NextMapsWA TenementsE 15/1446

E 15/1446

LiveExploration LicenceShire of CoolgardieCoolgardie District
Area
3,410ha
Expires
Aug 2027
in 12 months
WAMEX reports
100
WA median is 53
Report drilling
48
of 100 reports
Coolgardie Explore on the live map

Register summary

Holder
Bloomier Resources Pty Ltd
Local government
Shire of Coolgardie
Application received
13 Oct 2014
Commenced
18 Aug 2015
Expiry
17 Aug 2027
Term
5 Years (Extended)

Exploration history on this ground

100 historical WAMEX exploration reports intersect E 15/1446: 57 report geochemistry or sampling, 58 include a digital data package.
When this ground was worked · 98 of 100 reports dated
91960s
1970s
91980s
221990s
162000s
332010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A134903 2023 Alita Resources Limited Bald Hill Lithium & Tantalum <1% Partial Surrender Report E15/1492, E15/1493, E15/1555, E15/1556 Bald Hill Lithium & Tantalum Project for the p
A137957 2023 Liatam Mining Pty Ltd Cowan 53% E15/1446 Partial surrender report Cowan Project for the period ending 31/10/2023.
A133310 2022 Bloomier Resources Pty Ltd Bald Hill <1% Partial Surrender Report E15/1502 & E15/1503 Bald Hill Lithium & Tantalum Project for the period ending 25/10/
A125762 2021 Mount Belches Pty Ltd Cowan <1% Cowan Project E15/1377 Partial Surrender Report for the period ending 11/11/2020
A128373 2021 Bloomier Resources Pty Ltd Bald Hill 53% Partial Surrender Report for Tenement E15/1446 for the period ending 08/08/2021
95 more reports
A123591 2020 Alita Resources Limited Bald Hill <1% 2020 Combined Mineral Exploration Report - C166/2017 Bald Hill Project for the period ending 27/2/2020
A123602 2020 Mount Belches Pty Ltd Cowan 18% Combined Mineral Exploration Report C75/2017 Cowan Project for the period ended 9/3/2020
A122898 2020 Alita Resources Limited Bald Hill <1% Annual Technical Report for Combined Group 31/2011 Bald Hill Lithium Project for the period ending 31/12/2019
A122319 2020 Mount Belches Pty Ltd Cowan <1% Annual Technical Report for Combined Group 150/2016 (Lake Cowan) For the Period 1 November 2018 to 31 October
A119234 2019 Alliance Mineral Assets Limited Bald Hill <1% Annual Technical Report for Combined Group 31/2011 Bald Hill Lithium Project for the period 1 January 2018 to
A118978 2019 Mount Belches Pty Ltd Cowan <1% Annual Technical Report for Combined Group 150/2016 Cowan Project For the Period 1 November 2017 to 31 October
A119932 2019 Mount Belches Pty Ltd Cowan 18% Combined Annual Mineral Exploration Report C75/2017 Cowan Lithium Project for the period 10/03/2018 to 09/03/2
A120390 2019 Alliance Mineral Assets Limited Bald Hill <1% 2019 Combined Annual Mineral Exploration Report - C166/2017 For the Period 28 February 2018 to 27 February 201
A116612 2018 Tawana Resources Nl Cowan 18% Combined Mineral Exploration Report C75/2017, Cowan Project, 10 March 2017 to 09 March 2018
A117108 2018 Alliance Mineral Assets Limited; Lithco No.2 Pty Ltd Bald Hill <1% 2018 Combined Mineral Exploration Report - C166/2017 Bald Hill JV Lithium Project For the Period 28 February 2
A116210 2018 Alliance Mineral Assets Limited Bald Hill <1% Annual Exploration Report for Combined Reporting Number 31/2011 Bald Hill Project for the period 1 January 201
A115546 2018 Metalicity Energy Pty Ltd Lake Cowan <1% Annual Technical Report E15/1502 & 1503, Lake Cowan, 01/11/2016-31/10/2017
A112375 2017 Alliance Mineral Assets Limited Bald Hill <1% C31/2011 Annual Exploration Report for Combined Reporting Number 31/2011 For the Period 1 January 2016 to 31 D
A110639 2017 Mount Belches Pty Ltd Cowan <1% Annual Report E15/1377 for the Year Ended 11/11/2016
A112818 2017 Mt Belches Pty Ltd Cowan <1% Annual Report E15/1205 Cowan Project for the Year Ended 9/03/2017
A108143 2016 Alliance Mineral Assets Limited Bald Hill Tantalite Project <1% Annual Exploration Report for Combined Reporting Number 31/2011
A110082 2016 Mount Belches Pty Ltd Cowan 53% COWAN PROJECT Annual Report for E15/1446 for the Year Ended 17/08/2016
A107301 2015 Alliance Mineral Assets Limited Bald Hill <1% Partial Surrender Report E15/1066 and E15/1067 Bald Hill Project for the period 20 August 2009 to 18 August 20
A106716 2015 Alliance Mineral Assets Limited Bald Hill <1% Bald Hill Tantalite Project C31/2011 Combined Exploration Report for the period 1st January 2014 to 31st Decem
A103699 2014 Silver Lake Resources Limited Yalla Burra 43% Combined Annual / Surrender Report on E15/1312 (Yalla Burra Project) for the period 31 July 2012 to 30 July 20
A101471 2014 Hrm Resources Australia Ltd Bald Hill <1% Annual Report for C31/2011 Bald Eagle Project for the period ended 31/12/2013, E15/1058 ....R15/01
A102154 2014 Octagonal Resources (Wa) Pty Ltd Saint Ives <1% Combined Annual Technical Report for the Period 8 April 2013 to 7 April 2014 St Ives East Project (C156/2012)
A97525 2013 Hrm Resources Australia Ltd Bald Hill <1% Bald Hill Project, Annual Report for the period 1st January 2012 to 31/12/2012, E15/1058, 1066-1067, 1161-1162
A96807 2013 Rising Mining Holdings Pty Ltd Bald Hill <1% Bald Hill Project, Final Surrender Report for the period 03/06/2012 to 02/06/2013, Exploration Licence 15/1103
A99358 2013 Silver Lake Resources Ltd Yalla Burra 43% Yalla Burra Project, Annual Report for the period 31/07/2012 to 30/07/2013, E15/1312.
A93059 2012 Hrm Resources Australia Bald Hill <1% Annual Report for C31/2011 Bald Hill Project for the period 1 January to 31 December 2011
A93163 2012 Rubicon Resources Ltd Yalla Burra <1% Final Report E15/918 2nd March 2007 – 1st March 2012, Yalla Burra
A94983 2012 Rising Mining Holdings Pty Ltd Bald Hill <1% Bald Hill Project Annual Report For the 2012 annual reporting period 03/06/2011 to 02/06/2012, Exploration Lic
A90345 2011 Quadrio Resources Pty Ltd Yalla Burra 15% Yalla Burra Project, Annual Report for the period 1st April 2010 to 31st March 2011, E15/918 & 1028. [C269/20
A90843 2011 Rio Resources Pty Ltd Bald Hill <1% Bald HIll Project, Coolgardie Mineral Field - Western Australia, Annual Report For the 2011 annual reporting p
A91213 2011 Rubicon Resources Ltd Yalla Burra 21% Yalla Burra E15/1028 Final Report12th August 2008 to 11th August 2011
A89291 2011 Living Waters Mining Ltd Bald Hill <1% BALD HILL PROJECT ANNUAL EXPLORATION REPORT FOR MINING LEASE 15-1305
A89079 2010 Living Waters Mining Ltd Bald Hill <1% BALD HILL PROJECT ANNUAL EXPLORATION REPORT FOR PROSPECTING LICENCE 15-4700, OCT 2009 to OCT 2010
A88460 2010 Living Waters Mining Ltd Bald Hill <1% BALD HILL PROJECT, ANNUAL EXPLORATION REPORT, FOR EXPLORATION LICENSE 15-1066,
A87312 2010 Rio Resources Pty Ltd Bald Hill <1% Bald Hill Project, Coolgardie Mineral Field - Western Australia Annual Report For the reporting period 03/06/2
A86933 2010 Dominion Mining Ltd Yalla Burra 15% Yalla Burra Project, Annual Report for the period 1st April 2009 to 31st March 2010, E15/918 & 1028. [C268/20
A85488 2010 Haddington Resources Ltd Bald Hill <1% Partial Surrender Report for Exploration Lease E15/813, Bald Hill, 8th December 2004 to 18th April 2009
A85449 2009 Haddington Resources Ltd Bald Hill <1% Annual Report for Exploration Lease E15/813 Bald Hill for the Period 8th December 2008 TO 7th December 2009
A82571 2009 Rubicon Resources Ltd Yalla Burra 15% Yalla Burra Project, Annual Report for the period 1st April 2008 to 31st March 2009, E15/918 & 1028. [C268/200
A80772 2009 Haddington Resources Ltd Bald Hill <1% ANNUAL REPORT FOR Exploration Lease E15/813 FOR THE PERIOD 8th December 2007 TO 7th December 2008
A76988 2008 Haddington Resources Ltd Bald Hill <1% Annual Report for Exploration Lease E15/813 For the period 8th December 2006 to 7th December 2007
A78253 2008 Rubicon Resources Ltd Yalla Burra <1% Yalla Burra Project, Annual Report for the period 2nd March 2007 to 1st March 2008, E15/918.
A79239 2008 Haddington Resources Ltd Bald Hill <1% Bald Hill Project, Partial Surrender Report for the period 8th December 2004 to 15th May 2008, E15/813.
A74259 2007 Haddington Resources Ltd Bald Hill <1% Annual Report for E15/813 for the Period 8 December 2005 to 7 December 2006, (Bald Hill Project, Widgiemooltha
A72548 2006 Haddington Resources Ltd Bald Hill <1% Annual Report for Haddington Project E15/813 for the Period 8 December 2004 to 7 December 2005, (Bald Hill Pro
A73249 2006 Haddington Resources Ltd Yallaburra/Bald Hill 15% Annual Report for E15/791, 8 June 2005 to 7 June 2006, (Bald Hill Project, Widgiemooltha).
A69431 2004 Tantalum Australia Operations Pty Ltd Binneringie 3.9% Binneringie Tantalum Project, Annual report for period ending November 2004, M15/217, M15/468
A62110 2001 Wmc Resources Ltd St Alvano <1% Combined Annual Technical Report for St Alvano Joint Venture (SAJV) period 01 January 2000 to 31 December 2000
A63771 2001 Tantalum Australia Pty Ltd Binneringie 3.9% Binneringie Tantalite Project M15/217 and M15/468 Annual Report for the period 28th October 2000 to 27th Octob
A74872 2001 Resource Service Group Pty Ltd Bull Oak Dam <1% (Annual Report for 2006), Initial Report on the Geology and Tantalum Resources of the Bull Oak Dam Project, Bi
A62760 2001 Wmc Resources Ltd Saint Alvano 1.4% Saint Alvano Project, Surrender Report For Prospecting Licences 15/4058, 15/4059, 15/4061, 15/4062 and 15/4063
A60175 2000 Wmc Resources Ltd St Alvano <1% Combined Annual Technical Report Period 01/01/1999 to 31/12/1999 Wigiemooltha 1:250,000 sheet SH51-14.
A61367 2000 Mr Dechow Ew Binneringie 3.9% 2000 Annual Report Exploration at the Binneringie Tantalite Deposit (Mining Leases 15/217, 468.)
A58146 1999 Wmc Resources Ltd St Alvano <1% Combined Annual Technical Report for St Alvano Joint Venture (SAJV) March 1999.
A59185 1999 Mr Dechow Ew Binneringie 3.9% Binneringie Tantalite Deposit Mining Leases 15/217, 468 11/1999
A56865 1998 General Gold Resources Nl Mount Belches <1% Mt Belches Project , Annual Report 08/08/97 - 07/08/98 E15/329, 360, 361, 401, E25/96, 97, 100; E28/481-483, 5
A56342 1998 Mr Dechow Ew Binneringie 3.9% 1998 Annual Report Exploration at the Binneringie Tantalite Deposit. M15/217,468.
A55104 1998 Mt Monger Gold Project Pty Ltd Belches <1% Belches Project, Surrender Report GSWA Ref M-8643, DME Ref C110/1994, E15/329, 360, 361, 401, 482, 519, 520 M
A53239 1997 Mt Monger Gold Project Pty Ltd Belches <1% Belches Project, annual Report for the year ending 07/08/1997, E15/329, 360-361, 401, E25/96-97, 100, E28/481-
A51473 1997 Castle Hill Resources Nl Tramways 1% Tramways Project, Annual Report for period 19th April 1996 to 18th April 1997, P15/3524-3530 inc.
A48111 1996 Castle Hill Resources Nl Tramways 1% Tramways Project, Annual Report for the period 19th April 1995 to 18th April 1996, P15/3524-3530 inclusive.
A46630 1996 Horizon Mining Nl Bald Hill 31% Surrender Report for the period 18/08/94-11/11/95 Bald Hill Project E15/248
A49349 1996 Mr Dechow Ew Binneringie 3.9% Annual report Exploration at the Binnerringie Tantalite Deposit (Mining Leases M15/217,M15/468) June to Septem
A49155 1996 Mt Monger Gold Project Pty Ltd Belches <1% Annual Exploration Report Year ending 7th August 1996 Belches Project Combined Reporting Status M-8643 E25/96,
A44708 1995 Castle Hill Resources Nl Tramways 1% Tramways Project, Annual Report Prospecting Licences P15/3524-P15/3530 for the period 19/04/1994 to 18/04/1995
A46148 1995 Bhp Minerals Pty Ltd Belches <1% Belches Project Second Annual Report Exploration Licence E15/329, 360, 361 E25/96, 97, 100, E28/481-483, 519 a
A46228 1995 Crest Resources Australia Nl Bald Hil 9.1% Bald Hil Project, Annual Report E15/368 for the period 17/10/1994 to 16/10/1995.
A43068 1994 Horizon Mining Nl Bald Hill 3.6% 1991 to 1994 for the 'Bald Hill Prospect' Coolgardie Mineral Field Mt Belches 1:100,000 Map Sheet Yardina 1:1
A38784 1993 Poverty Gold Nl Tramways 1% Tramways Project, Non-statutory Report: Progress Report, May 1993, M15/429 & 430.
A36367 1992 Dechow & Co Pty Ltd Eight Mile Dam 95% Eight Mile Dam Project, Non-statutory Report: Annual Report, February 1992, E15/207.
A37343 1992 Nova Resources Nl Bald Hill 26% Annual Report for the Period 01/10/91 to 01/10/92 Bald Hill Project E17/135, E17/178, M17/400 Nova Resources N
A38920 1992 Dechow & Co Pty Ltd Eight Mile Dam 95% Eight Mile Dam Project, Non-statutory Report: Report on Follow up Sampling E15/207, Western Australia, April 1
A39714 1992 Mr Dechow Ew Binneringie 3.9% R Report for the period 1992 Binneringie Project M15/217 M15/468
A30846 1990 Poverty Gold Nl Tramways 5.3% Tramways Project, Annual Report for the period 29th September 1988 to 28th September 1989, M15/309-310, M15/42
A33215 1990 Mr Doutch J Yardina 7.7% Operations Report for ML15/468 From 26/11/89 - 27/11/90 (Yardina Project)
A26496 1989 Gwalia Minerals Nl West Bald Hill 43% West Bald Hill - Tantalum Prospect, Collgardie Mineral Field W.A. (01/1989) Progress Report to January 1989 E1
A29140 1989 Electra Holdings Pty Ltd Binneringie <1% Binneringie Pegmatite M15/217, P15/1159, P15/1460-1463 (1989)
A17577 1986 Metals Exploration Ltd Burbanks <1% Burbanks Project, Annual Report for the period 23/03/1985 to 22/03/1986, P15/159.
A18785 1986 Endeavour Resources Ltd Burbanks East <1% Burbanks East, Annual report on P15/573 for the period 26/10/85 to 26/10/86
A16333 1985 Western Ventures Nl Burbanks <1% Burbanks Project, Annual Report for the period 23/03/1984 to 22/03/1985, P15/159.
A16289 1985 Coopers Resources Nl Randall's 1.3% Randall's Project, Non-statutory Report: A Brief Exploration Report, April 1984, E15/19-21, E28/42-46.
A16291 1985 Coopers Resources Nl Karonie 1.3% Karonie Project, Non-statutory Report: Interpretation of Geophysical Data,April 1985, E15/19-21, E28/42-46.
A16292 1985 Coopers Resources Nl South Randalls 1.3% South Randalls Project, Non-statutory Report: Preliminary Report , Photo Interpretation, E15/19-21, E28/42-46.
A16288 1984 Enterprise Gold Mines Nl South Randalls - Karonie 1.3% South Randalls - Karonie Project, Annual Report for the period ending 31/12/1984, E15/19-21, E28/42-46.
A328 1969 Western Mining Corporation Ltd M99/12: Kambalda nickel / gold operation <1% Kambalda Drilling Data For The Thirteen Periods 9th January, 1968 to 7th January, 1969
A338 1969 Western Mining Corporation Ltd Kambalda <1% Kambalda Project, Non-statutory Report: Geobotanical Investigations at Kambalda, June 1969, TR70/3073H (Red Hi
A1428 1969 Western Mining Corporation Ltd Kambalda <1% Kambalda Project, Annual Report: Induced Polarization & Resisitivity Survey, 1968, TR70/3666.
A317 1968 Western Mining Corporation Ltd Kambalda <1% Kambalda East Project, Annual Report: Diamond Drill Logs & Assay Sheets 1967, TR70/3666H.
A327 1968 Western Mining Corporation Ltd Kambalda <1% Kambalda Project, Non-statutory Report: Kambalda Drilling Data covering the period(s) 01/06/1965 to 09/01/1968
A315 1967 Western Mining Corporation Ltd Kambalda <1% Kambalda Project, Non-statutory Report: I P Profiles , Kambalda, 1965-1967, TR70/3666H.
A313 1967 Western Mining Corporation Ltd Kambalda <1% Kambalda Project, Non-statutory Report: Electro-Sounding Data Sheets, 1965-1966, TR70/3666. (See also A314).
A314 1967 Western Mining Corporation Ltd Kambalda <1% Kambalda Project, Non-statutory Report: Electro-Sounding Data Sheets, 1966-1967, TR70/3666H. (See also A 313).
A316 1967 Western Mining Corporation Ltd Kambalda <1% Kambalda Project, Non-statutory Report: Magnetic Profiles , Kambalda. 1966, TR70/3666H.
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
A105432 Western Mining Corporation Ltd St Ives <1% Historic St Ives Drilling Logs
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
12 months · 17 Aug 2027
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 15/1446 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 15/1446? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.