | Kurnalpi | Annual Technical Report for E25/538-I for the period 21 September 2016 to 20 September 2017 |
Named projects
Project names Riversgold Ltd used in their reports, with the shire each sits in.
Watching what Riversgold Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.