Cygnus Metals Limited
Cygnus Metals Limited holds 10 Western Australian tenements covering 83,692 ha through 3 registered companies. It has lodged 25 open-file WAMEX reports between 2023 and 2025, mostly for gold, platinum group elements and base metals.
Companies Cygnus Metals holds ground through
Cygnus Metals (ASX:CY5) holds Western Australian ground through 3 registered companies, with the live tenements each is named on:
From Cygnus Metals' consolidated entity disclosure statement, as at 2025-12-31.
Who Cygnus Metals holds ground with
It holds 3 live titles together with another holder.
Holds ground with
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Cygnus Metals holds today
Cygnus Metals holds 10 tenements across 83,692 ha through its companies. The register records 8 titles transferred in and 4 transferred out, the latest in February 2026.
- Which tenements its companies hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 24 · Platinum Group Elements 22 · Base Metals 19 · Rare Earth Elements 11 · Lithium 8 · Copper 5 · Nickel 5 · Cobalt 4
- Where they worked
- Shire of Menzies 4, Shire of Kulin 4, Shire of Corrigin 3, Shire of Mukinbudin 2, Shire of Beverley 2, Shire of Merredin 2, Shire of Cunderdin 2, Shire of Trayning 2, Shire of Mount Marshall 1, Shire of Lake Grace 1
- Work on record
- Surface geochemistry 13 · Soil sampling 9 · Wamex review 9 · Land access 7 · Rock chip sampling 7 · Auger drilling 4 · Geological mapping 3 · Aircore drilling 2
- Resource declared
- Never on this record
- Downloadable data
- 15 of 25 reports include a digital package
- Reports with no exploration
- 8 of 25 record no work done
- Report types
- Partial Surrender 11 · Final Surrender 7 · Annual 6 · Co-Funded Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A148615 | 2025 | Bonnie Rock | Partial Surrender Bonnie Rock E70/5196 for the period ending 04/04/2025. |
| A146273 | 2025 | Panhandle | Final Surrender Panhandle E29/01075 for the period ending 10/02/2025 |
| A145712 | 2024 | Mackie | E70/5397 “Mackie” Annual Technical Report for the period ending 01/12/2023 |
| A144799 | 2024 | Weydenying Hills | Final Surrender Weydenying Hills E70/5098 for the period ending 23/08/2024. |
| A144473 | 2024 | Bencubbin North | Partial Surrender Bencubbin North E70/5169 for the period ending 14/06/2024. |
| A144437 | 2024 | Panhandle | Partial Surrender E29/1075 Panhandle Project for the period ending 17/06/2024 |
| A143610 | 2024 | Burracoppin | Final Surrender Burracoppin E70/05050 for the period 02/07/2018 to 14/06/2024 |
| A143574 | 2024 | Grace | Final Surrender for Grace Project E70/06563 for the period 15 December 2023 to 14 June 2024 |
| A143573 | 2024 | Culbarting | Final Surrender Culbarting E70/05492 for the period 22 January 2021 to 14 June 2024 |
| A143568 | 2024 | Little Snake | Final Surrender Little Snake E70/06385 for the period 29 March 2023 to 14 June 2024 |
| A143567 | 2024 | Big Snake | Final Surrender Big Snake E70/06386 for the period 29 March 2023 to 14 June 2024 |
| A143564 | 2024 | Snake Rock | Partial Surrender Snake Rock E70/04911 for the period 10 May 2017 to 14 June 2024 |
| A143563 | 2024 | Weydenying Hills | Partial Surrender Weydenying Hills E70/05098 for the period 20 August 2018 to 14 June 2024 |
| A143553 | 2024 | Bonnie Rock | Partial Surrender Bonnie Rock E70/05196 for the period 8 March 2019 to 14 June 2024 |
| A143552 | 2024 | Bencubbin South | Partial Surrender Bencubbin South E70/05168 for the period 20 December 2018 to 14 June 2024 |
| A143551 | 2024 | Bencubbin Central | Partial Surrender Bencubbin Central E70/04988 for the period 18 January 2022 to 14 June 2024 |
| A139292 | 2024 | Panhandle | Annual Report E29/1075 - Panhandle Project for the period ending 10/02/2024 |
| A138996 | 2024 | Bencubbin Central | Partial Surrender Bencubbin Central E70/4988 for the period ending 21/01/2024. |
| A138967 | 2024 | Culbarting | E70/5492 “Culbarting” Annual Technical Report for the period ending 21/01/2024 |
| A138179 | 2024 | Mackie | E70/5397 “Mackie” Annual Technical Report for the period ending 01/12/2023 |
Report numbers filed by Cygnus Metals Limited
Named projects
Project names Cygnus Metals Limited used in their reports, with the shire each sits in.
Watching what Cygnus Metals Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.