Lithium Power International Limited
Lithium Power International Limited holds no tenure on the current Western Australian register. It has lodged 14 open-file WAMEX reports between 2017 and 2020, mostly for lithium.
Exploration record
- Commodities targeted
- Lithium 14
- Where they worked
- Shire of East Pilbara 6, Shire of Bridgetown-Greenbushes 4, Town of Port Hedland 2, Shire of Donnybrook-Balingup 2
- Work on record
- Rock chip sampling 8 · Geological reconnaissance 5 · Surface geochemistry 5 · Geological interpretation 3 · Soil sampling 3 · Geophysical interpretation 2 · Laterite sampling 2 · Aerial geophysical surveys 1
- Resource declared
- Never on this record
- Downloadable data
- 11 of 14 reports include a digital package
- Reports with no exploration
- 4 of 14 record no work done
- Report types
- Annual 14
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A125393 | 2020 | Pilgangoora | Pilgangoora Lithium Project E45/04610 Annual Report for the period ending 17/10/2020 |
| A123585 | 2020 | Greenbushes | Second Combined Annual Report Greenbushes Project E70/4763 & E70/4774 (C100/2017) for the period ending 21/3/2 |
| A122058 | 2019 | Pilgangoora | Pilgangoora Lithium Project E45/04610 Annual Report for the period 18 October 2018 to 17 October 2019 |
| A120575 | 2019 | Strelley | Annual Report Strelley Lithium Project Tenement E45/4638 for the period 12th May 2018 to 11th May 2019 |
| A120546 | 2019 | Tabba Tabba | Annual Report Tabba Tabba Lithium Project Tenement E45/4637 for the period 12th May 2018 to 11th May 2019 |
| A120284 | 2019 | Greenbushes | First Combined Annual Report Greenbushes Project E70/4763 & E70/4774 |
| A118186 | 2018 | Pilgangoora | Pilgangoora Lithium Project E45/04610 Annual Report for the period 18/10/2017 - 17/10/2018 |
| A117185 | 2018 | Strelley | Annual Report Strelley Lithium Project Tenement E45/4638 For the Period 12 May 2017 to 11 May 2018 |
| A117184 | 2018 | Tabba Tabba | Annual Report Tabba Tabba Lithium Project Tenement E45/4637 For the Period 12 May 2017 to 11 May 2018 |
| A116208 | 2018 | Greenbushes | Greenbushes Lithium Project Annual Report E70/4763 for the period 22/03/2017 - 21/03/2018 |
| A116205 | 2018 | Greenbushes | Greenbushes Lithium Project E70/04774 [C100/2017] Annual Report for the period 18 March 2017 to 17 March 2018 |
| A115150 | 2017 | Pilgangoora | Pilgangoora Lithium Project Annual Report Tenement E45/4610 For the Period 18 October 2016 to 17 October 2017 |
| A114068 | 2017 | Greenbushes | Annual Report Greenbushes Project E70/4774 for the period 18th March 2016 to 17th March 2017 |
| A114064 | 2017 | Greenbushes | Annual Report Greenbushes Project E70/4763 for the period 22th March 2016 to 21th March 2017 |
Named projects
Project names Lithium Power International Limited used in their reports, with the shire each sits in.
Watching what Lithium Power International Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.