Wodgina Lithium Pty Ltd
Wodgina Lithium Pty Ltd holds 58 Western Australian tenements covering 48,032 ha. It is a subsidiary of Mineral Resources (ASX:MIN). It has lodged 39 open-file WAMEX reports between 2017 and 2023, mostly for lithium, iron ore and gold.
Who owns Wodgina Lithium?
Wodgina Lithium is a subsidiary of Mineral Resources (ASX:MIN). The group is named as a holder on 221 live Western Australian tenements.
The other companies Mineral Resources holds ground through, with the live tenements each is named on:
From Mineral Resources' consolidated entity disclosure statement, as at 2026-06-30.
Who holds paper over Mineral Resources' ground?
Wodgina Lithium is part of the Mineral Resources group, so these are the group's connections.
68 of Mineral Resources' live titles carry a caveat or mortgage held by another party. Mineral Resources holds caveats or mortgages over 106 live titles of other companies. It holds 50 live titles together with another holder.
Caveats and mortgages over its ground
and 7 more
It holds caveats and mortgages over
and 4 more
Holds ground with
See Mineral Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Wodgina Lithium holds today
Wodgina Lithium holds 58 tenements across 48,032 ha. The register records at least 26 titles transferred in and 34 transferred out, the latest in September 2020.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Lithium 39 · Iron 18 · Gold 6 · Tin 1 · Titanium 1
- Where they worked
- Town of Port Hedland 14, Shire of Dundas 8, Shire of Upper Gascoyne 6, Shire of Yilgarn 4, Shire of Derby-West Kimberley 3, Shire of East Pilbara 2, Shire of Kulin 1, Shire of Kondinin 1
- Work on record
- Rock chip sampling 11 · Surface geochemistry 10 · Geological reconnaissance 8 · Geological mapping 7 · RC drilling 6 · Mineral resource estimate 5 · Mining 3 · Aerial lidar surveys 2
- Resource declared
- Yes, in 5 reports: A120350 (2019), A119627 (2019), A117929 (2018), A117924 (2018), A116593 (2018)
- Downloadable data
- 37 of 39 reports include a digital package
- Reports with no exploration
- 15 of 39 record no work done
- Report types
- Annual 24 · Final Surrender 15
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A134110 | 2023 | Lake Johnston - Lake Hope | Final Surrender Report E63/1880 Lake Johnston - Lake Hope Project for the period ending 10/02/2023 |
| A131545 | 2022 | Lake Johnston (Lake Hope) | Final Surrender Report E63/1878, Lake Johnston for the period ending 09/06/2022. |
| A131227 | 2022 | Lake Johnston - Lake Hope | Combined Annual Report C27/2020 - Lake Johnston, for the period 1/06/2021 to 31/05/2022 |
| A127913 | 2021 | Lake Johnston | Combined Annual Report C27/2020 Lake Johnston for the period 1/6/2020 to 31/5/2021 |
| A124415 | 2020 | Lake Johnston | Combined Annual Report C27/2020 Lake Johnston for the period 1/6/2019 to 31/5/2020 |
| A123193 | 2020 | Wodgina | Combined Annual Report C54/2017 - Wodgina - Annual for the period 1/1/2019 to 31/12/2019 |
| A122503 | 2020 | Yinnetharra | Final Surrender E09/2187 Yinnetharra Project for the period 15 December 2016 to 10 December 2019 |
| A121002 | 2019 | Strelley | Strelley C65/2017 Annual Report for the period 1/7/2018 to 30/6/2019 |
| A120962 | 2019 | Shaw River | Final Surrender Report Shaw River E45/4763 for the period 13/7/2018 to 20/5/2019 |
| A120960 | 2019 | Shaw River | Final Surrender Report Shaw River E45/4762 for the period 13/7/2018 to 20/5/2019 |
| A120383 | 2019 | Lake Johnston | E63/1880 Lake Johnston Annual Report for the period 1/6/2018 to 31/5/2019 |
| A120382 | 2019 | Lake Johnston | E63/1878 Lake Johnston Annual for the period 1/6/2018 to 31/5/2019 |
| A120350 | 2019 | Wodgina | E45/2175 "Wodgina" Final Surrender Report for the period 14/02/2003 to 13/02/2018 |
| A120348 | 2019 | Wodgina | Wodgina Annual report R45/4 for the period 21/7/2017 to 20/7/2018 |
| A120235 | 2019 | Lake Johnston | Final Surrender E63/1879 Lake Johnston Project for the period 1 June 2018 to 22 May 2019 |
| A119960 | 2019 | South Star | Combined Annual Report C12/2016 South Star for the Period 13/3/2018 to 12/3/2019, E45/04024, E45/04025, E45/04 |
| A119627 | 2019 | Wodgina | Combined Annual Report Wodgina C54/2017 for the period 1/1/2018 to 31/12/2018 |
| A118957 | 2019 | Yinnetharra | Final Surrender E09/2190 Yinnetharra Project for the period 15 December 2016 to 8 February 2019 |
| A118949 | 2019 | Mount Marion | P77/4367 Mt Marion Final Surrender Report for the period 1 December 2016 to 17 December 2018 |
| A118916 | 2019 | Yinnetharra | E09/2190 Yinnetharra Project Annual Report For the Period 15 December 2017 to 14 December 2018 |
Report numbers filed by Wodgina Lithium Pty Ltd
Named projects
Project names Wodgina Lithium Pty Ltd used in their reports, with the shire each sits in.
Watching what Wodgina Lithium Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.