Hawthorn Resources Limited
Hawthorn Resources Limited holds 13 Western Australian tenements covering 4,127 ha. It has lodged 353 open-file WAMEX reports between 2008 and 2024, mostly for gold, copper and base metals.
Who Hawthorn Resources holds ground with
It holds 10 live titles together with another holder.
Holds ground with
See Hawthorn Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Hawthorn Resources holds today
Hawthorn Resources holds 13 tenements across 4,127 ha. The register records 8 titles transferred in, the latest in April 2008.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 353 · Copper 9 · Base Metals 9 · Nickel 8 · Zinc 6 · Lead 2 · Iron 2 · Arsenic 2
- Where they worked
- Shire of Menzies 205, Shire of Leonora 118, City of Kalgoorlie-Boulder 28, Shire of Laverton 2
- Also filed as
- Hawthorn Resources Limited · Hawthorn Resources Ltd
- Work on record
- Soil sampling 181 · Geological reconnaissance 69 · RAB drilling 45 · Aeromagnetic interpretation 43 · BLEG analysis 41 · Auger drilling 36 · RC drilling 36 · Surface geochemistry 27
- Resource declared
- Yes, in 10 reports: A124630 (2020), A123421 (2020), A122001 (2019), A115738 (2018), A115640 (2018), A114511 (2017) and 4 more
- Downloadable data
- 339 of 353 reports include a digital package
- Reports with no exploration
- 16 of 353 record no work done
- Report types
- Annual 264 · Partial Surrender 47 · Final Surrender 42
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A145840 | 2024 | Pinjin East E31/782 | Partial Surrender Report for Pinjin East E31/782 for the period ending 6/9/2024 |
| A143220 | 2024 | Pinjin East | Final Surrender Report E31/781 Pinjin East for the period ending 06/02/2024. |
| A143202 | 2024 | Pinjin | Final Surrender Report for Pinjin E31/783 for the period 9 September 2008 to 6 February 2024 |
| A143201 | 2024 | Pinjin West | Final Surrender Report for E31/1176 Pinjin West Project for the period 11 February 2019 to 6 February 2024 |
| A133289 | 2022 | A Tank | E31/789 Final Surrender Report for the period 13 March 2010 to 16 September 2022 |
| A127776 | 2021 | Pinjin South | Annual Technical Report for E31/789 Pinjin South project for the period 13 March 2020 to 12 March 2021 |
| A125725 | 2020 | Trouser Legs South | Trouser Legs South E31/1094 Annual Report for the period ending 16/11/2020 |
| A125415 | 2020 | Yundamindera | Exploration Licence 39/1294 Final Surrender Report for the Period 22 August 2015 to 21 August 2020 |
| A124758 | 2020 | Pinjin South | Annual Technical Report for Pinjin South E31/789 for the period ending 12 March 2020 |
| A124630 | 2020 | Pinjin | Combined Annual Technical Report for Pinjin C10/2000 for the period 12 June 2019 to 11 June 2020. G 31/00004,M |
| A124160 | 2020 | Pinjin East | Combined Annual Technical Report for Pinjin East C122/2013 for the period ending 05/04/2020 |
| A123527 | 2020 | Pinjin | Surrender Report for Pinjin tenements E31/760, E31/882 & E31/1049 (C122/2013) 19 September 2008 to 27 March 20 |
| A123421 | 2020 | Edjudina | Annual Technical Report M31/481 Edjudina Project for the period ending 24/02/2020 |
| A122287 | 2020 | Pinjin | Annual Technical Report for Pinjin E31/1094, 17 November 2018 to 16 November 2019 |
| A122001 | 2019 | Pinjin | Combined Annual Technical Report for Pinjin C10/2000 For the Period 12 June 2018 to 11 June 2019 |
| A122000 | 2019 | Pinjin East | Combined Annual Technical Report for Pinjin East C122/2013 for the period 6 April 2018 to 5 April 2019 |
| A120404 | 2019 | Edjudina - Paget | Edjudina - Paget M31/00481 Annual Report for the period 25 February 2018 to 24 February 2019 |
| A119351 | 2019 | Trouser Legs South | Trouser Legs South E31/1094 Annual Report For the Period 17 November 2017 to 16 November 2018 |
| A119283 | 2019 | Deep South - Belize | Deep South (Belize) C122/2010 Annual Report for the period 24 October 2017 to 23 October 2018, M39/01109, M39/ |
| A119280 | 2019 | Yundamindera | C96/2016 Yundamondera Project Annual Report for the period 1 November 2017 to 31 October 2018 |
Report numbers filed by Hawthorn Resources Limited
Named projects
Project names Hawthorn Resources Limited used in their reports, with the shire each sits in.
Watching what Hawthorn Resources Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.