Deneb Resources Pty Ltd
Deneb Resources Pty Ltd holds 6 Western Australian tenements covering 51,940 ha. It is a subsidiary of Cygnus Metals (ASX:CY5). It has lodged 21 open-file WAMEX reports between 2022 and 2025, mostly for gold, platinum group elements and base metals.
Who owns Deneb Resources?
Deneb Resources is a subsidiary of Cygnus Metals (ASX:CY5). The group is named as a holder on 9 live Western Australian tenements.
The other companies Cygnus Metals holds ground through, with the live tenements each is named on:
From Cygnus Metals' consolidated entity disclosure statement, as at 2025-12-31.
Who Cygnus Metals holds ground with
Deneb Resources is part of the Cygnus Metals group, so these are the group's connections.
It holds 3 live titles together with another holder.
Holds ground with
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Deneb Resources holds today
Deneb Resources holds 6 tenements across 51,940 ha. The register records 4 titles transferred in, the latest in August 2020.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 21 · Platinum Group Elements 19 · Base Metals 12 · Cobalt 9 · Copper 9 · Nickel 9 · Lithium 8 · Rare Earth Elements 7
- Where they worked
- Shire of Menzies 5, Shire of Cunderdin 5, Shire of Beverley 4, Shire of Mukinbudin 2, Shire of Trayning 2, Shire of Mount Marshall 1, Shire of Nungarin 1, Shire of Merredin 1
- Work on record
- Surface geochemistry 15 · Soil sampling 10 · Rock chip sampling 7 · Auger drilling 5 · Geological mapping 3 · Land access 3 · Wamex review 3 · Geophysical interpretation 2
- Resource declared
- Never on this record
- Downloadable data
- 16 of 21 reports include a digital package
- Reports with no exploration
- 4 of 21 record no work done
- Report types
- Annual 11 · Partial Surrender 8 · Final Surrender 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A148615 | 2025 | Bonnie Rock | Partial Surrender Bonnie Rock E70/5196 for the period ending 04/04/2025. |
| A146273 | 2025 | Panhandle | Final Surrender Panhandle E29/01075 for the period ending 10/02/2025 |
| A145712 | 2024 | Mackie | E70/5397 “Mackie” Annual Technical Report for the period ending 01/12/2023 |
| A144473 | 2024 | Bencubbin North | Partial Surrender Bencubbin North E70/5169 for the period ending 14/06/2024. |
| A144437 | 2024 | Panhandle | Partial Surrender E29/1075 Panhandle Project for the period ending 17/06/2024 |
| A143573 | 2024 | Culbarting | Final Surrender Culbarting E70/05492 for the period 22 January 2021 to 14 June 2024 |
| A143553 | 2024 | Bonnie Rock | Partial Surrender Bonnie Rock E70/05196 for the period 8 March 2019 to 14 June 2024 |
| A143552 | 2024 | Bencubbin South | Partial Surrender Bencubbin South E70/05168 for the period 20 December 2018 to 14 June 2024 |
| A143551 | 2024 | Bencubbin Central | Partial Surrender Bencubbin Central E70/04988 for the period 18 January 2022 to 14 June 2024 |
| A139292 | 2024 | Panhandle | Annual Report E29/1075 - Panhandle Project for the period ending 10/02/2024 |
| A138996 | 2024 | Bencubbin Central | Partial Surrender Bencubbin Central E70/4988 for the period ending 21/01/2024. |
| A138967 | 2024 | Culbarting | E70/5492 “Culbarting” Annual Technical Report for the period ending 21/01/2024 |
| A138179 | 2024 | Mackie | E70/5397 “Mackie” Annual Technical Report for the period ending 01/12/2023 |
| A136445 | 2023 | Burracoppin | Annual Report Burracoppin E70/5050 for the period ending 30/06/2023. |
| A134645 | 2023 | Panhandle | Annual Report E29/1075 - Panhandle for the period ending 10/02/2023. |
| A134328 | 2023 | Culbarting | E70/5492 “Culbarting” Annual Technical Report for the period ending 21/01/2023 |
| A133661 | 2023 | Mackie | E70/5397 “Mackie” Annual Technical Report for the period ending 01/12/2022 |
| A130862 | 2022 | Panhandle | Annual Report E29/1075 - Panhandle for the period ending 10/02/2022. |
| A129992 | 2022 | Culbarting | EL70/5492 “Culbarting” Annual Technical Report for the period ending 21/01/2022 |
| A129887 | 2022 | Culbarting | E70/5492 Partial Surrender Report Culbarting Project for the period ending 18/01/2022. |
Report numbers filed by Deneb Resources Pty Ltd
Named projects
Project names Deneb Resources Pty Ltd used in their reports, with the shire each sits in.
Watching what Deneb Resources Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.