E 08/3301
Register summary
- Holder
- Marquee Resources Limited
- Local government
- Shire of Ashburton
- Application received
- 16 Nov 2020
- Commenced
- 22 Feb 2022
- Expiry
- 21 Feb 2027
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149688 | 2025 | Nanjilgardy Resources Pty Ltd | Wyloo | <1% | Partial Surrender Report for E08/3065 Wyloo Project for the period ending 8/7/2025 |
| A152987 | 2025 | Nanjilgardy Resources Pty Ltd | Wyloo E08/3065 | <1% | Partial Surrender Report for E08/3065 Wyloo for the period ending 22/09/2025. |
| A119146 | 2019 | Rio Tinto Exploration Pty Limited | Mt Edith | <1% | Mt Edith Surrender Report Exploration Licence 08/02861 (GDSR 6914) For the Period 27 February 2017 to 29 Janua |
| A115900 | 2018 | Glenn Archer | Wyloo | <1% | Wyloo Agate Project E08/02801 Partial Surrender Report for the period 8 July 2016 to 3 November 2017 |
| A118323 | 2018 | Corona Mining Pty Ltd | Nanjilgardy | 4.3% | Annual Report for E08/2865 Nanjilgardy Project for the period 04/10/2017 to 03/10/2018 |
122 more reports
| A116316 | 2018 | Rio Tinto Exploration Pty Limited | Mount Edith | <1% | Mt Edith Annual Report Exploration Licence 08/02861 (GDSR 6739/RTX Report 30898) For the Period 27 February 20 |
| A118292 | 2018 | Corona Mining Pty Ltd | Nanjilgardy | 4.3% | Partial Surrender Report for E08/2865 Nanjilgardy Project for the period 4 October 2017 to 28 September 2018 |
| A113861 | 2017 | Fortescue Metals Group Ltd | Boolaloo | 21% | E08/2490 (Boolaloo) Final Surrender Report for the period 26/09/2014 to 24/03/2017 |
| A108188 | 2016 | Artemis Resources Limited | Mount Clement | <1% | Combined Annual Report, Mt Clement Project C363/1993, M 08/00191, E 08/01841, M 08/00192, M 08/00193 for the p |
| A108873 | 2016 | Fortescue Metals Group Ltd | Mount Clement | 12% | C159/2014 Mount Clement Annual Report for the period 01/04/2015 to 31/03/2016, E 08/02490, E 08/02498, E 08/02 |
| A104523 | 2015 | Northern Star Resources Ltd | Paulsens | <1% | Paulsens Project C211/1997 Annual Report for the period 14/11/13 to 13/11/14, E08/1166......P47/1637 |
| A104615 | 2015 | Artemis Resources Ltd | Mount Clement | <1% | Final Report, Exploration Incentive Scheme Co-Funded Drilling, Eastern Hills Antimony-Lead Project, January 20 |
| A105545 | 2015 | Fortescue Metals Group Ltd | Mount Clement | 12% | Combined Annual Mineral Exploration Report: C159/2014 Mount Clement for the period 1 April 2014 to 31 March 20 |
| A106278 | 2015 | Artemis Resources Ltd | Mount Clement | <1% | Partial Surrender Report for the Period 8th January 2009 to 15th December 2014, Mt Clement Project, E08/1841 |
| A106639 | 2015 | Northern Star Resources Ltd | Paulsens | <1% | Annual Mineral Exploration Report for the Paulsens Group C08/2015 for the period 1 June 2014 to 31 May 2015 |
| A104577 | 2015 | Artemis Resources Ltd | Mount Clement | <1% | Combined Annual Report, Combined Reporting Group C363/1993 For The Period 1st January 2014 to the 31st Decembe |
| A105596 | 2015 | Regional Resources Nw Pty Ltd | Onslow Group 3 | 98% | Annual Report (16.03.2014 15.03.2015) Onslow Group 3 (C47/2014) Combined Reporting Mt Edith Dolomite E08/205 |
| A100734 | 2014 | Artemis Resources Ltd | Mount Clement - Eastern Hills | <1% | Final Report Exploration Incentive Scheme Co-Funded Drilling, Eastern Hills Antimony-Lead Project, for the per |
| A102587 | 2014 | Regional Resources Nw Pty Ltd | Onslow Group 3 - Mount Edith | 98% | Annual Report (16.03.2013 - 15.03.2014) Onslow Group 3 (C47/2014) Combined Reporting Mt Edith Dolomite E08/205 |
| A100751 | 2014 | Northern Star Resources Ltd | Paulsens | <1% | Paulsens Project C211/1997 Annual Report to the Department of Mines and Petroleum for the period 14/11/12 to 1 |
| A101179 | 2014 | Artemis Resources Ltd | Mount Clement | <1% | Combined Annual Report, Combined Reporting Group C363/1993 For The Period 1st January 2013 to the 31st Decembe |
| A101224 | 2014 | Regional Resources Nw Pty Ltd | Mount Edith | 100% | Mt Edith Dolomite Project E08/2055 Annual Report for the Period 07/01/2013 to 06/01/2014 |
| A102779 | 2014 | Artemis Resources Ltd | Mount Clement | <1% | Mount Clement Project, Final Surrender Report for the period 17th May 2007 to the 16th May 2014, E08/1606. |
| A97364 | 2013 | Regional Resources Nw Pty Ltd | Mount Edith | 12% | Annual Report (23.01.2012 22.01.2013) Mt Edith Dolomite Resources Exploration Licence E08/1279 EXPLORATION R |
| A97429 | 2013 | Artemis Resources Ltd | Mount Clement | <1% | Mount Clement Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1606 & 1841; M |
| A99591 | 2013 | Northern Star Resources Ltd | Hardy Junction | 1.9% | Hardy Junction C130/2005 Annual Report to the Department of Mines and Petroleum for the period 08/08/12 to 07/ |
| A99934 | 2013 | Regional Resources Nw Pty Ltd | Mount Edith | 12% | Final Surrender Report Mt Edith Dolomite Resources E08/1279 for the period ended 3 August 2013 |
| A97229 | 2013 | Regional Resources Nw Pty Ltd | Mount Edith | 100% | Mt.Edith Dolomite E08/2055 Annual Report for the Period 07/01/2011 to 06/01/2013 |
| A92995 | 2012 | Artemis Resources Ltd | Mount Clement | <1% | Annual Report, Mt Clement Project, C363/1993, E08/1606, E08/1841, M08/191, M08/192, M08/193 |
| A93288 | 2012 | Jemda Pty Ltd | Mount Edith | 100% | Annual Report E08/2055, Period ending 6th January 2012. |
| A94208 | 2012 | Magnesium Resources Pty Ltd | Mount Edith | 12% | Annual Report Mt Edith Dolomite Resources Exploration Licence E08/1279 Exploration Report. Period 23/1/2011 t |
| A95115 | 2012 | Northern Star Resources Ltd | Hardey Junction | 1.9% | HARDEY JUNCTION PROJECT Combined Reporting Group 130/2005 E08/1166, E08/1189-I, E08/1763-I, E08/1843-I and P08 |
| A89610 | 2011 | Artemis Resources Ltd | MOUNT CLEMENT | <1% | Combined Annual Report, C363_1993_2010A, 1st January 2010 to 31st December 2010, Mount Clement Project, E08/ |
| A90661 | 2011 | Newcrest Mining Ltd | Ashburton | <1% | Data on Core from the Ashburton region donated by Sipa / Newcrest. |
| A91505 | 2011 | Northern Star Resources Ltd | Hardy Junction | 1.9% | Annual Technical Report 8 August 2010 - 07 August 2011 Hardy Junction Project C130/2005, E08/1166, 1189, 1763, |
| A92005 | 2011 | Cauldron Energy Ltd | Boolaloo | 9.8% | Boolaloo Project E08/1615, E08/1702, and E08/1703 Group Surrender Report |
| A88218 | 2010 | Cauldron Energy Ltd | Boolaloo | 8.3% | Boolaloo Project E08/160, E08/1615, E08/1702, E08/1703 and E08/1756 Group Report C59/2009 Annual Report For th |
| A86181 | 2010 | Intrepid Mines Ltd | Metawandy Creek | <1% | METAWANDY CREEK PROJECT ANNUAL REPORT - For the Period 1st January 2009 to 31st December 2009, Combined Report |
| A86782 | 2010 | Intrepid Mines Ltd | Metawandy | 1.2% | Metawandy Creek Project Final Surrender Report for E08/853, May 2010 |
| A87008 | 2010 | Magnesium Resources; Onslow Resources | Mount Edith | 5.3% | Mt Edith Project Annual Report 2010 Tenements – E08/1616, 1617, 1279 Period 24/01/09-23/01/10 |
| A87621 | 2010 | Artemis Resources Ltd | Mount Clement | <1% | Partial Relinquishment Report, E08/1606, block 2402P, Mt Clement, 17th May 2007 to 16th May 2010 |
| A88087 | 2010 | Magnesium Resources Pty Ltd | Duck Creek Proposed Quarry | 12% | Two Year Annual Report for the Period 05 August 2008 to 04 August 2010, Proposed Duck Creek Quarry,Tenement Nu |
| A81109 | 2009 | Intrepid Mines Ltd | METAWANDY CREEK | <1% | METAWANDY CREEK PROJECT, Combined Reporting Group C92/2001 E08/853, E08/854, E08/1187, E08/1191, E08/1842, E08 |
| A84876 | 2009 | Intrepid Mines Ltd | HARDY JUNCTION | 1.8% | ANNUAL TECHNICAL REPORT 08 August 2008 - 07 August 2009 HARDY JUNCTION PROJECT Wyloo (SH50-10) Combined Report |
| A81132 | 2009 | Artemis Resources Ltd | Mt Clements | <1% | Annual Report, Mt Clements Project, C363_1993_2008A, 1st January 2008 to 31st December 2008 |
| A85124 | 2009 | Jackson Minerals Ltd | Boolaloo | 8.3% | C59/2009 2009 Partial Surrender Report 1 July 2008 - 30 June 2009 |
| A85184 | 2009 | Jackson Minerals Ltd | Boolaloo | 8.3% | 2009 Combined Annual Report for C59/2009 – Boolaloo Project, Period 1 july 2008 – 30th june 2009, tenements: E |
| A86661 | 2009 | Artemis Resources Ltd | Mount Clement | <1% | Annual Report, Mt Clement Project, C363/1993, E08/1606, E08/1841, M08/191, M08/192, M08/193, 1st January 2009 |
| A88018 | 2009 | Northern Star Resources Ltd | Hardy Junction | 1.9% | Hardy Junction Project Annual Technical Report 08 August 2009 - 07 August 2010, C130/2005, E08/1166, E08/1189, |
| A77621 | 2008 | Intrepid Mines Ltd | Hardy Junction (Wyloo) | 1.8% | ANNUAL TECHNICAL REPORT 08 August 2006 - 07 August 2007 HARDY JUNCTION PROJECT Combined Reporting Group C130/2 |
| A80342 | 2008 | Magnesium Resources Pty Ltd | Dolomite Quarry | 12% | TECHNICAL REPORT ON THE PROPOSED DOLOMITE QUARRY, EXPLORATION LICENSE 08/1279, Mt Edith district (Wyloo) |
| A77817 | 2008 | Vgs Pty Ltd | Mount Clement | <1% | Annual Report for the period January 1st 2007 to 31st December 2007 Mount Clement Gold Project E08/1606,M08/19 |
| A78148 | 2008 | Intrepid Mines Ltd | Metawandy Creek | <1% | ANNUAL REPORT 1 January 2007 to 31 December 2007 Metawandy Creek Project E08/853, E08/854, E08/1187, E08/1190 |
| A79573 | 2008 | Jackson Minerals Ltd | Boolaloo | 23% | Boolaloo Project E08/1703 2008 Annual Report, Report Period: 2 July 2007 – 1 July 2008 |
| A79960 | 2008 | Intrepid Mines Ltd | HARDY JUNCTION | 1.8% | ANNUAL TECHNICAL REPORT 08 August 2007 - 07 August 2008 HARDY JUNCTION PROJECT Combined Reporting Group C130/2 |
| A74366 | 2007 | Nustar Mining Corporation Ltd | Metawandy Creek | <1% | Metawandy Project C92/2001 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006. (Wyloo) |
| A76514 | 2007 | Magnesium Resources Pty Ltd | Mount Edith | 12% | Annual Report E08/1279 Period 04/08/06-03/08/07 Mount Edith Project |
| A73458 | 2006 | Intrepid Resources Nl | Hardy Junction | 1.8% | Annual Technical Report, 8 August 2005 to 7 August 2006, Hardy Junction Project E08/1145,1166,1189, Combined R |
| A74256 | 2006 | Newcrest Mining Ltd | Merlin- Ashburton | 2.6% | Ashburton Regional Project Northwestern Exploration Area, E08/831, E08/1204 and E08/1205, Merlin, Annual Te |
| A71908 | 2006 | Nustar Mining Corporation Ltd | Metawandy Creek | <1% | Annual Report, 1 January 2005 to 31 December 2005, Metawandy Creek Project, 08/853-854, 073, 1096, 1127, 191, |
| A70041 | 2005 | Newcrest Mining Ltd | Ashburton Northwest | 2.6% | Annual report for the period 01/01/04 - 31/12/04 Ashburton Northwest Project, Merlin Prospect, C207/1997, E08/ |
| A70170 | 2005 | Nustar Mining Corporation Ltd | Metawandy Creek | <1% | Annual report for the period 01/01/04 - 31/12/04 Metawandy Creek Project, C92/2001, E08/853, E08/854, E08/1073 |
| A71108 | 2005 | Nustar Mining Corporation Ltd | Hardy Junction | 1.8% | Annual technical report, 08 August 2004 - 07 August 2005, Hardy Junction Project (Wyloo, C130/2005, E08/1166, |
| A71641 | 2005 | Newcrest Mining Ltd | Kooline | 2.6% | Ashburton Regional Project Northwestern Exploration Area, Exploration Licences E08/831,E08/1204 and E08/1205 M |
| A68609 | 2004 | Nustar Mining Corporation Ltd | Metawandy Creek | <1% | Annual report for the period 01/01/2002-31/12/2003 Metawandy Creek Project E08/1073, E08/1096, E08/1127, E08/ |
| A68118 | 2004 | Newcrest Mining Ltd | Ashburton | 2.6% | Annual Report for the period ending 31/12/2003 Ashburton Regional Project (C207/1997), E08/831 |
| A69378 | 2004 | Cullen Exploration Pty Ltd | Wyloo | <1% | Annual report for the period 08/08/03-07/08/04 Wyloo project, E08/1166, E08/1189, E08/1292, E08/1327, E08/1330 |
| A67690 | 2003 | Giralia Resources Nl | Hardey Junction | 51% | Annual Report for the period 26 May 2002-25 May 2003 Hardey Junction Project E08/1121 |
| A65628 | 2002 | Newcrest Mining Ltd | Ashburton | 2.6% | Ashburton Regional Project Exploration Licence E08/831 Annual Technical Reprot For Period Ending December 31,2 |
| A64693 | 2002 | Nugold Hill Mines Ltd | Wyloo | 1.2% | Wyloo E08/853 Annual Report for tenement E08/853 Period 7/05/2001 to 6/05/2002 Dome Reference Number : M8373/2 |
| A62377 | 2001 | Nugold Hill Mines Ltd | Wyloo | 1.2% | Annual Report Wyloo E08/853 Annual Report for tenement E08/853 Period 7/05/2000 to 6/05/2001. Dome Reference N |
| A64316 | 2001 | Newcrest Mining Ltd | Ashburton | 1.3% | Annual Technical Report to the Department of Minerals & Petroleum Resources for period ending December 31, 200 |
| A63471 | 2001 | Adelaide Prospecting Pty Ltd | Hardey Junction | 51% | Hardey Junction Project E08/1121 Annual Report for the period 26/5/00 - 25/5/01 GSWA Ref No: M11567. |
| A59710 | 2000 | Newcrest Mining Ltd | Ashburton | <1% | Ashburton Regional Project, Northwestern Exploration Area, Exploration Licences E08/831,949,950, E47/850,851, |
| A60604 | 2000 | Goldfields Exploration Pty Ltd | Wyloo | 1.2% | Wyloo, E08/853, Annual Report for Tenement E08/853, Period 07/05/1999 to 06/05/2000. |
| A60980 | 2000 | Goldfields Exploration Pty Ltd | Wyloo | 1.2% | Partial Surrender - Wyloo E08/853 Vol. 1 of 1, 27 April 2000, Nugold Hill Mines NL. |
| A61389 | 2000 | Taipan Resources Nl | Ashburton | 20% | Ashburton Project E08/666. Final Report to the Department of Minerals and Energy Period 15 November 1993 to 20 |
| A60281 | 2000 | Newcrest Mining Ltd | Ashburton | 2.6% | Ashburton Project, Partial Surrender Report for period ending 15/02/2000, Exploration Licence E08/831. Ref:C2 |
| A61823 | 2000 | Newcrest Mining Ltd | Ashburton | 1.3% | Ashburton Project, Annual Report for the period ending December 31st 2000 , E08/831, 949 & 950.. |
| A58326 | 1999 | Taipan Resources Nl | Mount Clement | 10% | Mt Clement Project , Exploration Licences E08/637, 666, 907-910 15/11/97-14/11/98 |
| A58347 | 1999 | Nugold Hill Mines Nl | Wyloo | 1.2% | Wyloo Project Mineral Exploration Report E8/853 Ashburton Mineral Field W.A Annual Report For the Period 7/5/1 |
| A57400 | 1999 | Newcrest Mining Ltd | Ashburton | <1% | Ashburton Regional Project - Northwestern Exploration Area Exploration Licence: E08/831, 949, 950, E47/850, 85 |
| A57758 | 1999 | Newcrest Mining Ltd | Ashburton | 2.6% | Partial Surrender Report for the Period Ending February 15, 1999, Ashburton Regional Project Northwestern Expl |
| A55116 | 1998 | Nugold Hill Mines Nl | Wyloo | 1.2% | Wyloo Project, Mineral Exploration Report E08/853 Ashburton Mineral Field, W.A. Annual Report for the period 0 |
| A54411 | 1998 | Sipa Exploration Nl | Ashburton | <1% | Ashburton Regional Project, Northwestern Exploration Area 1997 Annual Report, E08/947-950, E47/850-851 01/01/9 |
| A55277 | 1998 | Geographe Resources Ltd | Hardey Junction | 51% | Annual Report, Hardey Junction Project, E08/704, for period 08/05/97-09/05/98. |
| A52293 | 1997 | Giralia Resources Nl | Hardey Junction | 51% | Hardey Junction Project, Annual Report for the period 08/05/1996 to 09/05/1997, E08/704. |
| A53863 | 1997 | Taipan Resources Nl | Mount Clement | 10% | Mt Clement Project, Annual Report 15/11/1996 - 14/11/1997, E08/637, 666, 907-910. |
| A51118 | 1997 | Sipa Exploration Nl | Ashburton | 2.6% | Ashburton Regional Project E08/831 1996 Annual report 16 February 1996 to 15 February 1997 Sipa Exploration NL |
| A51525 | 1997 | Nugold Hill Mines Nl | Wyloo | 1.2% | Exploration Licence E08/853 - Wyloo Ashburton Mineral Field Western Australia Annual report for the period 7th |
| A51553 | 1997 | Taipan Resources Nl | Mount Clement | 17% | Mt Clement Project Exploration Licences E08/637 and E08/666,Annual report for the period 15 November 1995 to 1 |
| A48844 | 1996 | Giralia Resources Nl | Hardey Junction | 51% | Hardey Junction Project , Annual Report for period 9th May 1995 to 8th May 1996, E08/704.. |
| A46222 | 1995 | Giralia Resources Nl | Hardey Junction | 51% | Hardey Junction project, Annual Report E08/704 for period ending May 1995. |
| A40444 | 1994 | Taipan Resources Nl | Mount Clement | 17% | Annual report for the period 01/01/93-31/12/93 Mt Clement Project E8/637 E8/666 |
| A41496 | 1994 | Copperfield Gold Nl | Snakewood Well | 1.5% | Snakewood Well Project, Final Surrender Report for period ending 2nd March 1994, E08/627. |
| A33228 | 1991 | Australian Ores & Minerals Ltd | Ashburton -Mount Edith | 2.6% | Ashburton - Mt Edith (JV) Project, Annual Report for the period 1st January 1990 to 31st December 1990, E08/37 |
| A34723 | 1991 | Aberfoyle Resources Ltd | Yandi Well | 69% | Yandi Well Project, Annual & Final Surrender Report for period to 8th March1991, E08/424. |
| A30015 | 1990 | Rt Mining Corp Pty Ltd | Mt Stuart | 11% | Mt Stuart Project, Final Surrender Report for the period 5th July to 26th January 1990, E08/274 |
| A31942 | 1990 | Aberfoyle Resources Ltd | Wyloo | 1.8% | Wyloo Project, Final Surrender Report, August 1990, E08/387 |
| A31964 | 1990 | Australian Ores & Minerals Ltd | Mount Clement | 43% | Mt Clement Project, Annual Report for the period October 1989 to October 1990, E08/181.(Duck Creek Joint Ventu |
| A26195 | 1989 | Resolute Resources Ltd | Midadie Well | 2.6% | Report of exploration activities, Midadie Well Prospect, exploration licence E08/154, Period 22/2/88 - 21/2/89 |
| A28448 | 1989 | Seltrust Mining Corp Pty Ltd | Mount Stuart | 11% | Exploration Licence 08/274, Mount Stuart, Annual Report, for year ending 4th July 1989. |
| A29908 | 1989 | Acm Gold Ltd | Mount Clement | 43% | Mt Clement Project, Annual Report for the period 01/01/1989 to September 1989, E08/181. |
| A29909 | 1989 | Acm Gold Ltd | Hardey Junction- Mount McGrath | 18% | Hardey Junction - Mt McGrath (JV) Project, Final Surrender Report for the period 12th July 1988 to 11th July 1 |
| A26615 | 1989 | Billiton Australia Pty Ltd | Hardey Junction | 18% | Hardey Junction, Progress Report, exploration licences 08/45, 48, 1989. |
| A26616 | 1989 | Billiton Australia Pty Ltd | Mount Clement | 43% | Mount Clement, Annual Report, exploration licence 08/181, from 13/09/87 to 12/12/88. |
| A22724 | 1988 | Billiton Australia Pty Ltd | Hardey Junction | 18% | Partial relinquishment report, E8/45 and E8/48, Hardey Junction, Ashburton Province |
| A23164 | 1988 | Resolute Resources Ltd | Midadie Well | 2.6% | Midadie Well Prospect, Annual report for period 22/2/87 to 22/2/88, E08/154 |
| A26463 | 1988 | Mr Woods Pj | Mount Clement | 10% | Mt Clement Project, Annual Report for the period 1st January 1988 to 1st January 1989, E08/206. |
| A26583 | 1988 | Resolute Resources Ltd | Mount Clement | 2.2% | Mount Clement, Progress Report, M8/57, M8/58, E8/154. |
| A26585 | 1988 | Resolute Resources Ltd | Mount Clement | 2.2% | Mount Clement, M8/57, M8/58, E8/154. |
| A21657 | 1987 | Billiton Australia Pty Ltd | Hardey Junction | 18% | Hardey Junction Project, Annual Report for the year ending 31/12/1986, E08/45 & 48. |
| A17522 | 1986 | Bp Minerals Aust Pty Ltd | Hardey Junction | 18% | Hardey Junction Project, Annual Report for the period 12th July 1985 to 11th July 1986, E08/45 & E08/48. |
| A14371 | 1984 | Austamax Resources Ltd | Hardey Junction | 29% | Hardey Junction Project, Annual Report for the period 12th July 1983 to 11th July 1984, E08/45. |
| A10750 | 1982 | Newmont Holdings Pty Ltd | Mount Clement | 27% | Mount Clement Project, Final Surrender Report for the period 23rd November 1980 to 22nd November 1981, TR70/72 |
| A10272 | 1981 | Hamersley Exp Pty Ltd | Mount Tom Price | 10% | Mt Tom Price Project, Non-statutory Report :Annual & Relinquishment Reports,[Geology of the Wyloo Anticline], |
| A9514 | 1981 | Newmont Holdings Pty Ltd | Mount Clement | 27% | Mt Clement Project, Annual Report for the period 23rd November 1979 to 22nd November 1980, TR70/7224H. |
| A9638 | 1981 | Newmont Holdings Pty Ltd | Metawandy | 14% | Metawandy Project, Annual Report, February 1981, MC08/2993 -3006, 3075 -3086. |
| A7703 | 1978 | Noranda Australia Ltd | Fairew | 12% | Fairew Project, Annual Report, March 1978, MC08/2581-2584. |
| A7796 | 1978 | Noranda Australia Ltd | Fairew | 12% | Fairew Project, Annual Report, Appendices 1-3, March 1978, MC08/2581-2584. |
| A6042 | 1975 | Dampier Mining Co Ltd | Mount Clement | 36% | Mount Clement Project, Non-statutory Report: Final Report , June 1975, TR70/5896H; MC2201-2203, 2218-2224. |
| A5420 | 1974 | Broken Hill Pty Co Ltd | Mount Clement | 36% | Mount Clement, Annual report for the 12 months ended 8th November 1974, TR70/5896, MC08/2201 - 2203, 08/2218 - |
| A4392 | 1973 | Russgar Minerals Nl | Ashburton Downs | <1% | Ashburton Downs Project, Non-statutory Report: Exploration Report for the year ending 31/12/1973,TR70/5779-578 |
| A1673 | 1968 | Kennecott Exp Aust Pty Ltd | Wyloo | 6.2% | Wyloo Project, Non-statutory Report: Final Report for the period ending 09/05/1968, TR70/4541 & 4502H. |
| A1595 | 1966 | Ashburton Exp Pty Ltd | M62/0: Ashburton-Bangemall base metal/as | <1% | TR2924H Ashburton Exploration Summary Report for 1965. Programme 1966. |
| A61287 | 1753 | Goldfields Exploration Pty Ltd | Wyloo | 1.2% | Partial Surrender - Wyloo E08/853 Vol. 1 of 1, 3 April 2000, Nugold Hill Mines NL. |
| A46444 | 1753 | Taipan Resources Nl | Mount Clement | 17% | Annual report on 1994 Exploration Activities within E08/637 and E08/666 Mt. Clement Group Report Wyloo Area - |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 6 months · 21 Feb 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 08/3301 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 08/3301? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.