Cauldron Energy Ltd
Cauldron Energy Ltd holds 29 Western Australian tenements covering 96,472 ha. It has lodged 73 open-file WAMEX reports between 2009 and 2026, mostly for uranium, gold and copper.
Who holds paper over Cauldron Energy's ground?
7 of Cauldron Energy's live titles carry a caveat or mortgage held by another party.
Caveats and mortgages over its ground
Also a private individual, over 1 title.
See Cauldron Energy's whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Cauldron Energy holds today
Cauldron Energy holds 29 tenements across 96,472 ha. The register records 17 titles transferred in, the latest in July 2026.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Uranium 58 · Gold 12 · Copper 9 · Base Metals 5 · Lead 4 · Zinc 4 · Platinum Group Elements 2 · Mineral Sands 1
- Where they worked
- Shire of Ashburton 66, Shire of East Pilbara 3, Shire of Dalwallinu 2, City of Kalgoorlie-Boulder 1, Shire of Yilgarn 1
- Also filed as
- Cauldron Energy Limited · Cauldron Energy Ltd
- Work on record
- Geophysical interpretation 20 · Geological interpretation 11 · Aerial EM surveys 9 · Geophysical logging 9 · Historical drilling data 8 · Passive seismic 8 · Core library 7 · Diamond drilling 7
- Resource declared
- Yes, in 3 reports: A112404 (2017), A108107 (2016), A104823 (2015)
- Downloadable data
- 44 of 73 reports include a digital package
- Reports with no exploration
- 10 of 73 record no work done
- Report types
- Annual 50 · Partial Surrender 11 · Final Surrender 8 · Co-Funded Drilling 3 · Core Library Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A153634 | 2026 | FLAGSTAFF | Partial Surrender Report for E08/3088 (Flagstaff) for the period ending 06/10/2025. |
| A145934 | 2024 | Melrose | Annual Technical Report E 70/6160 Melrose Project for the period ending 30/08/2024cay |
| A137697 | 2023 | Melrose | Annual Technical Report for E70/6160 - Melrose Project for the period ending 30/08/2023 |
| A133434 | 2023 | Partial Surrender Report - E08/2774 for the period ending 18/08/2022. | |
| A125086 | 2020 | Onslow | Annual Technical Report E08/2329 Onslow Project for the period ending 10/06/2020 |
| A123946 | 2020 | Yanrey North | Annual Technical Report for Yanrey North Tenement - E08/2387 for the period ending 18/1/2020 |
| A123944 | 2020 | Yanrey North | Annual Technical Report for Yanrey North Tenement - E08/2386 for the period ending 18/01/2020 |
| A123943 | 2020 | YANREY NORTH | Annual Technical Report for Yanrey North Tenement - E08/2385 for the period ending 18/1/2020 |
| A123358 | 2020 | Yanrey | Yanrey C77/2007 Combined Annual Technical Report for the period ending 31/12/2019 |
| A119979 | 2019 | Yanrey North | Annual Technical Report for Yanrey North E08/2386 from 19 January 2018 to 18 January 2019 |
| A119978 | 2019 | Yanrey North | Annual Technical Report for Yanrey North E08/2387 from 19 January 2018 to 18 January 2019 |
| A119977 | 2019 | Yanrey North | Annual Technical Report for Yanrey North E08/2385 from 19 January 2018 to 18 January 2019 |
| A119787 | 2019 | Yanrey 1 | C26/2013 Yanrey 1 Project Annual Report for the period 1 January 2018 to 31 December 2018, E08/02478, E08/0247 |
| A119729 | 2019 | Yanrey | C77/2007 Yanrey Project Combined Annual Technical report for the period 1 January 2018 to 31 December 2018, E0 |
| A116063 | 2018 | Yarney | C77/2007 “YANREY” Combined Reporting Group Annual Technical Report for the period 01/01/2017 - 31/12/2017, E08 |
| A116017 | 2018 | Yarney 1 | C26/2013 “YANREY 1” COMBINED REPORTING GROUP ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/01/2017 TO 31/12/2017, |
| A114785 | 2017 | Boolaloo | Boolaloo E08/2496 Final Surrender Report For the Period 16 July 2014 to 17 August 2017 |
| A114784 | 2017 | Boolaloo | Boolaloo E08/2638 Final Surrender Report for the period 27 July 2015 to 17 August 2017 |
| A114763 | 2017 | Yanrey | Core Library Drillcore Donation |
| A114724 | 2017 | Boolaloo | C117/2015 “Boolaloo” Combined Reporting Group Annual Technical Report for the period For the Period 1 August 2 |
Report numbers filed by Cauldron Energy Ltd
Named projects
Project names Cauldron Energy Ltd used in their reports, with the shire each sits in.
Watching what Cauldron Energy Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.