E 08/3751
E 08/3751 is a pending exploration licence in the Shire of Ashburton, Western Australia, applied for by Black Cat (Paulsens) Pty Ltd (part of Black Cat Syndicate Limited). The application was received on 11 Oct 2024 and is awaiting a decision. The ground is covered by 123 historical WAMEX reports.
Register summary
- Holder
- Black Cat (Paulsens) Pty Ltd
- Part of
- Black Cat Syndicate Limited (ASX:BC8) as at 2026-06-30
- Local government
- Shire of Ashburton
- Application received
- 11 Oct 2024
The full record on E 08/3751
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143087 | 2024 | Australian Exploration, Mining & Construction Company Pty Lt | Ashburton | <1% | Ashburton Gold & Copper Project E08/3113 for the period ending 05/04/2024 |
| A144853 | 2024 | Baracus Pty Ltd | Cheela Plains | <1% | Partial Surrender Report Cheela Plains Project E08/2889 for the period ending 17/07/2024. |
| A145286 | 2024 | Cazaly Iron Pty Ltd | Ashburton | <1% | Final Surrender Report for E08/3261 (Combined Reporting Group C283/2022) The Ashburton Project for the period |
| A145292 | 2024 | Cazaly Iron Pty Ltd | Ashburton | 94% | Final Surrender Report for E08/3262 Ashburton Project for the period ending 11/10/2024 |
| A135435 | 2023 | Australian Exploration, Mining & Construction Company Pty Lt | Ashburton | <1% | Annual Report Ashburton Gold/Copper Project E08/3113 6 April 2022 to 5 April 2023 |
118 more reports
| A137053 | 2023 | Tambourah Metals Ltd | Cheela Plains | <1% | Cheela Partial Surrender for E08/2889 for the period ending 16/07/2023 |
| A137934 | 2023 | Cazaly Resources Ltd | Ashburton | 94% | Annual Report E08/03262 Ashburton Project for the period ending 06/12/2023 |
| A133665 | 2023 | Cazaly Resources Limited | Ashburton | 94% | Ashburton Project (E08/3262) Annual Report for the period ending 06/12/2022 |
| A134936 | 2023 | Castle Minerals Limited | Success Dome | <1% | Annual Technical Report Success Dome Project E08/3257 for the period ending 04/04/2023. |
| A137903 | 2023 | Cazaly Resources Limited | Ashburton | <1% | Combined Annual Report C283/2022 Ashburton Project for the period ending 12/10/2023 |
| A133119 | 2022 | Cazaly Resources Limited | Ashburton | <1% | Annual Report Ashburton Project C283/2022 for the period ending 12/10/2022 |
| A127072 | 2021 | Australian Exploration, Mining & Construction Company Pty Lt | Ashburton | <1% | Ashburton Au-Cu Project E08/03113 Annual Report for the period 6 April 2020 to 5 April 2021 |
| A124962 | 2020 | Baracus Pty Ltd | Cheela Plains | <1% | Cheela Plains E08/02889 Annual Report for the period ending 17/09/2020 |
| A122670 | 2020 | Northern Star Resources Ltd | Hardey | <1% | Hardey Project C122/2011 Combined Annual Report, Period Ending 31/12/2019, E 08/01650, E 47/02236 |
| A125214 | 2020 | Baracus Pty Ltd | Turee Creek | <1% | Turee Creek E 47/2427 Annual Report for the period ending 18/08/2020 |
| A125249 | 2020 | Baracus Pty Ltd | Cheela Plains | <1% | Cheela Plains E08/02889 Annual Report for the period ending 17/07/2020 |
| A119142 | 2019 | Northern Star Resources Ltd; Fmg Pilbara Pty Ltd | Hardey | <1% | Hardey Project C122/2011 Annual Report 2018 to the Department of Mines, Industry Regulation and Safety for the |
| A120164 | 2019 | Hylea Metals Limited | Ashburton | 14% | Ashburton Project C135/2012 Annual Report for the period 02/03/2018 to 01/03/2019, E08/02209, E08/02210, E08/0 |
| A121345 | 2019 | Baracus Pty Ltd | Cheela | <1% | Annual Report for the Cheela Project E08/02889 for the period 18 July 2018 to 17 July 2019 |
| A121391 | 2019 | Baracus Pty Ltd | Turee Creek | <1% | Annual Technical Report for Turee Creek Project E47/02427 for the period 19 August 2018 to 18 August 2019 |
| A115987 | 2018 | Northern Star Resources Ltd; Fmg Pilbara Pty Ltd | Hardey | <1% | Hardey Project C122/2011 Annual Report to the Department of Mines and Petroleum for the period 01/01/17 to 31/ |
| A117469 | 2018 | Riva Resources Limited | Ashburton | 14% | Ashburton Project C135/2012 Combined Annual Report for the period ending 1/03/2018. |
| A117948 | 2018 | State Resources Pty Ltd | Turee Creek | <1% | Annual Technical Report for the Turee Creek Project E47/02427 for the period 19/08/2017 - 18/08/2018 |
| A110620 | 2017 | Northern Star Resources Ltd | Hardey Project | <1% | Second Partial Surrender Report for E08/1650 |
| A112250 | 2017 | Northern Star Resources Ltd | Hardey | <1% | Annual Mineral Exploration Report for the Hardey Group C122/2011, E08/1650, E08/1915-I and E47/2236-I For the |
| A113966 | 2017 | Riva Resources Ltd | Ashburton | 14% | Combined Annual Report for Ashburton Project C135/2012 for the period 2 March 2016 to 1 March 2017, E08/02209, |
| A115158 | 2017 | State Resources Pty Ltd | Turee Creek | <1% | Annual Technical Report for the Turee Creek Project E47/02427 for the period 19 August 2016 to 18 August 2017 |
| A115197 | 2017 | Fortescue Metals Group Ltd | Capricorn | 32% | C109/2012 Capricorn Final Surrender Report For the Period 19 March 2012 to 16 May 2017, E08/02038, E08/02039, |
| A114826 | 2017 | Baracus Pty Ltd | Turee Creek | <1% | Final report into drilling completed under Exploration Incentive Scheme grant DAG2016/0081536 (R#13) |
| A107963 | 2016 | Northern Star Resources Ltd | Hardey | <1% | Annual Mineral Exploration Report for the Hardey Group C122/2011 for the period 01/01/2015 to 31/12/2015, E 08 |
| A108157 | 2016 | Arc Pty Ltd | Windy Ridge | <1% | Final Surrender Report forE08/2246 Windy Ridge Project 20 December 2011 to 25 January 2016 |
| A108967 | 2016 | Northern Star Resources Ltd | Capricorn Project | 33% | Annual Mineral Exploration Report for the Capricorn Group C109/2012. |
| A110034 | 2016 | State Resources Pty Ltd | Turee Creek | <1% | Annual Mineral Exploration Report for Turee Creek Project E47/02427 For the Period 19 August 2015 to 18 August |
| A110057 | 2016 | Fortescue Metals Group Ltd | Seven Mile | 16% | C15/2016 Seven Mile Annual Report For the Period 1 June 2015 to 31 May 2016, E08/02696, E08/02697, E08/02700, |
| A108605 | 2016 | Dragon Energy Ltd | Ashburton | 14% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2015 to 0 |
| A109557 | 2016 | Fortescue Metals Group Ltd | Mininer | 71% | E08/2354 (Mininer) Final Surrender Report for the period 06/05/2013 - 20/05/2016 |
| A105609 | 2015 | Northern Star Resources Ltd | Capricorn | 33% | Capricorn Project C109/2012 Annual Report to the Department of Mines and Petroleum for the period 29/03/14 to |
| A107498 | 2015 | State Resources Pty Ltd | Turee Creek Project | <1% | Annual Technical Report for Turee Creek Project |
| A104731 | 2015 | Dragon Energy Ltd | Ashburton | 14% | Partial Relinquishment Report- Ashburton Project, E08/2209 - 2211, E47/2417, for the period 02/12/2011 to 09/0 |
| A104914 | 2015 | Northern Star Resources Ltd | Hardey | <1% | Hardey Project C122/ 2011 Annual Report to the Department of Mines and Petroleum for the period 01/01/14 to 31 |
| A106445 | 2015 | Dragon Energy Ltd | Ashburton | 14% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2014 to 0 |
| A107579 | 2015 | Fortescue Metals Group Ltd | Ashburton Downs | 27% | E08/1633 (Ashburton Downs) Final Surrender Report for the period 29 March 2012 to 17 July 2015 |
| A102045 | 2014 | Northern Star Resources Ltd | Capricorn | 33% | CAPRICORN PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the period 29/03/13 to 28/03/14 f |
| A101227 | 2014 | Northern Star Resources Ltd | Hardey | <1% | Hardey Project Annual Report to the Department of Mines and Petroleum for the period 01/01/13 to 31/12/13 for |
| A101744 | 2014 | Dragon Energy Ltd | Ashburton | 14% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2013 to 0 |
| A97674 | 2013 | Dragon Energy Ltd | Ashburton | 14% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2012 to 0 |
| A97763 | 2013 | Northen Star Resources Ltd | Capricorn | 12% | Capricorn (C109/2012) E08/1633, E08/2280, E08/2282 Annual Report to the Department of Mines and Petroleum for |
| A97243 | 2013 | Northern Star Resources Ltd | Ashburton | <1% | Ashburton Project, Annual Report for the period 1st January 2012 to 31st December 2012, M52/734-735, M52/639 & |
| A97406 | 2013 | Arc Pty Ltd | Windy Ridge | <1% | Windy Ridge Project, Annual Report for the period 20th December 2011 to 19th December 2012, E08/2246. |
| A99814 | 2013 | Northern Star Resources Ltd | Electric Dingo | <1% | Electric Dingo E08/1650 (C451/1996) Partial Surrender Report to the Department of Mines and Petroleum for the |
| A89731 | 2011 | Sipa Exploration Nl | Ashburton | <1% | ASHBURTON PROJECT SOUTHEASTERN EXPLORATION AREA M’s 52/639, 640, 734 & 735 E’s 08/1650 & 52/1941 2010 ANNUAL R |
| A90270 | 2011 | Dampier Mining Company Pty Ltd | Windy Ridge | <1% | Windy Ridge Project, Final Surrender Report covering period(s) 14th February 2006 & 21st February2006 to 11th |
| A86843 | 2010 | Arc Pty Ltd | Windy Ridge | <1% | Annual Report For The Period 14 February 2009 to 13 February 2010 Windy Ridge Project E08/1324 and 1325 GSWA R |
| A87072 | 2010 | Dragon Energy | Ashburton | 13% | Combined Annual Report (C52/2007) Ashburton Project; E08/1511-I E08/1512-I E08/1513-I E47/1528-I For the perio |
| A88262 | 2010 | Dragon Energy | Ashburton | 13% | Final Report (C52/2007) Ashburton Project; E08/1511-I E08/1512-I E08/1513-IE47/1528- For the period 1st March |
| A86370 | 2010 | Sipa Exploration Nl | Ashburton | <1% | Ashburton Project, Southeastern Exploration Area, M’s 52/639, 640, 734 & 735, E’s 08/1650, 47/1742, 52/1941, 5 |
| A93222 | 2010 | Northern Star Resources Ltd | Ashburton | <1% | Annual Report for the period 01 January 2011 to 31 December 2011, Ashburton, M52/0734, M52/0735, M52/0639 and |
| A81811 | 2009 | Sipa Exploration Nl | ASHBURTON | <1% | ASHBURTON PROJECT SOUTHEASTERN EXPLORATION AREA C451/1996 M’s 52/639, 640, 734 & 735 E’s 08/1650, 47/1742, 52 |
| A82098 | 2009 | Polaris Metals Nl | ASHBURTON | 15% | ASHBURTON PROJECT PARTIAL SURRENDER REPORT FOR THE PERIOD, 2 FEBRUARY 2006 – 1 FEBRUARY 2008 FOR E08/1511-I TO |
| A82184 | 2009 | Polaris Metals Nl | ASHBURTON | 13% | ASHBURTON PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 2 FEBRUARY 2007 – 1 FEBRUARY 2008 FOR E08/1511-I, E08/ |
| A82279 | 2009 | Arc Pty Ltd | WINDY RIDGE | <1% | ANNUAL REPORT For The Period 14 February 2008 to 13 February 2009, WINDY RIDGE PROJECT GSWA Ref No. C84/2007 E |
| A78487 | 2008 | Polaris Metals Nl | Ashburton | 15% | ASHBURTON PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 2 FEBRUARY 2007 - 1 FEBRUARY 2008 FOR E08/1511-I, E08/ |
| A78523 | 2008 | Arc Pty Ltd | Windy Ridge | <1% | Annual Report for the period 14 February 2007 to 13 February 2008 Windy Ridge Project E08/1324 and 1325 |
| A80066 | 2008 | Korab Resources Ltd | Lohengrin | 57% | Annual Report Year Ended 03 August 2008 E 08/1567 Lohengrin Project |
| A75050 | 2007 | Aztec Resources Ltd | Windy Range | <1% | Annual Report, For The Period 14 February 2006 to 13 February 2007, Windy Ridge Project, E08/1324 and 1325, As |
| A75375 | 2007 | Polaris Metals Nl | Ashburton | 15% | Ashburton project 2007 Annual report E08/1511-1513 01/03/2006-28/02/2007 Report No:2007-25 |
| A76487 | 2007 | Korab Resources Ltd | Lohengrin | 57% | Annual Report Year Ended 03 August 2007 E08/1567, 08/1569 Lohengrin Project |
| A76529 | 2007 | Newcrest Mining Ltd | Ashburton | 49% | ASHBURTON REGIONAL JOINT VENTURE SOUTHEASTERN EXPLORATION AREA MININER E08/1213 PARTIAL SURRENDER REPORT TO TH |
| A77609 | 2007 | Newcrest Mining Ltd | Ashburton | 5.5% | ASHBURTON PROJECT SOUTH EASTERN AREA Annual Technical Report For the Period Ending 31 December, 2007. C451/199 |
| A72103 | 2006 | Newcrest Mining Ltd | Ashburton / Paraburdoo | 24% | Ashburton Project South Eastern Area E08/825, Partial Surrender Report for the Period Ending 2 February 2006, |
| A72410 | 2006 | Newcrest Mining Ltd | Ashburton / Paraburdoo | 49% | Ashburton Regional Joint Venture, South Eastern Exploration Area, Mininer E08/1213, Partial Surrender Report f |
| A74382 | 2006 | Newcrest Mining Ltd | Ashburton | 5.6% | Ashburton Project C451/1996 Annual Technical Report for the Period Ending 31st Dec 2006 Report No.G861/15 (Wyl |
| A70081 | 2005 | Newcrest Mining Ltd | Ashburton | 5.6% | Annual technical report for the period 01/01/04 - 31/12/04 Ashburton Project, C451/1996, E08/821, E08/825, E08 |
| A71906 | 2005 | Newcrest Mining Ltd | Ashburton | 5.6% | Ashburton Project South Eastern Area, Annual Report for the period ending 31 December 2005, Combined Reporting |
| A67953 | 2004 | Sipa Exploration Nl | Mininer | 23% | Annual Report for the period 01/01/2003- 31/12/2003 Baring Downs & Mount Maguire Projects E08/1213, E47/1086 |
| A69408 | 2004 | Newcrest Mining Ltd | Mininer | 49% | Partial Surrender Report for the period ending 16/10/04 Ashburton Regional JV Project, C451/1996, E08/1213. |
| A65844 | 2003 | Sipa Exploration Nl | Ashburton | 23% | Annual Report covering the period October 2001 to December 2002 Ashburton Regional Project E08/1213 'Baring Do |
| A68115 | 2003 | Newcrest Mining Ltd | Ashburton | 3.3% | Ashburton Project, Annual Report Exploration Licences E08/821, 825, 951-953, 1272; E47/825; E52/1077, 1085-108 |
| A64793 | 2002 | Ashburton Minerals Ltd | Ashburton | 22% | E08/923 Annual Report For The Period 08/04/01 to 07/04/02 |
| A66254 | 2002 | Newcrest Mining Ltd | Ashburton | 3.3% | Ashburton Project , Southeastern exploration Area, E08/821, 825, 951, 952, ject C451/1996: E08/821, 825, 95 |
| A63115 | 2001 | Intension Pty Ltd | Mount Elephant | 52% | Exploration License 08/980 Intension NL Reporting Period: 30-12-99 to 29-12-00. |
| A63516 | 2001 | Ashburton Minerals Ltd | Homestead | 22% | E08/923 Annual Report for the period 08/04/00 to 07/04/01. |
| A64295 | 2001 | Newcrest Mining Ltd | Ashburton | 3.3% | Ashburton Project Southeastern exploration area Annual Technical Report to the Department of Minerals & Petrol |
| A59752 | 2000 | Sipa Exploration Nl | Ashburton | 3% | Ashburton Project Southeastern Exploration Area M52/639, M52/640, E52/1077, E52/1085, E52/1086, E52/1148, E52/ |
| A60347 | 2000 | Mr G Barnes | Mount Elephant | 52% | Exploration Licence 08/980, Intension NL, Reporting Period, 30/12/1998 to 29/12/1999. |
| A60804 | 2000 | Newcrest Mining Ltd | Ashburton | 24% | Ashburton Project, Partial Surrender Report for the period ending 02/02/2000, E08/825. [C451/1996] |
| A61884 | 2000 | Newcrest Mining Ltd | Ashburton | 3.3% | Annual Technical Report to the Department of Minerals & Energy for the period ending 31 December 2000 Ashburto |
| A63005 | 2000 | Ashburton Gold Mines Nl | Ashburton | 22% | Annual Report E08/923 08/04/1997 - 07/04/2000 Ashburton Mineral Field, WA. Edmund SF 50-14 Turee Creek SF 50-1 |
| A57467 | 1999 | Intension Pty Ltd | Mount Elephant North | 52% | Mt Elephant North Exploration Licence 08/980, Intension Pty Ltd for the Period 30-12-97 to 29-12-98. |
| A57709 | 1999 | Newcrest Mining Ltd | Ashburton | 24% | Ashburton Project, Partial Surrender Report for the period ending 31/12/1998, E08/825. |
| A53654 | 1998 | Bacome Pty Ltd | Ashburton | 17% | Ashburton Project E08/786 Surrender Report to 14th November 1997. |
| A53655 | 1998 | Bacome Pty Ltd | Ashburton Downs | <1% | Ashburton Project, Combined Annual Report E08/882, 883, 920 for period 1st January 1997 to 31st December 1997. |
| A55814 | 1998 | Sipa Exploration Nl | Ashburton | 3.5% | Ashburton Project Southeastern Exploration area E08/821, 951 952, 953, E47/825, 869, E52/1085, 1152, 1243, 124 |
| A90339 | 1998 | Sipa Exploration Nl | Ashburton - Mount Olympus | 2.8% | Ashburton - Mount Olympus Project, Core Library Drilling Report: Annual Report (Part A) for period 01/01/1997 |
| A51400 | 1997 | Sipa Exploration Nl | Ashburton | 5.3% | Ashburton Regional Project E08/821 E08/825 E47/825 E52/1077 E52/1085 E52/1086 1996 Annual report 4 January 199 |
| A50206 | 1997 | Bacome Pty Ltd | Ashburton | 6.5% | Ashburton Project Annual Report E08/687, 768, 882, 883, 902, 1st January 1995 - 31 December 1996 |
| A48228 | 1996 | Stockdale Prospecting Ltd | Minnierra | 22% | Minnierra Project, Final Report, May 1996, E08/482, 485, 488 & 491 |
| A48012 | 1996 | Stockdale Prospecting Ltd | Capricorn | 11% | Capricorn Project, Final Report covering all work undertaken to 19th February 1996, E47/738-739, 743, 745-750, |
| A46542 | 1995 | Stockdale Prospecting Ltd | Minnierra | 100% | Partial Surrender Report for the period 17/02/92-16/02/95 Minnierra Project E08/485 |
| A45043 | 1995 | Stockdale Prospecting Ltd | Minierra | 11% | Minierra Project, Annual Report Exploration Licences E08/481-482, 484-485, 487-488 & 490-492, July 1995 |
| A41439 | 1994 | Stockdale Prospecting Ltd | Minierra | 11% | Minierra Project, Annual Report for the period ending 17th March 1994, E08/481-482, 484-485, 487-488 & 490-492 |
| A38794 | 1993 | Stockdale Prospecting Ltd | Minierra | 11% | Minierra Project, Annual Report for the period 1st March 1992 to 1st March 1993, E08/481-482, 484-485, 487-488 |
| A30024 | 1990 | Rt Mining Corp Pty Ltd | Silent Sisters | 29% | Silent Sisters Project, Final Surrender Report for the period 02/07/1989 to 26/01/1990, E08/346. |
| A30064 | 1990 | Homestake Australia Ltd | Table Hill | <1% | Table Hill Project, Annual Report for the period 17/08/1988 to 01/02/1990, E08/277,292,294, & 295. |
| A31979 | 1990 | Homestake Australia Ltd | Table Hill | <1% | Table Hill Project, Final Surrender Report, November 1990, E08/277, 292,294 & 295. |
| A33238 | 1990 | Australian Ores & Minerals Ltd | Paraburdoo | 6.5% | Paraburdoo Project, Annual Report for the period October 1989 to June 1990, E08/102. ( Duck Creek JV). |
| A27140 | 1989 | Billiton Australia Pty Ltd | No. 21 Well | 86% | No. 21 Well Project, First annual and final report for the period 16/03/1988 to 05/12/1988, E08/231. |
| A26609 | 1989 | Billiton Australia Pty Ltd | Paraburdoo | 6.5% | Paraburdoo, Annual Report, exploration licence 08/102, 1988. |
| A22727 | 1988 | Billiton Australia Pty Ltd | Paraburdoo - Mount McGrath Joint Venture | 6.5% | Annual report for 1987, E8/102, Paraburdoo, Ashburton Province |
| A21660 | 1987 | Billiton Australia Pty Ltd | Paraburdoo | 6.5% | Paraburdoo Project, Annual Report for the year ending 31/12/1986, E08/102. [Mt McGrath JV] |
| A21559 | 1987 | Alcoa Of Australia Ltd | Bangemall Basin | 1.5% | Bangemall Basin, [Non-statutory Report: Mapping, circa 1966] |
| A10008 | 1981 | Hamersley Exp Pty Ltd | Turee Creek iron / gold / diamond / base | <1% | Temporary Reserve 6982H Annual Report May 12, 1980 to May 11 1981 .Temporary Reserve 6983H Annual Report May 1 |
| A7449 | 1978 | Dampier Mining Co Ltd | Seven Mile Creek- Mount Maguire - Limeri | <1% | Seven Mile Creek - Mt Maguire - Limerick Hill Project, Non-statutory Report: Final Report for the year ending |
| A21557 | 1972 | Alcoa Of Australia Ltd | Bangemall Basin | 1.5% | Bangemall Basin Project, Non-statutory Report: Edmund Area, Plates 1- 5, January 1972, |
| A3898 | 1972 | Universal Milling Co Pty Ltd | Paraburdoo | 49% | Paraburdoo Project, Non-statutory Report: Brief Exploration Report, May 1972, MC08/1350-1351. |
| A1125 | 1968 | Pickands Mather & Co Int | Bali High - Bali Low | <1% | Bali High - Bali Low Project, Final Surrender Report, November 1968, TR70/4352 & 4496H. |
| A1124 | 1967 | Pickands Mather & Co Int | Bali High | <1% | Bali High Project, Non-statutory Report: Preliminary Report, December1967, TR70/4352H. |
| A1595 | 1966 | Ashburton Exp Pty Ltd | M62/0: Ashburton-Bangemall base metal/as | <1% | TR2924H Ashburton Exploration Summary Report for 1965. Programme 1966. |
| A1536 | 1964 | Westfield Minerals Nl | Ashburton - Bangemall | <1% | Ashburton - Bangemall Project, Non-statutory Report : Miscellaneous Data,1964 & Drilling Data (to accompany A |
| A566 | 1964 | Westfield Minerals Nl | Ashburton-Bangemall | <1% | Ashburton-Bangemall Project, Non-statutory Report: Summary Report for 1963 & Projected Development Programme 1 |
| A567 | 1963 | Westfield Minerals Nl | Ashburton-Bangemall | <1% | Ashburton-Bangemall Project, Non-statutory Report: Report of Operations for 1963, November 1963. TR70/2640, 2 |
| A11632 | 1753 | Esso Australia Ltd | Cairn Hill Well | 21% | Cairn Hill Well Project, Non-statutory Report: Final Report for the period 01/12/1981 to 30/11/1982, TR70/8723 |
| A130982 | Australian Exploration, Mining & Construction Company Pty Lt | Ashburton | <1% | Ashburton Gold & Copper Project E08/3113 Annual Report for the period ending 5/4/2022 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 08/3751 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 08/3751? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.