E 08/3861
Register summary
- Holder
- Mcknight, Russell Geoffrey
- Local government
- Shire of Ashburton
- Application received
- 28 Jan 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149297 | 2025 | Jowin Resources Pty Ltd | Henry River Dimension Stone Resource Exp | <1% | E 08/3514 Partial Surrender Henry River Dimension Stone Resource Exploration Project for the period ending 24/ |
| A143152 | 2024 | Surefire Resources Nl | Kooline | 20% | Surrender Report E08/2956 Kooline Project Report 21st January 2019 to March 2024 |
| A144826 | 2024 | Surefire Resources | Kooline | <1% | Kooline E08/2373 Final Surrender Report for the period ending 29/08/2024. |
| A145275 | 2024 | Cazaly Resources Limited | Ashburton | 2.5% | Final Surrender Report for E08/3260 (Combined Reporting Group CR283/2022) for the period 13 October 2022 to 11 |
| A134358 | 2023 | Surefire Resources Nl | Kooline | 20% | Kooline E08/2956 Annual Exploration Report for the period ending 20/01/2023. |
89 more reports
| A137903 | 2023 | Cazaly Resources Limited | Ashburton | 1% | Combined Annual Report C283/2022 Ashburton Project for the period ending 12/10/2023 |
| A129888 | 2022 | Surefire Resources | Kooline | 20% | E08/2956 Kooline Project Annual Technical Report 21st January 2021 to 20th January 2022 |
| A133119 | 2022 | Cazaly Resources Limited | Ashburton | 1% | Annual Report Ashburton Project C283/2022 for the period ending 12/10/2022 |
| A128689 | 2021 | Surefire Resources Nl | Kooline | 20% | Partial Surrender Report Exploration Licence E08/2956 for the period 21/01/2020 to 13/09/2021 |
| A126656 | 2021 | Surefire Resources Nl | Kooline | 20% | Kooline Regional Annual Report E08/2956 for the period ending 21/01/2021 |
| A123308 | 2020 | Roseleigh Nominees Pty Ltd | Corner Bore | <1% | E08/2917 Annual Report Corner Bore Gold Project - 8 December 2018 to 7 November 2019 |
| A123313 | 2020 | Surefire Resources Nl | Kooline | 20% | E08/2956 Annual Technical Report, Kooline, 21 January 2019 to 20 January 2020, |
| A125590 | 2020 | Surefire Resources Nl | Kooline | <1% | Kooline Project E08/2373 Annual Technical Report for the period ending 19/08/2020 |
| A119696 | 2019 | Roseleigh Nominees Pty Ltd | Corner Bore | <1% | E08/2917 Annual Technical Report For the Period 8 December 2017 to 7 December 2018 |
| A121553 | 2019 | Surefire Resources Nl | Kooline | <1% | E08/2373 Partial Surrender Report For the Period 20 August 2013 to 19 August 2019 |
| A118030 | 2018 | Surefire Resources Nl | Kooline | <1% | Kooline Project E08/2373 Annual Technical Report 20/08/2017 to 19/08/2018 |
| A115385 | 2017 | Fortescue Metals Group Ltd | Minnierra | <1% | E08/02690 (C15/2015) Minnierra Project Final Surrender Report for the period 8 December 2015 to 15 May 2017 |
| A108327 | 2016 | Northern Star Resources Ltd | Cheela Project | <1% | Annual Mineral Exploration Report for the Cheela Group C131/2015 For the Period 1 February 2015 to 31 January |
| A109611 | 2016 | Fortescue Metals Group Ltd | Cheela | <1% | C131/2015 Cheela Final Surrender Report for the period 15 June 2010 to 20 May 2016, E08/02296, E08/02295, E08/ |
| A109907 | 2016 | Fortescue Metals Group Ltd | Minnierra | 5.8% | C15/2015 Minnierra Annual Report for the period 1 June 2015 to 31 May 2016, E08/02689, E08/02690 |
| A110270 | 2016 | Ilmenite Resources Pty Ltd | Kooline | <1% | Kooline Project E08/2373 Annual Tenement Report For the Period 20 August 2015 to 19 August 2016 |
| A105201 | 2015 | Baracus Pty Ltd | Ashburton | <1% | Ashburton Project - Final Surrender Report for Exploration Licence 08/2268 for the period 23 May 2012 to 21 J |
| A106362 | 2015 | Baracus Pty Ltd | South Creek | 30% | Final Surrender Report for South Creek Project E08/02375 for the period 12/02/2014 to 21/01/2015 |
| A106363 | 2015 | Baracus Pty Ltd | KP South | 8.4% | Final Surrender Report for KP South Project E08/2374 for the period 12/02/2014 to 21/01/2015 |
| A107506 | 2015 | Fortescue Metals Group Ltd | Cheela | 32% | C200/2011 Cheela Final Surrender Report |
| A105105 | 2015 | Northern Star Resources Ltd | Cheela | 5.4% | Annual Report to the Department of Mines and Petroleum for the period 01/02/14 to 31/01/15, Cheela Project C20 |
| A106575 | 2015 | Ilmenite Resources Pty Ltd | Kooline | <1% | E08/2373 ANNUAL EXPLORATION REPORT Reporting Period 20/08/2014 – 19/08/2015 |
| A107329 | 2015 | Roseleigh Nominees Pty Ltd | Corner Bore | <1% | Annual Report Corner Bore Project E08/2237 For the year ended 19 October 2015 |
| A101312 | 2014 | Northern Star Resources Ltd | Cheela | 8% | Cheela Project C200/2011 Annual Report to the Department of Mines and Petroleum for the period 01/02/13 to 31/ |
| A100933 | 2014 | Baracus Pty Ltd | William Range | 2% | William Range Project, Final Surrender Report for the period 09/04/2013 to 14/11/2013, E08/2339. |
| A102782 | 2014 | Baracus Pty Ltd | Ashburton | <1% | ASHBURTON PROJECT E 08/2268-I ANNUAL MINERAL EXPLORATION REPORT FOR THE PERIOD 23 May 2013 – 22 May 2014 |
| A103357 | 2014 | Ilmenite Resources Pty Ltd | Kooline | <1% | Kooline Project, Annual Report for the period 20/08/2013 to 19/08/2014, E08/2373. |
| A104220 | 2014 | Roseleigh Nominees Pty Ltd | Corner Bore | <1% | Annual Report Corner Bore Project E08/2237 For the year ended 19 October 2014 |
| A99431 | 2013 | Baracus Pty Ltd | Ashburton | <1% | Ashburton Project E08/2268-I Annual Technical Report for the period 23 May 2012 – 22 May 2013 |
| A97352 | 2013 | Fortescue Metals Group Ltd | Cheela | 8.4% | Cheela Project C200/2011 E08/16Annual Report for the period 1/2/2012 to 31/1/2013, E08/1630, 1631, 1632, 1741, |
| A100345 | 2013 | Terra Firma Australia | Corner Bore | <1% | Corner Bore Project, Annual Report for the period 20/10/2012 to 19/10/2013, E08/2237. |
| A93140 | 2012 | Rio Tinto Exploration Pty Ltd | Cube Hill | 3.6% | Cube Hill Annual Report E08/2168 for the Period 25 February 2011 to 24 February 2012 |
| A93876 | 2012 | Athena Resources Ltd | Kooline | 18% | KOOLINE PROJECT, 2012 SURRENDER REPORT, C85/2008, REPORTING PERIOD: 1st May 2007 TO 1st March 2012 |
| A94575 | 2012 | Rio Tinto Exploration Pty Ltd | Cube Hill | 3.6% | Cube Hill, Surrender Report for E08/2168 for the period 25 February 2011 – 06 August 2012 |
| A96015 | 2012 | Shreeve B | Ashburton | <1% | Ashburton Project, Annual Report for the year ending 19th October 2012, E08/2237. |
| A90133 | 2011 | Aurora Minerals Ltd | Capricorn | <1% | Annual Technical Report, Capricorn Project,Bangemall Basin, Western Australia, Tenement Group Code C64/2010, |
| A90637 | 2011 | Athena Resources Ltd | Kooline | 18% | Kooline Project 2011 Annual Report, Period 1st May 2010 to 30th April 2011. |
| A91967 | 2011 | Aurora Minerals Ltd | Capricorn | <1% | Surrender Report, Capricorn Project, Bangemall Basin, WA, Group Reporting Number C64/2010 |
| A86435 | 2010 | Venturex Resources Ltd | Kooline | <1% | Annual Report for the period 25/1/2009 – 24/1/2010, Kooline project, E08/1515 |
| A86603 | 2010 | Aurora Minerals Ltd | Capricorn | <1% | Annual Technical Report for Capricorn Project, C7/2008, E08/1669, E08/1691, E08/1692, E08/1693, E08/1694, E0 |
| A86735 | 2010 | Venturex Resources Ltd | Kooline | <1% | Partial Surrender Report E08/1515, Kooline project |
| A87457 | 2010 | Athena Resources Ltd | Kooline | 18% | Kooline Project , Annual Report, Reporting Period: 1st May 2009 to 30th April 2010, E08/1641,1679 & 1680; M08 |
| A82689 | 2009 | Athena Resources Ltd | KOOLINE | 18% | KOOLINE PROJECT 2009 ANNUAL REPORT C85/2008 , 1st May 2008 TO 30th April 2009 |
| A77526 | 2008 | Jutt Holdings Ltd | Kooline | <1% | Kooline Annual Report E08/1515 In the name of Gallifrey Holdings Pty Ltd For The Period 25/01/2007 - 24/01/200 |
| A78053 | 2008 | Aurora Minerals Ltd | Capricorn | <1% | ANNUAL TECHNICAL REPORT CAPRICORN PROJECT BANGEMALL BASIN WA TENEMENT GROUP CODE C7/2008, Year ending 31 Decem |
| A78730 | 2008 | Athena Resources Ltd | Kooline | 18% | KOOLINE PROJECT 2008 ANNUAL REPORT REPORTING PERIOD: 1st May 2007 TO 30th April 2008 GSWA Ref: C85/2008 |
| A74893 | 2007 | Rocky Crossing Contracting Pty Ltd | Mortimer | 3.4% | Mortimor Project, Annual Report for the period 1st January 2004 to 1st December 2006, E08/1061, M08/66, 71, & |
| A71908 | 2006 | Nustar Mining Corporation Ltd | Metawandy Creek | 6.9% | Annual Report, 1 January 2005 to 31 December 2005, Metawandy Creek Project, 08/853-854, 073, 1096, 1127, 191, |
| A70170 | 2005 | Nustar Mining Corporation Ltd | Metawandy Creek | 6.9% | Annual report for the period 01/01/04 - 31/12/04 Metawandy Creek Project, C92/2001, E08/853, E08/854, E08/1073 |
| A71991 | 2005 | Nustar Mining Corporation Ltd | Paulsens | 24% | Paulsens Project, 29th April 2005, E08/1073, [Application for Extension of Term]. |
| A68141 | 2004 | Rocky Crossing Contracting Pty Ltd | Mout Mortimer Alluvials | 3.4% | Annual Report for the period 30/12/2002-30/12/2003, Mount Mortimer Alluvials Project, E08/1061, M08/66, M08/71 |
| A68609 | 2004 | Nustar Mining Corporation Ltd | Metawandy Creek | 3.9% | Annual report for the period 01/01/2002-31/12/2003 Metawandy Creek Project E08/1073, E08/1096, E08/1127, E08/ |
| A65922 | 2003 | Mr Bridges Kg | Mount Mortimer | 3.4% | Annual Combined Exploration Report 30th December 2001 to 30th December 2002 Mt Mortimer Project E8/1061, M8/66 |
| A66489 | 2003 | St Barbara Mines Ltd | Metawandy | 5.4% | Annual Report 1 January 2002 to 31 December 2002 Metawandy Creek Project C92/2001: E8/1073, 1096, 1127, 1130-3 |
| A67817 | 2003 | Taipan Resources Nl | Paulsens | 24% | Partial Surrender Report for the period 22/5/2000- 23/6/2003 Papoose Project C92/2001, E08/1073 |
| A64263 | 2002 | St Barbara Mines Ltd | Metawandy | 5.4% | Annual Report January 1,2001 To December 31, 2001 Metawandy Project E08/1096, E08/1130, E08/1131, E08/1132, E0 |
| A65710 | 2002 | Ashburton Minerals Ltd | Ashburton | 6.6% | Annual Report E08/926 For The Two Year Period 8 July 2000 - 7 July 2002. |
| A63074 | 2001 | Ashburton Mining Co Pty Ltd | Ashburton | 36% | Annual Report E08/937 20/02/1998 - 19/02/2000 Ashburton Mineral Field, WA., Edmund SF 50-14 1:250,000 sheet. |
| A62787 | 2001 | Mr Bowler Pr | Mount Mortimer | 3.4% | Annual Report Period covered by this report; 19/5/00 to 18/5/01 Tenement covered by this report. Exploration L |
| A62788 | 2001 | Mr Bowler Pr | Mount Mortimer | 3.4% | Annual Report Period covered by this report; 19/5/99 to 18/5/00 Tenement covered by this report. Exploration L |
| A63032 | 2000 | Ashburton Minerals Ltd | Ashburton | 6.6% | Annual Report E08/926 08/07/1997 - 07/07/2000 Ashburton Mineral Field, WA. Edmund SF 50-14 1:250 000 sheet |
| A56049 | 1998 | Mr Jones Df | Mount Mortimer | 3.4% | Combined Annual Report, Ashburton District Mt Mortimer - M/1, 08/66, 08/71, 08/105, Exploration Licence: 08/73 |
| A54282 | 1998 | Rio Tinto Exploration Pty Ltd | Kooline | 35% | Annual Report, Kooline Project, Exploration Licences E08/812, 813,814 ( All Tenements worked), Reporting perio |
| A56869 | 1998 | Ashburton Gold Mines Nl | Ashburton | 6.6% | Annual report for E08/926 08/07/97-07/07/98 Ashburton Mineral Field WA Edmund SF 50-14, 1:250 000 sheet |
| A50713 | 1997 | Cra Exploration Pty Ltd | Kooline | 35% | Kooline Project, Annual Report Exploration Licences E08/812-814 for period 11th December 1995 to 11th December |
| A47323 | 1996 | Stockdale Prospecting Ltd | Minnierra | 17% | Minnierra Project, Surrender Report, E08/479. |
| A48012 | 1996 | Stockdale Prospecting Ltd | Capricorn | 2.8% | Capricorn Project, Final Report covering all work undertaken to 19th February 1996, E47/738-739, 743, 745-750, |
| A43982 | 1995 | Aberfoyle Resources Ltd | Simpson Pool | 11% | Simpson Pool Project, Final Report Exploration Licence E08/368 for the year ended 27th February 1995. |
| A45042 | 1995 | Stockdale Prospecting Ltd | Minnierra West | 2.8% | Minnierra West Project, Annual Report Exploration Licences E08/476-480, 483, 486,& 489 , July 1995. |
| A40911 | 1994 | Aberfoyle Resources Ltd | Simpson Pool | 11% | Simpson Pool Project, Annual Report for the period ending 28th February 1994, E08/368. |
| A40927 | 1994 | Aberfoyle Resources Ltd | Simpson Pool | 11% | Simpson Pool Project, Partial Surrender Report for period ending 28th February 1994, E08/368. |
| A41438 | 1994 | Stockdale Prospecting Ltd | Minierra | 2.8% | Minierra Project, Annual Report for the year ending 17th March 1994, E08/476-480, 483, 486 & 489. |
| A41865 | 1994 | Stockdale Prospecting Ltd | Minnierra | 3.9% | Minnierra Project, Partial Surrender Report, July 1994, E08/477-480, 483, & 486. |
| A38149 | 1993 | Aberfoyle Resources Ltd | Simpson Pool | 11% | Simpson Pool Project, Annual Report for period to 28th February 1993,E08/368. |
| A38795 | 1993 | Stockdale Prospecting Ltd | Minierra | 2.8% | Minierra Project, Annual Report , May 1993, E08/476-480, 483, 486, & 498. |
| A35367 | 1992 | Aberfoyle Resources Ltd | Simpson Pool | 11% | Simpson Pool Project, Annual Report for the period to 28th February 1992, E08/368. |
| A33095 | 1991 | Aberfoyle Resources Ltd | Simpson Pool | 11% | Simpson Pool Project, Annual Report, February 1991, E08/368. |
| A33094 | 1991 | Aberfoyle Resources Ltd | Simpson Pool | 11% | Simpson Pool Project, Partial Surrender Report, February 1991, E08/368. |
| A21559 | 1987 | Alcoa Of Australia Ltd | Bangemall Basin | <1% | Bangemall Basin, [Non-statutory Report: Mapping, circa 1966] |
| A4392 | 1973 | Russgar Minerals Nl | Ashburton Downs | 18% | Ashburton Downs Project, Non-statutory Report: Exploration Report for the year ending 31/12/1973,TR70/5779-578 |
| A21557 | 1972 | Alcoa Of Australia Ltd | Bangemall Basin | <1% | Bangemall Basin Project, Non-statutory Report: Edmund Area, Plates 1- 5, January 1972, |
| A715 | 1970 | Carr Boyd Minerals Ltd | Capricorn Ranges | 17% | Capricorn Ranges Project, Non-statutory Report:Brief Exploration Report, March 1970,TR70/5038H. |
| A716 | 1970 | Carr Boyd Minerals Ltd | Capricorn Ranges | 17% | Capricorn Ranges Project, Non-statutory Report; Brief Exploration Report, August 1970, TR70/5038H. |
| A1125 | 1968 | Pickands Mather & Co Int | Bali High - Bali Low | 5.9% | Bali High - Bali Low Project, Final Surrender Report, November 1968, TR70/4352 & 4496H. |
| A1124 | 1967 | Pickands Mather & Co Int | Bali High | 6% | Bali High Project, Non-statutory Report: Preliminary Report, December1967, TR70/4352H. |
| A81037 | 1753 | Aurora Minerals Ltd | CAPRICORN | <1% | Surrender Report for Capricorn Projec tPart of Common Reporting Number C7/2008 |
| A51641 | 1753 | Mr Jones Df | Mortimer | 3.4% | Combined Annual report period covered by this report 13/10/95 to 31/12/96 Leases covered by this report 'Morti |
| A81036 | 1753 | Aurora Minerals Ltd | Capricorn | <1% | Annual Report for Capricorn Project Common Reporting Number C7/2008 Period ending Dec 31 2008, Exploration Lic |
| A114972 | Surefire Resources Nl | Kooline | <1% | Kooline Project E08/2373 Annual Technical Report for the period 20/08/2016 to 19/08/2017 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 08/3861 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 08/3861 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 08/3861? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.